01.05.2013 Views

ANALISIS DE PRECIOS UNITARIOS

ANALISIS DE PRECIOS UNITARIOS

ANALISIS DE PRECIOS UNITARIOS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />

MUNICIPIO SABANA <strong>DE</strong> TORRES<br />

CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />

2011<br />

Item 7,01<br />

Punto eléctrico<br />

EQUIPO<br />

un<br />

Und Rendim.<br />

Precio Unitario Valor<br />

Herramienta Un 2,000 $1.000,00 $500,00<br />

MATERIALES<br />

Subtotal $500,00<br />

Und Cantidad % Desp. Precio Unitario Valor<br />

Caja octagonal galv Un 1,000 0 $1.350,00 $1.350,00<br />

Alambre de cobre #14 Ml 4,000 0<br />

$780,00 $3.120,00<br />

Plafon de plastico(AVE) Un 1,000 0 $1.080,00 $1.080,00<br />

Alambre de cobre #12 Ml 8,000 0 $2.300,00 $18.400,00<br />

Tuberia conduit pvc 1/2" Ml 4,000 0 $3.100,00 $12.400,00<br />

Interrup sencillo luminex Un 1,000 0 $6.470,00 $6.470,00<br />

Accesorio gl 0,500 0 $3.500,00 $1.750,00<br />

curva conduit 1/2" x 90 und 1,000 0 $1.500,00 $1.500,00<br />

Caja rectangular galvan Un 2,000 0 $1.400,00 $2.800,00<br />

Subtotal $48.870,00<br />

MANO <strong>DE</strong> OBRA<br />

Cant. Und Rendim. % Prest. Precio Unitario Valor<br />

1 Cuadrilla 1-1 Un 35,000 80 $60.000,00 $3.085,71<br />

Subtotal $3.085,71<br />

Costo Directo: $52.455,71<br />

Ajuste al peso: $52.456

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!