Fair Haven Biomass Project, PSB Docket No.<br />
<strong>Pre</strong>filed <strong>Testimony</strong> <strong>of</strong> <strong>David</strong> <strong>Raphael</strong><br />
November 2, 2010<br />
Page 2 <strong>of</strong> 6<br />
1 planning. graphic communications <strong>and</strong> GIS mapping. permit planning.<br />
2 participatory <strong>and</strong> community planning, downtown revitalization, open space <strong>and</strong><br />
3 conservation planning, zoning ordinance <strong>and</strong> design review development,<br />
4 l<strong>and</strong>scape architecture <strong>and</strong> environmental design. At L<strong>and</strong>Works we have<br />
5 worked as advocates for communities, appellants. the State <strong>of</strong> <strong>Vermont</strong>, <strong>and</strong><br />
6 private corporations. I personally have testified <strong>and</strong> served as an expert witness<br />
7 before most <strong>of</strong> the Disti-ict Commissions in the State <strong>and</strong> the former<br />
8 Environmental Board, as well as the <strong>Public</strong> Service Board.<br />
9 L<strong>and</strong>Works has extensive experience with regard to visual assessment <strong>and</strong><br />
10 environmental impact, Criterion 8 <strong>of</strong> Act 250, <strong>and</strong> the design <strong>and</strong> installation <strong>of</strong><br />
II utility facilities <strong>and</strong> structures. We have evaluated the aesthetic <strong>and</strong><br />
12 environmental impact <strong>of</strong> (I) transmission lines arid corridors (including the<br />
13 Northwest Reliability, Lamoille <strong>and</strong> Southern Loop projects, <strong>and</strong> the PV2O line<br />
14 removal along the Route 2 causeway in Milton/South Hero): (2)<br />
15 telecommunication facilities (Coy Mountain tower proposal <strong>and</strong> four<br />
16 telecommunications facilities in Essex <strong>and</strong> Milton. <strong>Vermont</strong> proposed by<br />
17 FairPoint Communications); <strong>and</strong> (3) wind energy development, the Searsburg<br />
18 Project, the Sheffield Project (on behalf <strong>of</strong> UPC, now First Wind), <strong>and</strong> three wind<br />
19 projects in Maine (on behalf <strong>of</strong> First Wind). We have prepared feasibility studies<br />
20 for wind energy facilities siting for the Lamoille County Development<br />
21 Commission. I have served as a member <strong>of</strong> the Design Issues Study Committee<br />
22 appointed by the Secretary <strong>of</strong> the Agency <strong>of</strong> Natural Resources, an initiative