You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />
MUNICIPIO SABANA <strong>DE</strong> TORRES<br />
CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />
2011<br />
Item 4,07<br />
Cajas de inspeccion 50*50<br />
EQUIPO<br />
un<br />
Und Rendim.<br />
Precio Unitario Valor<br />
Herramienta Un 1,000 $1.000,00 $1.000,00<br />
MATERIALES<br />
Subtotal $1.000,00<br />
Und Cantidad % Desp. Precio Unitario Valor<br />
Concreto 3000 psi M3 0,400 0 $354.000,00 $141.600,00<br />
Hierro 37000 PSI Kg 11,000 0 $3.800,00 $41.800,00<br />
Mortero 1:3 M3 0,060 0 $385.000,00 $23.100,00<br />
Tolete Un 90,000 0<br />
$160,00 $14.400,00<br />
Subtotal $220.900,00<br />
MANO <strong>DE</strong> OBRA<br />
Cant. Und Rendim. % Prest. Precio Unitario Valor<br />
1 Cuadrilla 1-1-1 Un 5,000 80 $110.000,00 $39.600,00<br />
Subtotal $39.600,00<br />
Costo Directo: $261.500,00<br />
Ajuste al peso: $261.500