Program - 62nd CIRP General Assembly Hong Kong, China. 2012
Program - 62nd CIRP General Assembly Hong Kong, China. 2012
Program - 62nd CIRP General Assembly Hong Kong, China. 2012
- TAGS
- cirp
- assembly
- hong
- kong
- www.cirp2012.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wednesday, 22 August 10:30 – 12:00<br />
Ballroom I, 1/F<br />
O5 -<br />
O13 -<br />
O14 -<br />
Simulation Based Comparison of Safety-stock Calculation Methods<br />
Matthias Schmidt, Wiebke Hartmann, Peter Nyhuis (2)<br />
Modeling of machine tools using smart interlocking software blocks<br />
Aydin Nassehi, Stephen T. Newman (2)<br />
Design and assessment of quality control loops for stable business<br />
processes<br />
Robert Schmitt (2), Laszlo Monostori (1), Henrik Glöckner, Zsolt Janos<br />
Viharos<br />
Wednesday, 22 August 14:30 – 15:30<br />
Ballroom I, 1/F<br />
O15 -<br />
O16 -<br />
Combination of Planning Methods in a Comprehensive Production<br />
Planning Approach for Sequenced Production Lines<br />
Kurt Matyas, Stefan Auer / H.J. Warnecke (1)<br />
Scheduling with alternative routings in CNC workshops<br />
Youichi Nonaka (3), Gabor Erdos, Tamas Kis, Takahiro Nakano (3),<br />
Jozsef Vancza (1)<br />
Wednesday, 22 August 16:00 – 18:00<br />
Ballroom I, 1/F<br />
O17 -<br />
O18 -<br />
O19 -<br />
O20 -<br />
Integrated Quality, Production Logistics and Maintenance Analysis of<br />
Multi-Stage Asynchronous Manufacturing Systems with Degrading<br />
Machines<br />
Marcello Colledani, Tullio Tolio (1)<br />
Energy-aware scheduling for improving manufacturing process<br />
sustainability: a mathematical model for flexible flow shops<br />
Alessandro Arturo Giuseppe Bruzzone (1), Davide Anghinolfi, Massimo<br />
Paolucci, Flavio Tonelli<br />
Integrating sustainability within the factory planning process<br />
Danfang Chen, Steffen Heyer, Günther Seliger (1), Torsten Kjellberg (1)<br />
A Proposal on Optimized Scheduling Methodology and its Application<br />
to an Actual-Scale Semiconductor Manufacturing Problem<br />
Toshiya Kaihara (2), Shinji Kurose, Nobutada Fujii<br />
47<br />
Session on Production System and Organization (O)