<strong>Compromisos</strong> <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />

Después <strong>de</strong> 15 años, queremos seguir contribuy<strong>en</strong>do a su<br />

<strong>de</strong>sarrollo <strong>en</strong>ergético y económico<br />

As Somozas. A Coruña, 14 <strong>de</strong> octubre <strong>de</strong> 2010


Índice<br />

<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong>: pionera y lí<strong>de</strong>r<br />

Nuevos compromisos <strong>en</strong> <strong>Galicia</strong><br />

<strong>Gamesa</strong>, respuesta global<br />

Realida<strong>de</strong>s <strong>de</strong> la <strong>en</strong>ergía eólica<br />

2


Índice<br />

<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong>: pionera y lí<strong>de</strong>r<br />

3


<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />

Empresa pionera y lí<strong>de</strong>r:<br />

- pres<strong>en</strong>cia <strong>en</strong> <strong>Galicia</strong> <strong>de</strong>s<strong>de</strong> hace 15 años<br />

- suministradora <strong>de</strong>l 45% <strong>de</strong> la pot<strong>en</strong>cia eólica total instalada (1.478 MW)<br />

<strong>Compromisos</strong> <strong>de</strong> inversión y creación <strong>de</strong> empleo superados<br />

Grupo industrial eólico con mayor implantación industrial<br />

Promotor eólico refer<strong>en</strong>te <strong>en</strong> el mercado: 700 MW<br />

Lí<strong>de</strong>r tecnológico<br />

Contribución al <strong>de</strong>sarrollo económico local<br />

4


Cumplimi<strong>en</strong>to <strong>de</strong> compromisos<br />

Cumplimi<strong>en</strong>to <strong>de</strong> los compromisos<br />

o <strong>Gamesa</strong> no sólo ha ejecutado íntegram<strong>en</strong>te su Plan Industrial, sino que ha invertido<br />

casi el triple y ha g<strong>en</strong>erado más <strong>de</strong>l doble <strong>de</strong> empleo que lo comprometido <strong>en</strong> el Plan<br />

Eólico Estratégico 2000 por el que la Xunta <strong>de</strong> <strong>Galicia</strong> concedió a la compañía el<br />

<strong>de</strong>sarrollo <strong>de</strong> 600 MW (ampliados a 760 MW <strong>en</strong> 2000):<br />

o 59,9 millones <strong>de</strong> euros fr<strong>en</strong>te a los 22,2 M euros comprometidos: x 2,7<br />

o G<strong>en</strong>eración <strong>de</strong> 541 empleos directos fr<strong>en</strong>te a los 240 comprometidos: x 2,3<br />

o Como promotor, <strong>Gamesa</strong> ha instalado <strong>en</strong> <strong>Galicia</strong> 663 MW y ti<strong>en</strong>e <strong>en</strong> tramitación<br />

administrativa 96 MW. La promoción <strong>de</strong> estos parques ha supuesto una inversión<br />

aproximada <strong>de</strong> 700 millones <strong>de</strong> euros <strong>de</strong> los que un 85% (600 millones <strong>de</strong> euros) han<br />

sido <strong>de</strong> inversión <strong>en</strong> <strong>Galicia</strong><br />

5


Cumplimi<strong>en</strong>to <strong>de</strong> compromisos<br />

<strong>Gamesa</strong> ha invertido casi el triple y ha g<strong>en</strong>erado casi dos<br />

veces más empleo <strong>de</strong>l comprometido<br />

INVERSIONES EN GALICIA<br />

Millones <strong>de</strong> euros<br />

x 2,7<br />

22,2<br />

59,8<br />

EMPLEO GENERADO EN GALICIA<br />

x 2,3<br />

Comprometido Realizado<br />

Comprometido Realizado<br />

240<br />

541<br />

6


Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Contribución al <strong>de</strong>sarrollo local<br />

o Compras a proveedores gallegos: 743 millones <strong>de</strong> euros (2006-2009)<br />

� 180 millones <strong>de</strong> euros anuales (200 millones anuales si se le suman inversiones y salarios)<br />

o G<strong>en</strong>erador <strong>de</strong> empleo: 550 empleos directos y + 1.150 trabajadores (directo e indirecto)<br />

o Dinamizador Puerto <strong>de</strong> Ferrol: <strong>de</strong>s<strong>de</strong> 2005, el tráfico <strong>de</strong> mercancía eólica <strong>de</strong>l puerto se ha<br />

increm<strong>en</strong>tado <strong>en</strong> más <strong>de</strong> dos dígitos cada año:<br />

� Durante los últimos cuatro años, el tráfico <strong>de</strong> compon<strong>en</strong>tes eólicos g<strong>en</strong>erado por <strong>Gamesa</strong> <strong>en</strong> el<br />

Puerto <strong>de</strong> Ferrol ha asc<strong>en</strong>dido a más <strong>de</strong> 215.000 tn, que repres<strong>en</strong>tan la mitad <strong>de</strong>l tráfico total<br />

<strong>de</strong> material eólico <strong>de</strong>l puerto<br />

� En 2008, <strong>Gamesa</strong> <strong>en</strong>vió a través <strong>de</strong>l puerto más <strong>de</strong> 1.700 piezas a USA, Francia, Polonia e<br />

Italia. En 2009, y pese a las dificulta<strong>de</strong>s <strong>de</strong>l sector, la compañía ha embarcado 1.100 piezas<br />

con <strong>de</strong>stino Francia, Bélgica, Italia y Polonia<br />

� El volum<strong>en</strong> <strong>de</strong> negocio g<strong>en</strong>erado por <strong>Gamesa</strong> a empresas que ti<strong>en</strong><strong>en</strong> como núcleo <strong>de</strong> trabajo<br />

el Puerto <strong>de</strong> Ferrol asc<strong>en</strong>dió a cerca <strong>de</strong> 2 millones <strong>de</strong> euros <strong>en</strong> 2009<br />

7


Compromiso <strong>de</strong> <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Implantación industrial - actor más relevante <strong>de</strong>l sector<br />

o Grupo industrial eólico con mayor implantación industrial:<br />

� Planta <strong>de</strong> fabricación <strong>de</strong> palas y vigas <strong>de</strong> As Somozas<br />

� Planta <strong>de</strong> <strong>en</strong>samblaje <strong>de</strong> nacelles <strong>de</strong> Sigüeiro<br />

� Planta <strong>de</strong> multiplicadoras TEGSA <strong>de</strong> Bergondo<br />

� C<strong>en</strong>tro Regional Operativo <strong>en</strong> Santiago <strong>de</strong> Compostela<br />

