11.07.2015 Views

CIPREA 20 - Joannes

CIPREA 20 - Joannes

CIPREA 20 - Joannes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ciprea <strong>20</strong>Opening the casingTo open the boiler casing:1 Unscrew the four screws A2 Lower the inspection door3 Raise and remove the casing BBefore carrying out any operation inside the boiler, disconnect the electrical power supply and close the gascock upstream.BAAFig. 4Combustion analysisTo analyse the combustion, you must:1) Insert the probe in the flue;2) Open a hot water tap;3) Adjust the hot water temperature to maximum.4) Wait 10-15 minutes for the boiler to stabilize*5) Take the measurement.Analyses made with an unstabilized boiler can cause measurement errors.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!