The Seine-Scheldt inland waterway network - cross border secƟon ...

The Seine-Scheldt inland waterway network - cross border secƟon ...

The Seine-Scheldt inland waterway network - cross border secƟon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commission Decision:<br />

C(2008)8141<br />

Member States involved:<br />

France, Belgium<br />

Implementa� on schedule:<br />

Start date: January 2007<br />

End date: December 2013<br />

Es� mated end year: Post 2015<br />

Budget:<br />

Total project cost: €4,258,697,340<br />

EU contribu� on: €420,190,000<br />

Na� onal budgets: €874,457,340<br />

Regional/local budget: €962,110,000<br />

Ac� on promoter: €1,986,290,000<br />

Other sources: €15,650,000<br />

Percentage of EU support:<br />

Studies and Works: 9.867% (average)<br />

<strong>The</strong> <strong>Seine</strong>-<strong>Scheldt</strong> <strong>inland</strong> <strong>waterway</strong><br />

<strong>network</strong> - <strong>cross</strong> <strong>border</strong> sec� on between<br />

Compiègne and Ghent<br />

2007-EU-30010-P • Part of Priority Project 30<br />

This project, part of Priority Project 30 Inland Waterway <strong>Seine</strong>-<strong>Scheldt</strong> is designed to connect the <strong>Seine</strong> and <strong>Scheldt</strong> river<br />

basins, and, to a broader extent, the en� re Rhine-<strong>Scheldt</strong> delta and the Rhine basin (Priority Project 18 - Waterway axis<br />

Rhine/Meuse-Main-Danube). It will not only help alleviate serious road conges� on which aff ects the north-south economic<br />

axis, but also open up a new European freight corridor between Le Havre, Paris, Dunkerque, Antwerp, Liège and Ro� erdam/<br />

Amsterdam.<br />

Along this corridor, the project will allow the concentra� on of freight in push-tows carrying up to 4,400 tonnes. At the same<br />

� me it will provide high capacity access to the northern seaports – and a catchment market of more than 60 million people. <strong>The</strong><br />

project investments will be aimed at elimina� ng the main bo� lenecks, and will concern the following three sec� ons:<br />

• <strong>Seine</strong>-Ghent<br />

• Condé-Pommeroeul to Sambre<br />

• Upper <strong>Scheldt</strong><br />

MAP Review<br />

<strong>The</strong> Mid Mid-Term Term evalua� evalua�on on concluded that the proj project is signifi cantly behind schedule due to poli� cal, fi nancial and technical<br />

issues. Thus, it will not be completed by the end of 2015. Given this delay, it will not be possible to maintain the EU support<br />

for the part of the ac� vi� es to be carried out a� er 2015. This entails a reduc� on of the TEN-T contribu� on of approximately<br />

€44.3 million. <strong>The</strong> comple� on of around 85% of the project by the end of 2015 is more realis� c, provided that the following<br />

condi� ons are met:<br />

• the compe� � ve dialog of the PPP process is launched by the end of 2010<br />

• the compe� � ve dialog is completed and the contract awarded by the end of 2011<br />

• the project con� nues to respect the revised implementa� on planning provided in the 2010 ASR


5,000<br />

4,500<br />

4,000<br />

3,500<br />

3,000<br />

2,500<br />

2,000<br />

1,500<br />

1,000<br />

500<br />

0<br />

450<br />

400<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

MAP Review<br />

End<br />

2010<br />

End<br />

2011<br />

End<br />

2012<br />

<strong>The</strong> <strong>Seine</strong>-<strong>Scheldt</strong> <strong>inland</strong> <strong>waterway</strong><br />

<strong>network</strong> - <strong>cross</strong> <strong>border</strong> sec� on between<br />

Compiègne and Ghent<br />

2007-EU-30010-P • Part of Priority Project 30<br />

Planned, updated and revised cumulative costs (€ Million)*<br />

4,258.7<br />

End<br />

2013<br />

End<br />

2014<br />

End<br />

2015<br />

4,593.7<br />

4,593.7<br />

Post<br />

2015<br />

Planned costs (Decision) Revised costs (MAP review) Updated costs (as reported by the beneficiary)<br />

End<br />

2010<br />

Planned and revised cumulative TEN-T contribution (€ Million)*<br />

End<br />

2011<br />

End<br />

2012<br />

420.2<br />

End<br />

2013<br />

End<br />

2014<br />

375.9<br />

End<br />

2015<br />

Planned TEN-T contribution (Decision) Revised planned TEN-T contribution (MAP review)<br />

*Rounded fi gures