29.01.2013 Views

Pre-Filed Testimony and Exhibits of David Raphael - Vermont Public ...

Pre-Filed Testimony and Exhibits of David Raphael - Vermont Public ...

Pre-Filed Testimony and Exhibits of David Raphael - Vermont Public ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fair Haven Biomass Project, PSB Docket No.<br />

<strong>Pre</strong>filed <strong>Testimony</strong> <strong>of</strong> <strong>David</strong> <strong>Raphael</strong><br />

November 2, 2010<br />

Page 2 <strong>of</strong> 6<br />

1 planning. graphic communications <strong>and</strong> GIS mapping. permit planning.<br />

2 participatory <strong>and</strong> community planning, downtown revitalization, open space <strong>and</strong><br />

3 conservation planning, zoning ordinance <strong>and</strong> design review development,<br />

4 l<strong>and</strong>scape architecture <strong>and</strong> environmental design. At L<strong>and</strong>Works we have<br />

5 worked as advocates for communities, appellants. the State <strong>of</strong> <strong>Vermont</strong>, <strong>and</strong><br />

6 private corporations. I personally have testified <strong>and</strong> served as an expert witness<br />

7 before most <strong>of</strong> the Disti-ict Commissions in the State <strong>and</strong> the former<br />

8 Environmental Board, as well as the <strong>Public</strong> Service Board.<br />

9 L<strong>and</strong>Works has extensive experience with regard to visual assessment <strong>and</strong><br />

10 environmental impact, Criterion 8 <strong>of</strong> Act 250, <strong>and</strong> the design <strong>and</strong> installation <strong>of</strong><br />

II utility facilities <strong>and</strong> structures. We have evaluated the aesthetic <strong>and</strong><br />

12 environmental impact <strong>of</strong> (I) transmission lines arid corridors (including the<br />

13 Northwest Reliability, Lamoille <strong>and</strong> Southern Loop projects, <strong>and</strong> the PV2O line<br />

14 removal along the Route 2 causeway in Milton/South Hero): (2)<br />

15 telecommunication facilities (Coy Mountain tower proposal <strong>and</strong> four<br />

16 telecommunications facilities in Essex <strong>and</strong> Milton. <strong>Vermont</strong> proposed by<br />

17 FairPoint Communications); <strong>and</strong> (3) wind energy development, the Searsburg<br />

18 Project, the Sheffield Project (on behalf <strong>of</strong> UPC, now First Wind), <strong>and</strong> three wind<br />

19 projects in Maine (on behalf <strong>of</strong> First Wind). We have prepared feasibility studies<br />

20 for wind energy facilities siting for the Lamoille County Development<br />

21 Commission. I have served as a member <strong>of</strong> the Design Issues Study Committee<br />

22 appointed by the Secretary <strong>of</strong> the Agency <strong>of</strong> Natural Resources, an initiative

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!