� C<strong>en</strong>tro Logístico (CTL) <strong>de</strong> As Pontes<br />

� Delegación <strong>de</strong> <strong>Gamesa</strong> Energía <strong>en</strong> Santiago <strong>de</strong> Compostela<br />

Inversión <strong>de</strong> 60 millones <strong>de</strong> euros <strong>en</strong> sus instalaciones industriales<br />

<strong>Gamesa</strong> ha anunciado la creación <strong>de</strong> su C<strong>en</strong>tro Europeo <strong>de</strong> Reparación <strong>de</strong> Gran<strong>de</strong>s Compon<strong>en</strong>tes. La <strong>de</strong>cisión, que requerirá el traslado <strong>de</strong>l<br />

c<strong>en</strong>tro <strong>de</strong> Bergondo a Sigüeiro, se toma con el propósito <strong>de</strong> garantizar la empleabilidad <strong>de</strong> los trabajadores <strong>de</strong> ambas plantas<br />

8


Compromiso <strong>de</strong> <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Implantación industrial - actor más relevante <strong>de</strong>l sector<br />

<strong>Gamesa</strong>, actor tecnológico más relevante <strong>de</strong>l sector industrial eólico <strong>de</strong> <strong>Galicia</strong>, con inversiones <strong>de</strong> 60<br />

millones <strong>de</strong> euros, que han contribuido a fortalecer su tejido industrial<br />

Planta <strong>de</strong> Ensamblaje <strong>de</strong> Nacelles<br />

• Sigüeiro (A Coruña)<br />

• Nº Empleados: 55 trabajadores<br />

• Inicio <strong>de</strong> Actividad <strong>en</strong> 2005<br />

C<strong>en</strong>tro Regional Operativo<br />

• Santiago <strong>de</strong> Compostela (A<br />

Coruña)<br />

• Nº Empleados: 36 + 104<br />

subcontratados<br />

Delegación Promoción Parques<br />

• Santiago <strong>de</strong> Compostela (A<br />

Coruña)<br />

• Nº Empleados: 14 trabajadores<br />

Planta <strong>de</strong> Multiplicadoras TEGSA<br />

• Bergondo (A Coruña)<br />

• Nº Empleados: 41 trabajadores<br />

• Inicio <strong>de</strong> Actividad <strong>en</strong> 1997<br />

*Planta <strong>de</strong> Fabricación <strong>de</strong> Palas<br />

• Somozas (A Coruña)<br />

• Nº Empleados: 268 empleados<br />

• Inicio <strong>de</strong> Actividad <strong>en</strong> 1998<br />

C<strong>en</strong>tro Logístico<br />

• As Pontes (A Coruña).<br />

• Nº empleados: 23 trabajadores<br />

• Inicio actividad: 2009<br />

(*) Planta <strong>de</strong> Fabricación <strong>de</strong> Palas incluye fabricación <strong>de</strong> vigas<br />

(Edificio I <strong>en</strong> la misma planta <strong>de</strong> Somozas)<br />

9


Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />

10


Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />

11


Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />

Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />

12


Promotor eólico <strong>de</strong> refer<strong>en</strong>cia<br />

759,69 MW propios instalados o <strong>en</strong> fase <strong>de</strong> <strong>de</strong>sarrollo<br />

PARQUES EN OPERACIÓN MW<br />

Coriscada 24,00<br />

Muras I 24,42<br />

Monteseixo 24,42<br />

Serra do Cando 24,42<br />

Muras II 24,42<br />

Forgoselo 24,42<br />

Outeiro <strong>de</strong> Coto 15,37<br />

Montetreito 30,39<br />

Masgalán 49,50<br />

Serra da Panda 18,48<br />

Ameixeiras 49,50<br />

P<strong>en</strong>a da Cruz 12,75<br />

Viveiro 36,55<br />

Pedregal – Tremuzo I 30,60<br />

Monte do Carrio 31,45<br />

P<strong>en</strong>a da Cruz II 10,20<br />

Pedregal – Tremuzo II 14,00<br />

Serra <strong>de</strong> Meira 49,30<br />

Goiapeñote 40,00<br />

Serra da Loba 36,00<br />

P<strong>en</strong>a Revolta 14,00<br />

M. Arca (fase I) 6,00<br />

Farrapa I (fase I) 20,00<br />

Pousadoiro (fase I) 23,50<br />

TOTAL 633,69<br />

Alto do Seixal (Farrapa I, fase II) – P<strong>en</strong>di<strong>en</strong>te inscripción 30,00<br />

registro<br />

PARQUES EN TRAMITACIÓN MW<br />

Alto da Croa 8,00<br />

Fonseca (Pou Sadoiro fase II) 26,00<br />

Farrapa II 20,00<br />

TOTAL 54,00<br />

POTENCIA ADMITIDA A TRÁMITE EN 2010 MW<br />

Monte Arca (fase I, ampl.) 4,00<br />

Cabanelas 18,00<br />

Monte Tourado 6,00<br />

Alto da Croa II 14,00<br />

TOTAL 42,00<br />

13


Lí<strong>de</strong>r tecnológico<br />

Plataformas <strong>Gamesa</strong><br />

G5X-850 KW<br />

Máximo r<strong>en</strong>dimi<strong>en</strong>to <strong>en</strong><br />

emplazami<strong>en</strong>tos con vi<strong>en</strong>tos<br />

bajos (G58), medios y altos<br />

(G52),<strong>en</strong> todo tipo <strong>de</strong> terr<strong>en</strong>os<br />

G9X-2,0 MW<br />

La plataforma más versátil <strong>de</strong>l<br />

mercado con la máxima producción<br />

para cualquier tipo <strong>de</strong><br />

emplazami<strong>en</strong>to<br />

G10X-4,5 MW<br />

M<strong>en</strong>or coste <strong>de</strong> <strong>en</strong>ergía con la<br />

facilidad <strong>de</strong> transporte e<br />

instalación <strong>de</strong> un aerog<strong>en</strong>erador<br />

<strong>de</strong> 2,0 MW<br />

14


Lí<strong>de</strong>r tecnológico<br />

Listos <strong>en</strong> offshore <strong>en</strong> 2014<br />

o Trabajando <strong>en</strong> dos familias <strong>de</strong> plataformas offshore (G11X), aprovechando conocimi<strong>en</strong>tos propios<br />

<strong>en</strong> tecnología multi-MW<br />

� Plataforma <strong>de</strong> 5MW: prototipos <strong>en</strong> el 2012 y pre-series <strong>en</strong> el 2013<br />

� Pre-series <strong>de</strong> la plataforma <strong>de</strong> 6MW-7MW <strong>en</strong> el 2015<br />

o Acuerdo con la americana Northrop Grumman <strong>en</strong> tecnología eólica marina<br />

