You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ANALISIS</strong> <strong>DE</strong> <strong>PRECIOS</strong> <strong>UNITARIOS</strong><br />
MUNICIPIO SABANA <strong>DE</strong> TORRES<br />
CONSTRUCCION AULAS TALLER AGROINDUSTRIAL COLEGIO ITES<br />
2011<br />
Item 3,12<br />
Viga de amarre aerea con acero 25*30<br />
EQUIPO<br />
ml<br />
Und Rendim.<br />
Precio Unitario Valor<br />
Formaleta madera gl 1,000 $9.000,00 $9.000,00<br />
Andamio Tubular dia 1,000 $400,00 $400,00<br />
Herramienta Un 10,000 $1.000,00 $100,00<br />
Vibrador Hr 25,000 $18.000,00 $720,00<br />
MATERIALES<br />
Subtotal $10.220,00<br />
Und Cantidad % Desp. Precio Unitario Valor<br />
Alambre negro Kg 0,100 0 $3.500,00 $350,00<br />
Concreto 3000 psi M3 0,075 5 $354.000,00 $27.877,50<br />
Puntilla 2" lb 0,100 0 $1.086,75 $108,68<br />
Hierro 60000 PSI Kg 7,000 5 $4.000,00 $29.400,00<br />
Subtotal $57.736,18<br />
MANO <strong>DE</strong> OBRA<br />
Cant. Und Rendim. % Prest. Precio Unitario Valor<br />
1 Cuadrilla 1-1-1 Un 12,000 80 $110.000,00 $16.500,00<br />
Subtotal $16.500,00<br />
Costo Directo: $84.456,18<br />
Ajuste al peso: $84.456