EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...

EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...

EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

By trucks/<br />

dumpers<br />

2 Handling &<br />

storage at plant<br />

site<br />

3 Operation <strong>of</strong> DG<br />

set in case <strong>of</strong><br />

power failure<br />

S.S.Environics (India) Pvt. Ltd.<br />

• Dust<br />

• Dust, SO2, NOX &<br />

CO due to<br />

Vehicular<br />

movement<br />

<strong>EIA</strong>/<strong>EMP</strong> <strong>Report</strong> <strong>of</strong> <strong>Beneficiation</strong> <strong>Plant</strong> <strong>–BRPL</strong><br />

• Trucks shall be properly covered with<br />

tarpaulin<br />

• Preventive maintenance <strong>of</strong> vehicles<br />

• Fugitive Dust • Adequate arrangement for water spray<br />

shall be provided<br />

• Storage yard shall be properly fenced<br />

and bushes shall be planted at the<br />

periphery <strong>of</strong> yard<br />

• SPM, SO2, NOX &<br />

CO<br />

• Adequate stack height as per CPCB<br />

guidelines shall be provided<br />

Mitigation Measures<br />

In addition to mentioned above, other mitigation measures are as per given<br />

below:<br />

• Level sensor to have a gap <strong>of</strong> only half-meter in between stacking boom and<br />

top <strong>of</strong> pile;<br />

• <strong>Plant</strong> roads & approach roads shall be made <strong>of</strong> bitumen/ concrete; and<br />

• Effective house keeping shall be carried out.<br />

� Water Quality<br />

During beneficiation process, water shall be discharged via three different ways:<br />

o Along with tailings to tailing dam;<br />

o Along with beneficiated iron ore to pellet plant at Jajpur; and<br />

o As domestic waste water.<br />

It is envisaged that:<br />

• Tailings shall not contain any soluble mineral hence; overflow from dam shall<br />

be recycled back to process @ 2352 m 3 /day (max) and 1892 m 3 /day<br />

(average);<br />

• At pellet plant, water resulting from filtration <strong>of</strong> slurry shall be used for<br />

process and domestic usage after adequate treatment; and<br />

• Domestic waste water shall be generated @31m 3 /day. Primary and<br />

secondary treatment shall be provided to make treated water fit for irrigation<br />

purposes to be used for green belt development /plantation.<br />

In addition to above, water quality <strong>of</strong> the study area may get affected due to:<br />

1. Ground water quality due to leaching from tailing dam<br />

The sub soil investigation <strong>of</strong> the site allocated for tailing pond and on the axis <strong>of</strong><br />

the proposed earthen dam indicates that the top soil is <strong>of</strong> gray colored clay soil<br />

with gravel up to 1.5 m level form top. The permeability <strong>of</strong> soil is 4.21x10 -4<br />

cm/sec. The next layer consists <strong>of</strong> boulder mixed gravel up to 6.0m. There after,<br />

disintegrated rock strata is encountered.<br />