� Puesta <strong>en</strong> marcha <strong>de</strong>l primer prototipo marino <strong>de</strong> la plataforma G11X-5,0 MW <strong>en</strong> EEUU<br />

� Instalación <strong>de</strong> dos prototipos G11X-5,0 MW <strong>en</strong> el último trimestre <strong>de</strong> 2012<br />

� Ambas compañías planean trabajar <strong>de</strong> forma conjunta <strong>en</strong> el <strong>de</strong>sarrollo <strong>de</strong> nuevas<br />

g<strong>en</strong>eraciones <strong>de</strong> plataformas marinas<br />

Listos para los <strong>de</strong>sarrollos previstos <strong>en</strong> Norte <strong>de</strong> Europa<br />

15


Índice<br />

Nuevos compromisos <strong>en</strong> <strong>Galicia</strong><br />

16


El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />

Contribuir a que <strong>Galicia</strong> recupera su li<strong>de</strong>razgo <strong>en</strong> pot<strong>en</strong>cia eólica<br />

instalada <strong>en</strong> España<br />

Ayudando a g<strong>en</strong>erar riqueza y empleo <strong>en</strong> la Comunidad<br />

Impulsando el <strong>de</strong>sarrollo empresarial local<br />

Incorporando innovación tecnológica<br />

Con el compromiso <strong>de</strong> seguir contribuy<strong>en</strong>do al <strong>de</strong>sarrollo sost<strong>en</strong>ible<br />

17


El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />

Propuesta <strong>de</strong> <strong>Gamesa</strong> - nuevo concurso eólico<br />

o <strong>Gamesa</strong> ha pres<strong>en</strong>tado la solicitud <strong>de</strong> asignación <strong>de</strong> pot<strong>en</strong>cia eólica, al amparo <strong>de</strong> la Or<strong>de</strong>n <strong>de</strong> 29 <strong>de</strong><br />

marzo <strong>de</strong> 2010, <strong>de</strong> 460,5 MW <strong>en</strong> 12 proyectos<br />

o <strong>Gamesa</strong> se pres<strong>en</strong>ta al concurso eólico <strong>de</strong> <strong>Galicia</strong> a través <strong>de</strong> tres socieda<strong>de</strong>s que forman parte <strong>de</strong><br />

su grupo empresarial: <strong>Gamesa</strong> Energía <strong>Galicia</strong>, V<strong>en</strong>to Ártabro y Eólica da Ca<strong>de</strong>ira. En las dos últimas<br />

socieda<strong>de</strong>s, ya constituidas <strong>de</strong>s<strong>de</strong> hace años, participan socios gallegos, como son Galiv<strong>en</strong>to Enerxía<br />

y Energías R<strong>en</strong>ovables Costa Coruña, respectivam<strong>en</strong>te<br />

o Las zonas <strong>en</strong> las que se pres<strong>en</strong>ta <strong>Gamesa</strong>, a través <strong>de</strong> sus participadas con sus 12 proyectos, son<br />

las zonas 2, 6, 7, 8 y 10<br />

o Junto a su verti<strong>en</strong>te como promotor eólico, <strong>Gamesa</strong> compite <strong>en</strong> este concurso también como<br />

fabricante e instalador <strong>de</strong> aerog<strong>en</strong>eradores y para ello ha pres<strong>en</strong>tado un plan industrial vinculado a<br />

la obt<strong>en</strong>ción <strong>de</strong> una <strong>de</strong>terminada pot<strong>en</strong>cia (1.200 MW) <strong>en</strong> la resolución <strong>de</strong> dicho concurso<br />

18


El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />

Inversión industrial y creación <strong>de</strong> empleo nuevo<br />

NUEVA PROPUESTA INDUSTRIAL GAMESA<br />

INVERSIÓN NUEVO<br />

MM euros EMPLEO<br />

Nuevo c<strong>en</strong>tro producción palas G97 - As Somozas 20,0 37<br />

Nuevo c<strong>en</strong>tro producción palas G10X - As Somozas 20,0 25<br />

Nuevo núcleo mant<strong>en</strong>imi<strong>en</strong>to – Oroso 6,8 120<br />

Consolidación plataforma logística – As Pontes 3,2 -<br />

Implantación fabricación dovelas para G10X - Coirós 1,5 44<br />

51,1 226<br />

Nuevo empleo g<strong>en</strong>erado directo + indirecto nuevo plan industrial: 479 personas, más los posibles puestos g<strong>en</strong>erados durante la construcción<br />

y puesta <strong>en</strong> marcha <strong>de</strong> los parques eólicos<br />

Empleo g<strong>en</strong>erado por <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong> una vez ejecutado nuevo plan industrial: 767 directos y 1.600 (directos e indirectos)<br />

19


Producción <strong>de</strong> palas G97-2MW<br />

o Más producción <strong>en</strong>ergética que el actual lí<strong>de</strong>r <strong>de</strong>l mercado <strong>en</strong> los<br />

aerog<strong>en</strong>eradores 2 MW Clase III: c. 14% más producción<br />

<strong>en</strong>ergética que el actual G90-2 MW Clase III<br />

o Tecnología punta <strong>de</strong> fabricación <strong>de</strong> palas: nuevo diseño<br />

aerodinámico, mejora el área <strong>de</strong> barrido (+16%), m<strong>en</strong>or ruido<br />

o Rotor <strong>de</strong> 97 m <strong>de</strong> diámetro para Clase III (vi<strong>en</strong>to bajo) don<strong>de</strong> se<br />

prevé más <strong>de</strong>l 50% <strong>de</strong> la <strong>de</strong>manda <strong>en</strong> la categoría <strong>de</strong> 2MW<br />

o Otras tecnologías: tecnología <strong>de</strong> paso y velocidad variable para<br />

maximizar la <strong>en</strong>ergía producida; sistema yaw activo, para<br />

asegurar una óptima adaptación a terr<strong>en</strong>os complejos; <strong>Gamesa</strong><br />

