<strong>EIA</strong>/<strong>EMP</strong> <strong>Report</strong> <strong>of</strong> <strong>Beneficiation</strong> <strong>Plant</strong> <strong>–BRPL</strong><br />
transportation system design criteria. The concentrate shall also have<br />
approximately 80% <strong>of</strong> (-) 325 mesh (- 45 micron) material and a nominal grade<br />
<strong>of</strong> 64.5% Fe to meet the pellet plant process requirement.<br />
Two identical beneficiation circuits, each with a capacity to produce 2 mio tpa <strong>of</strong><br />
iron ore concentrate are envisaged. <strong>Beneficiation</strong> process consists <strong>of</strong>:<br />
• Primary wet grinding;<br />
• Hydro cycloning;<br />
• Two stage spiral classification;<br />
• Single stage high gradient magnetic separation;<br />
• Regrinding and thickening <strong>of</strong> concentrate received from both spirals; and<br />
• Magnetic separators.<br />
The details <strong>of</strong> main machinery/equipment envisaged for the proposed beneficiation<br />
plant are as per given below:<br />
Sn Particulars Quantity Capacity<br />
1 Primary ball mill 2 330 tph (each)<br />
2 Primary Hydro cyclone (26” dia.) 10 100 tph (each)<br />
3 Primary spirals 308 starts -<br />
4 Cleaner spirals 228 starts -<br />
5 Secondary Hydro cyclone (10” dia.) 20 50 tph (each)<br />
6 Regrinding ball mill 2 230 tph (each)<br />
7 Linear screen 2 151.5 tph (each)<br />
8 Cone splitter 2 28 tph (each)<br />
9 HGMS 2 137.5 tph (each)<br />
10 Intermediate Thickener (55m dia.) 1 303 tph<br />
11 Concentrate Thickener (48m dia.) 1 558 tph<br />
12 Tailing Thickener (60m dia.) 1 98 tph<br />
13 EOT crane (Ball mill Bay) 2 60t/10t<br />
14 EOT crane (HGMS Bay) 2 12t/3t<br />
� Power<br />
Total power requirement during operation phase <strong>of</strong> the proposed beneficiation<br />
plant shall be 18.5 MW which is proposed to be obtained from the North Eastern<br />
Electricity Supply Company <strong>of</strong> Orissa Ltd. (NESCO). One standby Diesel<br />
Generator having a capacity <strong>of</strong> 750 KW is envisaged which shall be used in case<br />
<strong>of</strong> power failure only.<br />
0.3 ANTICIPATED ENVIRONMENT IMPACTS & MITIGATION MEASURES<br />
� Land Use Pattern<br />
About 59.81% <strong>of</strong> total land proposed to be acquired belongs to government land<br />
while rest <strong>of</strong> the land belongs to private land. About 44.25% <strong>of</strong> total land is<br />
designated as jungle as per local revenue records. No cultivated and grazing land<br />