Commission Decision:<br />
C(2008)8141<br />
Member States involved:<br />
France, Belgium<br />
Implementa� on schedule:<br />
Start date: January 2007<br />
End date: December 2013<br />
Es� mated end year: Post 2015<br />
Budget:<br />
Total project cost: €4,258,697,340<br />
EU contribu� on: €420,190,000<br />
Na� onal budgets: €874,457,340<br />
Regional/local budget: €962,110,000<br />
Ac� on promoter: €1,986,290,000<br />
Other sources: €15,650,000<br />
Percentage of EU support:<br />
Studies and Works: 9.867% (average)<br />
<strong>The</strong> <strong>Seine</strong>-<strong>Scheldt</strong> <strong>inland</strong> <strong>waterway</strong><br />
<strong>network</strong> - <strong>cross</strong> <strong>border</strong> sec� on between<br />
Compiègne and Ghent<br />
2007-EU-30010-P • Part of Priority Project 30<br />
This project, part of Priority Project 30 Inland Waterway <strong>Seine</strong>-<strong>Scheldt</strong> is designed to connect the <strong>Seine</strong> and <strong>Scheldt</strong> river<br />
basins, and, to a broader extent, the en� re Rhine-<strong>Scheldt</strong> delta and the Rhine basin (Priority Project 18 - Waterway axis<br />
Rhine/Meuse-Main-Danube). It will not only help alleviate serious road conges� on which aff ects the north-south economic<br />
axis, but also open up a new European freight corridor between Le Havre, Paris, Dunkerque, Antwerp, Liège and Ro� erdam/<br />
Amsterdam.<br />
Along this corridor, the project will allow the concentra� on of freight in push-tows carrying up to 4,400 tonnes. At the same<br />
� me it will provide high capacity access to the northern seaports – and a catchment market of more than 60 million people. <strong>The</strong><br />
project investments will be aimed at elimina� ng the main bo� lenecks, and will concern the following three sec� ons:<br />
• <strong>Seine</strong>-Ghent<br />
• Condé-Pommeroeul to Sambre<br />
• Upper <strong>Scheldt</strong><br />
MAP Review<br />
<strong>The</strong> Mid Mid-Term Term evalua� evalua�on on concluded that the proj project is signifi cantly behind schedule due to poli� cal, fi nancial and technical<br />
issues. Thus, it will not be completed by the end of 2015. Given this delay, it will not be possible to maintain the EU support<br />
for the part of the ac� vi� es to be carried out a� er 2015. This entails a reduc� on of the TEN-T contribu� on of approximately<br />
€44.3 million. <strong>The</strong> comple� on of around 85% of the project by the end of 2015 is more realis� c, provided that the following<br />
condi� ons are met:<br />
• the compe� � ve dialog of the PPP process is launched by the end of 2010<br />
• the compe� � ve dialog is completed and the contract awarded by the end of 2011<br />
• the project con� nues to respect the revised implementa� on planning provided in the 2010 ASR
5,000<br />
4,500<br />
4,000<br />
3,500<br />
3,000<br />
2,500<br />
2,000<br />
1,500<br />
1,000<br />
500<br />
0<br />
450<br />
400<br />
350<br />
300<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
MAP Review<br />
End<br />
2010<br />
End<br />
2011<br />
End<br />
2012<br />
<strong>The</strong> <strong>Seine</strong>-<strong>Scheldt</strong> <strong>inland</strong> <strong>waterway</strong><br />
<strong>network</strong> - <strong>cross</strong> <strong>border</strong> sec� on between<br />
Compiègne and Ghent<br />
2007-EU-30010-P • Part of Priority Project 30<br />
Planned, updated and revised cumulative costs (€ Million)*<br />
4,258.7<br />
End<br />
2013<br />
End<br />
2014<br />
End<br />
2015<br />
4,593.7<br />
4,593.7<br />
Post<br />
2015<br />
Planned costs (Decision) Revised costs (MAP review) Updated costs (as reported by the beneficiary)<br />
End<br />
2010<br />
Planned and revised cumulative TEN-T contribution (€ Million)*<br />
End<br />
2011<br />
End<br />
2012<br />
420.2<br />
End<br />
2013<br />
End<br />
2014<br />
375.9<br />
End<br />
2015<br />
Planned TEN-T contribution (Decision) Revised planned TEN-T contribution (MAP review)<br />
*Rounded fi gures