Windnet® (sistema <strong>de</strong> control y monitorización remota con<br />

acceso web); <strong>Gamesa</strong> SMP (sistema propio <strong>de</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />

prev<strong>en</strong>tivo; conexión a red internacional, etc.<br />

o Mejoras <strong>en</strong> las prestaciones (curva <strong>de</strong> pot<strong>en</strong>cia y niveles <strong>de</strong><br />

ruido) e imag<strong>en</strong> r<strong>en</strong>ovada (diseño <strong>de</strong> nacelle y refrigeración <strong>de</strong>l<br />

interior <strong>de</strong> la nacelle)<br />

20


<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />

Technological highlights<br />

BLADES<br />

CHARACTERISTICS<br />

o Bla<strong>de</strong>s: 39m for G80-2.0 MW, 42,5m for G87-2.0<br />

MW, 44m for G90-2.0 MW and 47,5m for G97-2.0<br />

MW<br />

o State-of-the-art manufacturing process:<br />

manufactured from organic matrix composite<br />

material, with carbon or glassfiber reinforcem<strong>en</strong>t<br />

o Lightining protection system<br />

o The structure of each bla<strong>de</strong> consists of two shells<br />

glued to a spar or internal beams<br />

o Innovative airfoil for new G97 that minimizes<br />

noise<br />

o Lighter bla<strong>de</strong>s maintaining stiffness which<br />

reduces loads transmitted to the <strong>en</strong>tire<br />

system<br />

o High <strong>en</strong>ergy production and minimum noise<br />

level thanks to optimized airfoils<br />

o The bla<strong>de</strong> is <strong>de</strong>signed to fulfill two basic<br />

functions: structure and aerodynamics<br />

o Easier maint<strong>en</strong>ance<br />

ADVANTAGES<br />

21


G97-2.0 MW IIIA<br />

Innovative bla<strong>de</strong><br />

Ext<strong>en</strong>sive validation including wind tunnel tests<br />

Highest effici<strong>en</strong>cy low noise airfoils<br />

22


<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />

Technological highlights<br />

DRIVE TRAIN<br />

CHARACTERISTICS<br />

o Main shaft supported on two bearings<br />

o 3-stage gearbox with 2 parallel shafts and one<br />

planetary stage.<br />

o High-speed shaft connected to the g<strong>en</strong>erator by<br />

means of a flexible coupling with a torque<br />

limiter system<br />

o Torque arms are used to attach the gear box to<br />

the frame by means of shock absorbers<br />

o The gearbox has a lubrication system which<br />

permits attaining a <strong>de</strong>gree of oil purity of up to<br />

3µm, which reduces the pot<strong>en</strong>tial number of<br />

malfunctions.<br />

ADVANTAGES<br />

o Main shaft <strong>de</strong>sign prev<strong>en</strong>ts any load except<br />

the torque from being transmitted to the<br />

gear box, which minimizes the occurr<strong>en</strong>ce<br />

of any problems with this compon<strong>en</strong>t.<br />

o Gear box is allowed to be disassembled<br />

without the need to take apart the main<br />

shaft.<br />

o Flexible coupling prev<strong>en</strong>ts overloading the<br />

transmission chain.<br />

o Thanks to the modular <strong>de</strong>sign of the power<br />

train, the weight of the gear box is borne by<br />

the main shaft, while the shock absorbers<br />

joined to the frame react to any torque,<br />

prev<strong>en</strong>ting the gear box from rotating and<br />

any un<strong>de</strong>sired charges on the gear box.<br />

23


<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />

Technological highlights<br />

ACTIVE YAW<br />

CHARACTERISTICS ADVANTAGES<br />

o 4 electrical motors operated by WT controller<br />

based on information received from the<br />

anemometers mounted on top of the nacelle<br />

o The yaw is active with hydraulic brake clamp that<br />

can be regulated gradually<br />

o The system is composed of 5 clamps avoid<br />

fatigues and failures in the Yaw system<br />

o The <strong>Gamesa</strong> Active Yaw system is submitted to<br />

accelerated lifetime test cycles and aging tests on<br />

the <strong>Gamesa</strong> UPB testing b<strong>en</strong>ch<br />

o Combined activation of friction bearing and<br />

ret<strong>en</strong>tion clamps prev<strong>en</strong>ts fatigue and<br />

possible damage to the ring<br />

o The ring is divi<strong>de</strong>d into 6 sectors, in or<strong>de</strong>r to<br />

make it easier to repair any possible tooth<br />

damage<br />

o HALT tests <strong>en</strong>sure and improve the<br />

reliability of this compon<strong>en</strong>t, validating its<br />

correct <strong>de</strong>sign and providing feedback on<br />

the virtual mo<strong>de</strong>ls in or<strong>de</strong>r to re<strong>de</strong>sign<br />

them, incorporating future improvem<strong>en</strong>ts<br />

24


<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />

Technological highlights<br />

PITCH SYSTEM<br />

CHARACTERISTICS ADVANTAGES<br />

o In<strong>de</strong>p<strong>en</strong><strong>de</strong>nt hydraulic actuators for each bla<strong>de</strong><br />

that provi<strong>de</strong> a rotational capacity betwe<strong>en</strong> -5º and<br />

90º<br />

o The pitch system is activated during the <strong>en</strong>tire<br />

time the wind turbine operates<br />

o Wh<strong>en</strong> the wind speed is below the rated speed, the<br />

pitch angle will be selected in or<strong>de</strong>r to maximize the<br />

electrical power obtained for each wind speed.<br />

o Wh<strong>en</strong> the wind speed is above the rate speed, the<br />

pitch angle will be the one that provi<strong>de</strong>s the<br />

machine's rated power.<br />

o Having an in<strong>de</strong>p<strong>en</strong><strong>de</strong>nt pitch on each bla<strong>de</strong><br />

provi<strong>de</strong>s redundancy for the aerodynamic<br />

brake system<br />

o The hydraulic system has an accumulator<br />

system that allows the bla<strong>de</strong>s to be turned<br />

to their feathered position, in case of an<br />

emerg<strong>en</strong>cy<br />

o The hydraulic system provi<strong>de</strong>s greater<br />

activation speed than other types of<br />

systems. Due to the hydraulic accumulator<br />

system, no batteries are required for<br />

operation, which increases reliability during<br />

emerg<strong>en</strong>cy situations<br />

25


<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />

Technological highlights<br />

ELECTRICAL SYSTEMS<br />

CHARACTERISTICS ADVANTAGES<br />

o The g<strong>en</strong>erator is a double-fed, 4-pole variety<br />

with a wound rotor and slip rings. It is highly<br />

effici<strong>en</strong>t and cooled by and air-air system<br />

o The transformer is a three-phase, dry<br />

<strong>en</strong>capsulated mo<strong>de</strong>l, with differ<strong>en</strong>t output<br />

voltage options and differ<strong>en</strong>t appar<strong>en</strong>t power<br />

ranges. It has be<strong>en</strong> specially <strong>de</strong>signed for wind<br />

