COMMENCEMENT OF OPERATION<br />

2010 <strong>OHL</strong> <strong>Group</strong> <strong>Annual</strong> <strong>Report</strong><br />

During 2010, in line with the investment program and the commitments acquired<br />

with respect to a number of government administrations in Spain and abroad, <strong>OHL</strong><br />

Concessions has opened to traffic several road sections and has completed the<br />

consolidation of multimodal transportation in the Terminales Marítimas del Sureste<br />

concession.<br />

SPAIN<br />

During the first half of the month of August, the concession company Autovía de Aragón<br />

Tramo I opened to traffic the third lane of the A-2 Freeway between kilometers 23 and<br />

30, Alcalá de Henares bypass, in the Community of Madrid.<br />

At the Port of Alicante, during the month of September, Terminales Marítimas del<br />

Sureste (TMS) formally opened the railway access to its container terminal, providing<br />

the port with the possibility of having its own connection to the national railway network<br />

for operating the shipment of cargo to and from the Canary Islands.<br />

CHILE<br />

Section 3 of the eastern sector of the Los Andes toll road was opened to traffic on<br />

January 12. This 8-km-long section with two lanes in each direction connects Llay Llay<br />

with the Pan American Highway.<br />

MEXICO<br />

The second and third sections of the first phase of the Bicentennial Viaduct were<br />

formally opened in the State of Mexico between the months of September and<br />

November. The 17 kilometers put into operation in the two sections completed the 22<br />

km of this first stage of the viaduct, which operates at the present time on a reversible<br />

basis in the metropolitan area of the Valley of Mexico.<br />

Also in the State of Mexico, the first 10-km section, Guadalupe Lake-Vialidad<br />

Mexiquense, of Phase III of the Circuito Exterior Mexiquense beltway commenced<br />

operation on September 29. This phase comprises the northwest arm of this<br />

infrastructure, which bypasses the country’s capital from north to south and is<br />

scheduled for completion in 2011.<br />

CONSTRUCTION STARTS<br />

In fulfillment of the construction and infrastructure improvement commitments acquired<br />

through awards to <strong>OHL</strong> Concessions, the following projects were initiated in the course<br />

of the 2010 financial year:<br />

The listing of<br />

<strong>OHL</strong> México on<br />

the Mexican<br />

Stock Exchange<br />

was the largest<br />

listing operation<br />

in this market in<br />

the last 10 years<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!