during the year within the country and abroad<br />
(including utility, industrial and overseas sets).<br />
� <strong>In</strong> addition to commissioning of utility projects, BHEL<br />
has synchronized 272 MW [Chutak-1, 2(2X11 MW)<br />
and Parichha -5 (250 MW)], awaiting clearance from<br />
utilities for capacity addition.<br />
Utility sets commissioned during the year were-<br />
� Kothagudam(Stg VI)U-1(500 MW), Simhadri U-4<br />
(500 MW) in Andhra Pradesh.<br />
� Lakwa WHRP (37 MW) in Assam.<br />
� Pragati STG U-1 (250 MW) in Delhi.<br />
� Hazira CCPP Extn GT &ST (351 MW) in Gujarat.<br />
� Jhajjar U-2 (500 MW) in Haryana.<br />
� Koderma U-1 (500 MW), Maithon RBC U-1,2 (2X525<br />
MW) in Jharkhand.<br />
� Bellary U-2 (500 MW) in Karnataka.<br />
� Bhusawal U-4,5 (2X500 MW), Khaperkheda Expn-1<br />
(500 MW) in Maharashtra.<br />
� Neyveli (Stg II) U-1 (250 MW), Vallur U-1 (500 MW)<br />
in Tamilnadu.<br />
� Harduaganj U-8 in Uttar Pradesh.<br />
� Koteshwar HEP U-3,4 (2X100 MW) in Uttrakhand.<br />
� Durgapur U-1,2 (2X500 MW), Santaldih U-6 (250<br />
MW) in West Bengal.<br />
Overseas sets commissioned by BHEL during the year<br />
include Devighat U-4,5 (2X5 MW), Oman U-1,2 (2X126<br />
MW), Taiwan (63 MW).<br />
ERECTION & COMMISSIONING HIGHLIGHTS<br />
� During the XI Plan period BHEL commissioned<br />
25,385 MW of Utility sets which is nearly double of<br />
13,613 MW achieved in X Plan period.<br />
ANNUAL REPORT 2011-12<br />
35<br />
� Highest ever 8410 MW utility projects<br />
�<br />
commissioned/ synchronized during a year.<br />
All time high 8138 MW capacity added for utilities<br />
during a year: 29 % up from the previous year.<br />
� First Time achievements:<br />
� BHEL commissioned 1xFr-9 FA Gas Turbinebased<br />
Combined Cycle Power Plant (CCPP-351<br />
MW) of GSEGL at Hazira, Gujarat followed by<br />
2xFr-9 FA CCPP of PPCL at Pragati-III (750MW-<br />
Module I) Delhi.<br />
� BHEL has commissioned its first unit of 525 MW<br />
rating with commissioning of 2X525 MW at<br />
Maithon. This new Rating set has been introduced<br />
to cater to country’s specific market requirement.<br />
� BHEL has also achieved capacity addition of its<br />
first 250 MW set with CFBC boiler at Neyveli. This<br />
is the highest rating unit with CFBC boiler<br />
commissioned in the country.<br />
� During the year, 13 sets of 500/525 MW ratings were<br />
commissioned, surpassing the previous best of 8 sets.<br />
� BHEL commissioned 3625 MW in a single month.<br />
� Full load operations of NTPC Simhadri Unit 4<br />
achieved within 6 hrs of synchronization indicating<br />
BHEL’s equipment reliability and commissioning<br />
prowess.<br />
� For THDC <strong>In</strong>dia <strong>Ltd</strong>, 100% targeted capacity addition<br />
was achieved during the XI plan despite flooding at<br />
Koteshwar power station of THDC.<br />
� Significantly, thermal and hydro units with a<br />
cumulative capacity of 1625 MW were<br />
commissioned at various power stations across the<br />
country in a span of just 24 hours.<br />
2x100 MW (Units 3&4) Hydro Sets for THDC, Koteshwar 1500 MW Pragati Combined Cycle Power Project, Bawana