CIPREA 20 - Joannes
CIPREA 20 - Joannes
CIPREA 20 - Joannes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Ciprea <strong>20</strong>Opening the casingTo open the boiler casing:1 Unscrew the four screws A2 Lower the inspection door3 Raise and remove the casing BBefore carrying out any operation inside the boiler, disconnect the electrical power supply and close the gascock upstream.BAAFig. 4Combustion analysisTo analyse the combustion, you must:1) Insert the probe in the flue;2) Open a hot water tap;3) Adjust the hot water temperature to maximum.4) Wait 10-15 minutes for the boiler to stabilize*5) Take the measurement.Analyses made with an unstabilized boiler can cause measurement errors.28