during the year within the country and abroad<br />

(including utility, industrial and overseas sets).<br />

� <strong>In</strong> addition to commissioning of utility projects, BHEL<br />

has synchronized 272 MW [Chutak-1, 2(2X11 MW)<br />

and Parichha -5 (250 MW)], awaiting clearance from<br />

utilities for capacity addition.<br />

Utility sets commissioned during the year were-<br />

� Kothagudam(Stg VI)U-1(500 MW), Simhadri U-4<br />

(500 MW) in Andhra Pradesh.<br />

� Lakwa WHRP (37 MW) in Assam.<br />

� Pragati STG U-1 (250 MW) in Delhi.<br />

� Hazira CCPP Extn GT &ST (351 MW) in Gujarat.<br />

� Jhajjar U-2 (500 MW) in Haryana.<br />

� Koderma U-1 (500 MW), Maithon RBC U-1,2 (2X525<br />

MW) in Jharkhand.<br />

� Bellary U-2 (500 MW) in Karnataka.<br />

� Bhusawal U-4,5 (2X500 MW), Khaperkheda Expn-1<br />

(500 MW) in Maharashtra.<br />

� Neyveli (Stg II) U-1 (250 MW), Vallur U-1 (500 MW)<br />

in Tamilnadu.<br />

� Harduaganj U-8 in Uttar Pradesh.<br />

� Koteshwar HEP U-3,4 (2X100 MW) in Uttrakhand.<br />

� Durgapur U-1,2 (2X500 MW), Santaldih U-6 (250<br />

MW) in West Bengal.<br />

Overseas sets commissioned by BHEL during the year<br />

include Devighat U-4,5 (2X5 MW), Oman U-1,2 (2X126<br />

MW), Taiwan (63 MW).<br />

ERECTION & COMMISSIONING HIGHLIGHTS<br />

� During the XI Plan period BHEL commissioned<br />

25,385 MW of Utility sets which is nearly double of<br />

13,613 MW achieved in X Plan period.<br />

ANNUAL REPORT 2011-12<br />

35<br />

� Highest ever 8410 MW utility projects<br />

�<br />

commissioned/ synchronized during a year.<br />

All time high 8138 MW capacity added for utilities<br />

during a year: 29 % up from the previous year.<br />

� First Time achievements:<br />

� BHEL commissioned 1xFr-9 FA Gas Turbinebased<br />

Combined Cycle Power Plant (CCPP-351<br />

MW) of GSEGL at Hazira, Gujarat followed by<br />

2xFr-9 FA CCPP of PPCL at Pragati-III (750MW-<br />

Module I) Delhi.<br />

� BHEL has commissioned its first unit of 525 MW<br />

rating with commissioning of 2X525 MW at<br />

Maithon. This new Rating set has been introduced<br />

to cater to country’s specific market requirement.<br />

� BHEL has also achieved capacity addition of its<br />

first 250 MW set with CFBC boiler at Neyveli. This<br />

is the highest rating unit with CFBC boiler<br />

commissioned in the country.<br />

� During the year, 13 sets of 500/525 MW ratings were<br />

commissioned, surpassing the previous best of 8 sets.<br />

� BHEL commissioned 3625 MW in a single month.<br />

� Full load operations of NTPC Simhadri Unit 4<br />

achieved within 6 hrs of synchronization indicating<br />

BHEL’s equipment reliability and commissioning<br />

prowess.<br />

� For THDC <strong>In</strong>dia <strong>Ltd</strong>, 100% targeted capacity addition<br />

was achieved during the XI plan despite flooding at<br />

Koteshwar power station of THDC.<br />

� Significantly, thermal and hydro units with a<br />

cumulative capacity of 1625 MW were<br />

commissioned at various power stations across the<br />

country in a span of just 24 hours.<br />

2x100 MW (Units 3&4) Hydro Sets for THDC, Koteshwar 1500 MW Pragati Combined Cycle Power Project, Bawana