<strong>en</strong>ergy applications<br />

o The control system allows the system to work<br />

at variable speeds, using the rotor int<strong>en</strong>sity<br />

frequ<strong>en</strong>cy control<br />

o Optimal operation for any wind speed,<br />

maximizing the production and minimizing<br />

loads and noise, thanks to the variable<br />

speed operation<br />

o Active and reactive power control<br />

o Synchronous behavior with regards to the<br />

grid<br />

o The g<strong>en</strong>erator is protected from shortcircuits<br />

and overloads. The temperature is<br />

also continuously monitored by s<strong>en</strong>sors<br />

o The transformer's location in the nacelle<br />

prev<strong>en</strong>ts electrical loss due to the reduced<br />

l<strong>en</strong>gth of the low voltage cables, and it also<br />

reduces the visual impact<br />

26


G10X- 4,5 MW<br />

El futuro <strong>de</strong> la <strong>en</strong>ergía eólica<br />

o Aerog<strong>en</strong>erador más pot<strong>en</strong>te <strong>en</strong> el mercado eólico onshore<br />

o Con 4,5 MW <strong>de</strong> pot<strong>en</strong>cia unitaria, pres<strong>en</strong>ta un m<strong>en</strong>or coste <strong>de</strong><br />

<strong>en</strong>ergía y la facilidad <strong>de</strong> transporte e instalación <strong>de</strong> un<br />

aerog<strong>en</strong>erador <strong>de</strong> 2,0 MW<br />

o Con un rotor <strong>de</strong> 128 m <strong>de</strong> diámetro y torre híbrida fabricada <strong>en</strong><br />

hormigón y acero <strong>de</strong> 120 m<br />

o Se diseño y <strong>de</strong>sarrollo incluye innovaciones tecnológicas<br />

novedosas hasta ahora <strong>en</strong> el mercado, basadas <strong>en</strong> conceptos <strong>de</strong><br />

diseño y validación equiparables a los <strong>de</strong> la industria<br />

aeronáutica, como Innobla<strong>de</strong>®, Multismart®, ConcreTower®,<br />

CompactTrain®, Flexibit® y GridMate®, <strong>en</strong>tre otras<br />

o La producción anual <strong>de</strong> un único aerog<strong>en</strong>erador pue<strong>de</strong><br />

proporcionar electricidad a 3.169 hogares <strong>en</strong> un año, sustituir<br />

cerca <strong>de</strong> 1.000 tn equival<strong>en</strong>tes <strong>de</strong> petróleo (tep/año) y evitar la<br />

emisión a la atmósfera <strong>de</strong> 6.750 tn <strong>de</strong> CO 2 /año<br />

27


<strong>Gamesa</strong> G10X-4,5 MW<br />

28


Índice<br />

<strong>Gamesa</strong>, respuesta global<br />

30


<strong>Gamesa</strong> global<br />

Base industrial y comercial <strong>en</strong> principales mercados<br />

MW instalados acumulados a 2009: más <strong>de</strong> 18.000<br />

América<br />

2.382 MW<br />

Europa<br />

13.236 MW<br />

N. África<br />

659 MW<br />

Asia<br />

1.969 MW<br />

V<strong>en</strong>tas MWe 2009<br />

España<br />

27%<br />

RoW<br />

11%<br />

China<br />

15%<br />

EEUU<br />

15%<br />

Resto<br />

Europa<br />

32%<br />

31


<strong>Gamesa</strong> global<br />

o Actividad crucial <strong>en</strong> la lucha contra el cambio climático<br />

o Más <strong>de</strong> 18.000 MW instalados <strong>de</strong>s<strong>de</strong> 1998, lo que supone 27 millones <strong>de</strong> toneladas<br />

CO 2/año evitadas<br />

MW ACUMULADOS INSTALADOS<br />

9.945<br />

12.864<br />

16.087<br />

18.246<br />

2006 2007 2008 2009<br />

AHORRO EMISIONES GASES EFECTO<br />

INVERNADERO<br />

Toneladas <strong>de</strong> CO 2 evitadas por MW instalado<br />

14.700.000<br />

19.200.000<br />

24.000.000<br />

27.000.000<br />

2006 2007 2008 2009<br />

32


<strong>Gamesa</strong> global 09<br />

Base industrial y comercial <strong>en</strong> principales mercados<br />

EE.UU.<br />

C<strong>en</strong>tros <strong>de</strong> producción<br />

2 <strong>en</strong> P<strong>en</strong>silvania<br />

Compon<strong>en</strong>tes<br />

Palas<br />

Ensamblaje nacelles<br />

Capacidad productiva<br />

> 1.200 MW<br />

Europa<br />

C<strong>en</strong>tros <strong>de</strong> producción<br />

23 <strong>en</strong> España<br />

Compon<strong>en</strong>tes<br />

Diseño y fabricación<br />

integral<br />

Capacidad productiva<br />

> 2.000 MW<br />

Asia<br />

C<strong>en</strong>tros <strong>de</strong> producción<br />

4 <strong>en</strong> China (+2 <strong>en</strong><br />

construcción)<br />

1 <strong>en</strong> India<br />

Compon<strong>en</strong>tes<br />

Palas, <strong>en</strong>samblaje<br />

nacelles,<br />

multiplicadoras,<br />

g<strong>en</strong>eradores<br />

Capacidad productiva<br />

1.200 MW<br />

Estrategia <strong>de</strong> crecimi<strong>en</strong>to reforzada con la ampliación <strong>de</strong> la capacidad productiva <strong>en</strong><br />

China, India y EE.UU.<br />

33


La tecnología: un valor corporativo<br />

o I+D+i está integrada <strong>en</strong> toda la ca<strong>de</strong>na <strong>de</strong> diseño y producción <strong>de</strong> cada una <strong>de</strong> las plantas. El<br />

apoyo <strong>de</strong>l Banco Europeo <strong>de</strong> Inversiones (BEI), a través <strong>de</strong> un préstamo <strong>de</strong> 200 millones <strong>de</strong> euros,<br />

avalan el Plan <strong>de</strong> Investigación, Desarrollo e Innovación <strong>en</strong>tre 2008 y 2011.<br />

o <strong>Gamesa</strong> cu<strong>en</strong>ta con cinco c<strong>en</strong>tros <strong>de</strong> I+D repartidos <strong>en</strong>tre España, Dinamarca, USA y China.<br />

o El <strong>de</strong>partam<strong>en</strong>to <strong>de</strong> I+D <strong>de</strong> <strong>Gamesa</strong> está formado por 600 personas.<br />

o Trabaja <strong>de</strong> manera coordinada y alineada tecnológicam<strong>en</strong>te con el conjunto <strong>de</strong>l sector eólico,<br />

