You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />
MUNICIPIO SABANA <strong>DE</strong> TORRES<br />
CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />
2011<br />
Item 3,04<br />
Vigueta sobre muro (0,12*0,15)<br />
EQUIPO<br />
MATERIALES<br />
ml<br />
Und Rendim.<br />
Precio Unitario Valor<br />
0,000 $0,00 $0,00<br />
Subtotal $0,00<br />
Und Cantidad % Desp. Precio Unitario Valor<br />
Concreto 3000 psi M3 0,018 3 $354.000,00 $6.563,16<br />
Alambre negro Kg 0,310 3 $3.500,00 $1.117,55<br />
Puntilla 2" lb 0,100 2 $1.086,75 $110,85<br />
Maderas gl 0,030 0 $50.000,00 $1.500,00<br />
Hierro 37000 PSI Kg 4,500 5 $3.800,00 $17.955,00<br />
Subtotal $27.246,56<br />
MANO <strong>DE</strong> OBRA<br />
Cant. Und Rendim. % Prest. Precio Unitario Valor<br />
1 Cuadrilla 1-1-1 Un 10,000 80 $110.000,00 $19.800,00<br />
Subtotal $19.800,00<br />
Costo Directo: $47.046,56<br />
Ajuste al peso: $47.047