You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />
MUNICIPIO SABANA <strong>DE</strong> TORRES<br />
CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />
2011<br />
Item 4,03<br />
Tuberia pvc 1/2" R<strong>DE</strong> 9<br />
EQUIPO<br />
ml<br />
Und Rendim.<br />
Precio Unitario Valor<br />
Herramienta Un 50,000 $1.000,00 $20,00<br />
MATERIALES<br />
Subtotal $20,00<br />
Und Cantidad % Desp. Precio Unitario Valor<br />
Tuberia presion 1/2 PVC Ml 1,000 0 $3.419,00 $3.419,00<br />
Codo presion PVC 1/2" Un 0,400 0<br />
$204,82 $81,93<br />
Soldadura PVC 1/4 0,010 0 $50.307,00 $503,07<br />
MANO <strong>DE</strong> OBRA<br />
Subtotal $4.004,00<br />
Cant. Und Rendim. % Prest. Precio Unitario Valor<br />
1 Cuadrilla 1-1 Un 50,000 80 $60.000,00 $2.160,00<br />
Subtotal $2.160,00<br />
Costo Directo: $6.184,00<br />
Ajuste al peso: $6.184