participando <strong>en</strong> los sigui<strong>en</strong>tes proyectos <strong>de</strong> I+D que cu<strong>en</strong>tan con financiación institucional.<br />

o Windli<strong>de</strong>r 2015: li<strong>de</strong>ra un consorcio que cu<strong>en</strong>ta con financiación española <strong>de</strong>l programa CENIT. El proyecto ti<strong>en</strong>e<br />

como objeto dominar el diseño <strong>de</strong> gran<strong>de</strong>s aerog<strong>en</strong>eradores (multimegavatio).<br />

o Upwind: participa <strong>en</strong> este proyecto europeo que investiga la g<strong>en</strong>eración eólica <strong>de</strong>l futuro y el diseño <strong>de</strong> muy gran<strong>de</strong>s<br />

aerog<strong>en</strong>eradores (8-10MW) tanto <strong>en</strong> emplazami<strong>en</strong>tos terrestres como marinos.<br />

o Reliawind: li<strong>de</strong>ra este proyecto europeo con objetivo <strong>de</strong> profundizar <strong>en</strong> los conceptos <strong>de</strong> fiabilidad <strong>en</strong> el diseño,<br />

operación y mant<strong>en</strong>imi<strong>en</strong>to <strong>de</strong> los aerog<strong>en</strong>eradores.<br />

34


<strong>Gamesa</strong> global<br />

Socio <strong>de</strong> confianza, suministrador <strong>de</strong> los principales<br />

actores <strong>de</strong> la industria eólica<br />

NREA<br />

New & R<strong>en</strong>ewable Energy<br />

Authority<br />

Consolidación <strong>en</strong> mercados<br />

estratégicos (Europa, EE.UU. y<br />

China)<br />

Entrada <strong>en</strong> nuevos mercados<br />

(Europa <strong>de</strong>l Este y Norte <strong>de</strong><br />

África)<br />

35


<strong>Gamesa</strong> global<br />

Fr<strong>en</strong>te a un nuevo mercado y para maximizar<br />

el crecimi<strong>en</strong>to<br />

Nuevo <strong>en</strong>foque comercial para maximizar el crecimi<strong>en</strong>to <strong>de</strong> v<strong>en</strong>tas<br />

� Apertura <strong>de</strong> nuevos mercados<br />

� Nuevos segm<strong>en</strong>tos <strong>de</strong> cli<strong>en</strong>tes<br />

� Impulso, servicios <strong>de</strong> operación y mant<strong>en</strong>imi<strong>en</strong>to<br />

Aum<strong>en</strong>to <strong>de</strong> la competitividad <strong>de</strong> nuestra cartera <strong>de</strong> productos<br />

� 2 nuevos productos para vi<strong>en</strong>tos <strong>de</strong> nivel bajo y medio<br />

� 1 nueva plataforma <strong>de</strong> productos: G10X – 4,5 MW<br />

� 1 nuevo segm<strong>en</strong>to <strong>de</strong> negocio: <strong>en</strong>ergía eólica marina (Offshore)<br />

Avances continuos <strong>en</strong> la optimización <strong>de</strong> costes para conseguir una t<strong>en</strong><strong>de</strong>ncia<br />

creci<strong>en</strong>te <strong>en</strong> márg<strong>en</strong>es más allá <strong>de</strong> 2010<br />

Ajuste <strong>de</strong> la capacidad flexible <strong>de</strong> producción a la <strong>de</strong>manda <strong>de</strong>l mercado<br />

36


<strong>Gamesa</strong> global<br />

Nuevo <strong>en</strong>foque comercial<br />

COLABORACIONES EN<br />

PRODUCTOS<br />

Alianzas con cli<strong>en</strong>tes clave para<br />

el <strong>de</strong>sarrollo <strong>de</strong> nuevos<br />

productos basados <strong>en</strong> las<br />

necesida<strong>de</strong>s <strong>de</strong>l cli<strong>en</strong>te<br />

PRESENCIA LOCAL<br />

Ampliación significativa <strong>de</strong> la<br />

red <strong>de</strong> oficinas <strong>de</strong> v<strong>en</strong>ta <strong>en</strong><br />

Europa y <strong>en</strong> el resto <strong>de</strong>l<br />

mundo<br />

BASADO EN EL VALOR<br />

Enfoque basado <strong>en</strong> la<br />

compr<strong>en</strong>sión y la maximización<br />

<strong>de</strong>l valor para los cli<strong>en</strong>tes<br />

NUEVO<br />

ENFOQUE<br />

COMERCIAL<br />

ENFOQUE FLEXIBLE<br />

La adaptación <strong>de</strong> los procesos<br />

internos reduce el tiempo <strong>de</strong><br />

respuesta y aum<strong>en</strong>ta la<br />

flexibilidad<br />

SOPORTE GLOBAL<br />

Gestión global <strong>de</strong> cli<strong>en</strong>tes<br />

clave con soporte operativo<br />

local<br />

SOLUCIONES A MEDIDA<br />

La gama más amplia <strong>de</strong><br />

productos y servicios para<br />

ofrecer soluciones específicas<br />

para cada parque eólico<br />

37


Apertura <strong>de</strong> nuevos mercados<br />

Pres<strong>en</strong>cia y respuestas globales<br />

Objetivo: x 2 red <strong>de</strong> v<strong>en</strong>tas, x 3 MW ofrecidos y x 4 número <strong>de</strong> ofertas<br />

Mercados con base instalada<br />

Mercados con proyectos <strong>en</strong> construcción<br />

Mercados con nuevas ofertas<br />

38


Vanguardia tecnológica<br />

Lanzami<strong>en</strong>to <strong>de</strong> nuevos productos<br />

Nuevo Diámetro Pot<strong>en</strong>cia IEC Clase<br />

producto rotor nominal<br />

G58 58 0,85 MW IIA<br />

G90 90 2,0 MW IIA<br />

G97 97 2,0 MW IIIA<br />

G128 128 4,5 MW IIA<br />

G136 136 + 4,0 MW IIIA<br />

Lanzami<strong>en</strong>to <strong>de</strong> dos nuevos<br />

productos para vi<strong>en</strong>tos <strong>de</strong><br />

velocida<strong>de</strong>s medias y bajas <strong>en</strong> el<br />

próximo ciclo <strong>de</strong> actividad<br />

Una nueva plataforma completa<br />

<strong>de</strong> productos: G10X-4,5 MW<br />

Un nuevo segm<strong>en</strong>to: <strong>en</strong>ergía<br />

eólica marina<br />

39


�3,6 GW <strong>de</strong><br />

<strong>de</strong>sarrollo y<br />

construcció<br />

n propios<br />

� Lic<strong>en</strong>cias<br />

Lí<strong>de</strong>r <strong>en</strong> el <strong>de</strong>sarrollo y v<strong>en</strong>ta <strong>de</strong><br />

