You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />
MUNICIPIO SABANA <strong>DE</strong> TORRES<br />
CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />
2011<br />
Item 7,01<br />
Punto eléctrico<br />
EQUIPO<br />
un<br />
Und Rendim.<br />
Precio Unitario Valor<br />
Herramienta Un 2,000 $1.000,00 $500,00<br />
MATERIALES<br />
Subtotal $500,00<br />
Und Cantidad % Desp. Precio Unitario Valor<br />
Caja octagonal galv Un 1,000 0 $1.350,00 $1.350,00<br />
Alambre de cobre #14 Ml 4,000 0<br />
$780,00 $3.120,00<br />
Plafon de plastico(AVE) Un 1,000 0 $1.080,00 $1.080,00<br />
Alambre de cobre #12 Ml 8,000 0 $2.300,00 $18.400,00<br />
Tuberia conduit pvc 1/2" Ml 4,000 0 $3.100,00 $12.400,00<br />
Interrup sencillo luminex Un 1,000 0 $6.470,00 $6.470,00<br />
Accesorio gl 0,500 0 $3.500,00 $1.750,00<br />
curva conduit 1/2" x 90 und 1,000 0 $1.500,00 $1.500,00<br />
Caja rectangular galvan Un 2,000 0 $1.400,00 $2.800,00<br />
Subtotal $48.870,00<br />
MANO <strong>DE</strong> OBRA<br />
Cant. Und Rendim. % Prest. Precio Unitario Valor<br />
1 Cuadrilla 1-1 Un 35,000 80 $60.000,00 $3.085,71<br />
Subtotal $3.085,71<br />
Costo Directo: $52.455,71<br />
Ajuste al peso: $52.456