10.02.2013 Views

Program - 62nd CIRP General Assembly Hong Kong, China. 2012

Program - 62nd CIRP General Assembly Hong Kong, China. 2012

Program - 62nd CIRP General Assembly Hong Kong, China. 2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wednesday, 22 August 10:30 – 12:00<br />

Ballroom I, 1/F<br />

O5 -<br />

O13 -<br />

O14 -<br />

Simulation Based Comparison of Safety-stock Calculation Methods<br />

Matthias Schmidt, Wiebke Hartmann, Peter Nyhuis (2)<br />

Modeling of machine tools using smart interlocking software blocks<br />

Aydin Nassehi, Stephen T. Newman (2)<br />

Design and assessment of quality control loops for stable business<br />

processes<br />

Robert Schmitt (2), Laszlo Monostori (1), Henrik Glöckner, Zsolt Janos<br />

Viharos<br />

Wednesday, 22 August 14:30 – 15:30<br />

Ballroom I, 1/F<br />

O15 -<br />

O16 -<br />

Combination of Planning Methods in a Comprehensive Production<br />

Planning Approach for Sequenced Production Lines<br />

Kurt Matyas, Stefan Auer / H.J. Warnecke (1)<br />

Scheduling with alternative routings in CNC workshops<br />

Youichi Nonaka (3), Gabor Erdos, Tamas Kis, Takahiro Nakano (3),<br />

Jozsef Vancza (1)<br />

Wednesday, 22 August 16:00 – 18:00<br />

Ballroom I, 1/F<br />

O17 -<br />

O18 -<br />

O19 -<br />

O20 -<br />

Integrated Quality, Production Logistics and Maintenance Analysis of<br />

Multi-Stage Asynchronous Manufacturing Systems with Degrading<br />

Machines<br />

Marcello Colledani, Tullio Tolio (1)<br />

Energy-aware scheduling for improving manufacturing process<br />

sustainability: a mathematical model for flexible flow shops<br />

Alessandro Arturo Giuseppe Bruzzone (1), Davide Anghinolfi, Massimo<br />

Paolucci, Flavio Tonelli<br />

Integrating sustainability within the factory planning process<br />

Danfang Chen, Steffen Heyer, Günther Seliger (1), Torsten Kjellberg (1)<br />

A Proposal on Optimized Scheduling Methodology and its Application<br />

to an Actual-Scale Semiconductor Manufacturing Problem<br />

Toshiya Kaihara (2), Shinji Kurose, Nobutada Fujii<br />

47<br />

Session on Production System and Organization (O)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!