parques eólicos<br />

� Evaluación<br />

<strong>de</strong> emplazami<strong>en</strong>tos<br />

� Financiación<br />

<strong>de</strong> proyectos<br />

<strong>Gamesa</strong> es un socio con alta<br />

experi<strong>en</strong>cia <strong>en</strong> toda la ca<strong>de</strong>na <strong>de</strong><br />

valor <strong>de</strong> parques eólicos<br />

Desarrollo<br />

<strong>de</strong> proyectos<br />

Diseño <strong>de</strong><br />

aerog.<br />

�Mejora <strong>de</strong>l<br />

diseño G8x<br />

�Diseño<br />

completo<br />

G10X<br />

�Análisis <strong>de</strong><br />

carga y<br />

certificación<br />

�9<br />

plataformas,<br />

20 rotores<br />

<strong>de</strong>sarrollados,<br />

probados y<br />

operados<br />

Fabricación <strong>de</strong><br />

aerog<strong>en</strong>eradores<br />

�Integració<br />

n vertical y<br />

colaboradore<br />

s<br />

estratégicos<br />

�Diseño <strong>de</strong><br />

instalaciones<br />

<strong>de</strong> fabricación<br />

�30<br />

plantas <strong>en</strong><br />

todo el mundo<br />

Logística Obra civil<br />

�Más <strong>de</strong><br />

2.250<br />

aerog<strong>en</strong>erad<br />

ores/año<br />

transportado<br />

s<br />

�Más <strong>de</strong><br />

15.000<br />

operaciones<br />

al año<br />

�WOSS<br />

�Obra civil<br />

EPC<br />

�Subestacion<br />

es AT/MT y<br />

líneas EPC<br />

� 4,5 GW<br />

construidos<br />

o 3 mo<strong>de</strong>los <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> el top t<strong>en</strong> <strong>de</strong><br />

aerog<strong>en</strong>eradores instalados (Fu<strong>en</strong>te: Sun & Wind<br />

Energy 5/2009)<br />

o 3.600 MW <strong>de</strong> <strong>de</strong>sarrollo y construcción propios<br />

o > 18.000 MW instalados<br />

o > 12.000 MW <strong>en</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />

Instalación y<br />

puesta <strong>en</strong> marcha<br />

<strong>de</strong><br />

aerog<strong>en</strong>eradores<br />

�Más <strong>de</strong><br />

18 GW<br />

instalados<br />

�Servicios<br />

adicionales<br />

suministrados<br />

a solicitud<br />

Electrónica <strong>de</strong><br />

pot<strong>en</strong>cia <strong>de</strong><br />

parque eólico<br />

�Electrónica<br />

<strong>de</strong> pot<strong>en</strong>cia <strong>de</strong><br />

<strong>de</strong>sarrollo<br />

propio<br />

�WindFact<br />

(solución para<br />

caídas <strong>de</strong><br />

t<strong>en</strong>sión)<br />

�Filtros<br />

activos<br />

�Funciones<br />

<strong>de</strong> control<br />

avanzadas<br />

Servicios<br />

<strong>de</strong> valor<br />

añadido<br />

�Repot<strong>en</strong>ciació<br />

n<br />

�Desarrollo <strong>de</strong><br />

parques eólicos<br />

�Soluciones<br />

ante nuevos<br />

requerimi<strong>en</strong>tos<br />

<strong>de</strong> la red<br />

Servicio O&M y<br />

garantía a<br />

largo plazo<br />

�Catálogo <strong>de</strong><br />

servicios <strong>de</strong><br />

operación y<br />

mant<strong>en</strong>imi<strong>en</strong>to<br />

�>12 GW <strong>en</strong><br />

O&M<br />

�Mejora<br />

continua <strong>de</strong><br />

productos<br />

�83.000<br />

turbinas acum.<br />

40


Lí<strong>de</strong>r <strong>en</strong> el <strong>de</strong>sarrollo y v<strong>en</strong>ta <strong>de</strong><br />

parques eólicos<br />

o Cartera global <strong>de</strong> más <strong>de</strong> 22.000 MW<br />

o Lí<strong>de</strong>r internacional <strong>en</strong> la promoción <strong>de</strong><br />

parques eólicos, con actividad <strong>en</strong> 15<br />

países <strong>de</strong> 3 contin<strong>en</strong>tes<br />

o Posicionado estratégicam<strong>en</strong>te <strong>en</strong> los 3<br />

principales mercados eólicos: Europa,<br />

EE.UU. y China<br />

DESARROLLO DE PARQUES EÓLICOS<br />

MW ACUMULADOS<br />

2.123<br />

2006<br />

2.838<br />

3.161<br />

3.578<br />

2007 2008 2009<br />

41


Desarrollo <strong>de</strong> la cartera <strong>de</strong> parques<br />

21,115<br />

Cartera <strong>de</strong> 22 GW con proyectos significativos<br />

<strong>en</strong> las etapas finales <strong>de</strong> <strong>de</strong>sarrollo<br />

Cartera Probable Prácticam<strong>en</strong>te segura<br />

21,913<br />

8,907<br />

7,897<br />

700<br />

2,694<br />

2008 2009 2008 2009 2008 2009<br />

Europa EE.UU. China<br />

3,8x<br />

(MW)<br />

42


Socialm<strong>en</strong>te responsable<br />

Comprometidos con el <strong>de</strong>sarrollo sost<strong>en</strong>ible y con el medioambi<strong>en</strong>te<br />

Figuramos <strong>en</strong> los principales índices <strong>de</strong> sost<strong>en</strong>ibilidad<br />

43


Índice<br />

Realida<strong>de</strong>s <strong>de</strong>l sector <strong>de</strong> la <strong>en</strong>ergía eólica<br />

44


Tecnología madura <strong>de</strong>mandada <strong>en</strong> todo el mundo<br />

