EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...
EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...
EIA/EMP Report of Beneficiation Plant –BRPL - State Pollution ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
By trucks/<br />
dumpers<br />
2 Handling &<br />
storage at plant<br />
site<br />
3 Operation <strong>of</strong> DG<br />
set in case <strong>of</strong><br />
power failure<br />
S.S.Environics (India) Pvt. Ltd.<br />
• Dust<br />
• Dust, SO2, NOX &<br />
CO due to<br />
Vehicular<br />
movement<br />
<strong>EIA</strong>/<strong>EMP</strong> <strong>Report</strong> <strong>of</strong> <strong>Beneficiation</strong> <strong>Plant</strong> <strong>–BRPL</strong><br />
• Trucks shall be properly covered with<br />
tarpaulin<br />
• Preventive maintenance <strong>of</strong> vehicles<br />
• Fugitive Dust • Adequate arrangement for water spray<br />
shall be provided<br />
• Storage yard shall be properly fenced<br />
and bushes shall be planted at the<br />
periphery <strong>of</strong> yard<br />
• SPM, SO2, NOX &<br />
CO<br />
• Adequate stack height as per CPCB<br />
guidelines shall be provided<br />
Mitigation Measures<br />
In addition to mentioned above, other mitigation measures are as per given<br />
below:<br />
• Level sensor to have a gap <strong>of</strong> only half-meter in between stacking boom and<br />
top <strong>of</strong> pile;<br />
• <strong>Plant</strong> roads & approach roads shall be made <strong>of</strong> bitumen/ concrete; and<br />
• Effective house keeping shall be carried out.<br />
� Water Quality<br />
During beneficiation process, water shall be discharged via three different ways:<br />
o Along with tailings to tailing dam;<br />
o Along with beneficiated iron ore to pellet plant at Jajpur; and<br />
o As domestic waste water.<br />
It is envisaged that:<br />
• Tailings shall not contain any soluble mineral hence; overflow from dam shall<br />
be recycled back to process @ 2352 m 3 /day (max) and 1892 m 3 /day<br />
(average);<br />
• At pellet plant, water resulting from filtration <strong>of</strong> slurry shall be used for<br />
process and domestic usage after adequate treatment; and<br />
• Domestic waste water shall be generated @31m 3 /day. Primary and<br />
secondary treatment shall be provided to make treated water fit for irrigation<br />
purposes to be used for green belt development /plantation.<br />
In addition to above, water quality <strong>of</strong> the study area may get affected due to:<br />
1. Ground water quality due to leaching from tailing dam<br />
The sub soil investigation <strong>of</strong> the site allocated for tailing pond and on the axis <strong>of</strong><br />
the proposed earthen dam indicates that the top soil is <strong>of</strong> gray colored clay soil<br />
with gravel up to 1.5 m level form top. The permeability <strong>of</strong> soil is 4.21x10 -4<br />
cm/sec. The next layer consists <strong>of</strong> boulder mixed gravel up to 6.0m. There after,<br />
disintegrated rock strata is encountered.<br />
vi