Capacidad eólica instalada <strong>en</strong> el mundo<br />

MW acumulados<br />

6.100 7.600<br />

1996<br />

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009<br />

Fu<strong>en</strong>te. GWEC<br />

23.900<br />

17.400<br />

13.600<br />

10.200 31.100<br />

47.620<br />

39.431<br />

59.091<br />

74.052<br />

93.835<br />

120.550<br />

157.899<br />

3% 2%2%<br />

3%<br />

3%<br />

23%<br />

13%<br />

7%<br />

16%<br />

12%<br />

16%<br />

India España China<br />

Alemania EEUU Italia<br />

Francia UK Portugal<br />

Dinamarca Resto mundo<br />

45


Crecimi<strong>en</strong>to progresivo y previsto<br />

Aerog<strong>en</strong>eradores instalados <strong>en</strong> el mundo<br />

GW<br />

11,5<br />

05<br />

Fu<strong>en</strong>te. GWEC<br />

15,2<br />

06<br />

+35%<br />

19,9<br />

07<br />

26,0<br />

08<br />

S<strong>en</strong>sible coyunturas adversas<br />

Comportami<strong>en</strong>to como otros<br />

sectores industriales<br />

38,3<br />

09<br />

+7%<br />

40,8<br />

10 E<br />

44,0<br />

48,1<br />

+12% p.a.<br />

54,5<br />

62,5<br />

11 E 12 E<br />

13 E 14 E<br />

46


Comportami<strong>en</strong>to previsible y or<strong>de</strong>nado<br />

La eólica, la única tecnología <strong>en</strong> España que cumple los objetivos<br />

<strong>de</strong>l Plan <strong>de</strong> Energías R<strong>en</strong>ovables 2005-2010<br />

1.415<br />

2.365<br />

3.530<br />

5.026<br />

6.169<br />

8.460<br />

10.011<br />

11.586<br />

15.104<br />

16.689<br />

19.149<br />

20.155<br />

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010<br />

Fu<strong>en</strong>te. AEE<br />

Plan <strong>de</strong> Energías<br />

R<strong>en</strong>ovables 2005-2010:<br />

20.155 MW<br />

Plan <strong>de</strong> Infraestructuras<br />

2002: 13.000 MW<br />

Plan <strong>de</strong> Fom<strong>en</strong>to <strong>de</strong> las<br />

ERs 1999: 8.974 MW<br />

47


La eólica, creadora <strong>de</strong> riqueza<br />

En 2008, el sector aportó al PIB más <strong>de</strong> 2.000 millones<br />

y empleó a 41.000 personas <strong>en</strong> 43 provincias <strong>en</strong><br />

España<br />

Fu<strong>en</strong>te. AEE<br />

1.138 M €<br />

primas<br />

2008<br />

Nuevos<br />

empleos<br />

41.000<br />

Importac.<br />

fósiles<br />

+2.205 M€<br />

PIB Indirecto<br />

(efecto arrastre)<br />

1.492 M €<br />

PIB Directo<br />

+ 2.311 M €<br />

Otros b<strong>en</strong>eficios<br />

sociales<br />

Balanza fiscal<br />

243 M€<br />

I+D+i<br />

189 M €<br />

Emisiones CO2<br />

+ 405,5 M €<br />

Exportaciones<br />

+2.900 M €<br />

48


Reducción emisiones CO 2<br />

Contribución <strong>de</strong> la eólica<br />

Emisiones CO 2 <strong>de</strong> las <strong>en</strong>ergías (1) <strong>en</strong> 2030<br />

Gt <strong>de</strong> CO 2<br />

27<br />

Emisiones 06<br />

39<br />

Previsiones 30<br />

8-15<br />

Efecto <strong>de</strong> la<br />

implantación <strong>de</strong><br />

nuevas políticas<br />

24-31<br />

Previsiones 2030<br />

1 Incluida g<strong>en</strong>eración, industria, transporte, construcción y otros sectores <strong>en</strong>ergéticos<br />

2 En previsiones <strong>de</strong> 550 Policy, las <strong>en</strong>ergías bajas <strong>de</strong> carbón se increm<strong>en</strong>tarán <strong>de</strong>s<strong>de</strong> el 19% <strong>de</strong> 2006 al 25% <strong>en</strong> 2030,<br />

incluy<strong>en</strong>do un increm<strong>en</strong>to <strong>de</strong> la capacidad <strong>de</strong> r<strong>en</strong>ovables <strong>de</strong> 440 GW<br />

Fu<strong>en</strong>te. IEA World Energy Outlook 2008<br />

-28%<br />

Los 158 GW <strong>de</strong> pot<strong>en</strong>cia<br />

instalada acumulada<br />

hasta 2009 produjeron<br />

340 TWh <strong>de</strong><br />

electricidad limpia y<br />

ahorraron<br />

204 millones <strong>de</strong><br />

toneladas <strong>de</strong> CO 2 /año<br />

49


Increm<strong>en</strong>to <strong>de</strong>manda mundial a medio plazo<br />

En países emerg<strong>en</strong>tes, principalm<strong>en</strong>te Asia<br />

Población sin acceso a electricidad: 1,5 billones <strong>en</strong> 2008 y 1,3 b. <strong>en</strong> 2030<br />

Fu<strong>en</strong>te. IEA<br />

2008<br />

2030<br />

Latinoamérica<br />

34,1<br />

12,8<br />

Norte <strong>de</strong> África<br />

1,7<br />

1,6<br />

587,1<br />

Medio Este<br />

21,4<br />

698,3<br />

5,1<br />

Africa subsahariana<br />

613,9<br />

China y Este <strong>de</strong> Asia<br />

195,1<br />

488,6<br />

72,5<br />

Asia Sur<br />

50


Desc<strong>en</strong>so coste g<strong>en</strong>eración eólica<br />

Curva <strong>de</strong> apr<strong>en</strong>dizaje <strong>de</strong> soluciones tecnológicas<br />

Coste in<strong>de</strong>xado para la <strong>en</strong>ergía eólica (coste por kWh) 2005 = índice 100<br />

Aprovechami<strong>en</strong>to <strong>de</strong> escalas<br />

Desarrollo tecnológico<br />

933<br />

1986<br />

Fu<strong>en</strong>te. NREL y BTM<br />

-44%<br />

522<br />

1992<br />

-32%<br />

M<strong>en</strong>ores márg<strong>en</strong>es <strong>de</strong> error e<br />

introducción <strong>de</strong> métodos <strong>de</strong> mejora<br />

Desarrollo tecnológico. Etapas más<br />

cortas para lanzam<strong>en</strong>to <strong>de</strong> producto<br />

354<br />

1996<br />

-37%<br />

224<br />

1999<br />

-33%<br />

149<br />

2002<br />

M<strong>en</strong>ores increm<strong>en</strong>tos <strong>de</strong> coste <strong>de</strong> producción<br />

y b<strong>en</strong>eficios <strong>de</strong> escala<br />

Reducción costes <strong>de</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />

Desarrollo tecnológico. Reducción <strong>de</strong>l peso.<br />

Estrategias <strong>de</strong> operación y control<br />

-33%<br />

100<br />

2005<br />

-15%<br />

85<br />

2009<br />

51


Muchas gracias<br />

Moitas grazas

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!