Compromisos de Gamesa en Galicia
Compromisos de Gamesa en Galicia
Compromisos de Gamesa en Galicia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Compromisos</strong> <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />
Después <strong>de</strong> 15 años, queremos seguir contribuy<strong>en</strong>do a su<br />
<strong>de</strong>sarrollo <strong>en</strong>ergético y económico<br />
As Somozas. A Coruña, 14 <strong>de</strong> octubre <strong>de</strong> 2010
Índice<br />
<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong>: pionera y lí<strong>de</strong>r<br />
Nuevos compromisos <strong>en</strong> <strong>Galicia</strong><br />
<strong>Gamesa</strong>, respuesta global<br />
Realida<strong>de</strong>s <strong>de</strong> la <strong>en</strong>ergía eólica<br />
2
Índice<br />
<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong>: pionera y lí<strong>de</strong>r<br />
3
<strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />
Empresa pionera y lí<strong>de</strong>r:<br />
- pres<strong>en</strong>cia <strong>en</strong> <strong>Galicia</strong> <strong>de</strong>s<strong>de</strong> hace 15 años<br />
- suministradora <strong>de</strong>l 45% <strong>de</strong> la pot<strong>en</strong>cia eólica total instalada (1.478 MW)<br />
<strong>Compromisos</strong> <strong>de</strong> inversión y creación <strong>de</strong> empleo superados<br />
Grupo industrial eólico con mayor implantación industrial<br />
Promotor eólico refer<strong>en</strong>te <strong>en</strong> el mercado: 700 MW<br />
Lí<strong>de</strong>r tecnológico<br />
Contribución al <strong>de</strong>sarrollo económico local<br />
4
Cumplimi<strong>en</strong>to <strong>de</strong> compromisos<br />
Cumplimi<strong>en</strong>to <strong>de</strong> los compromisos<br />
o <strong>Gamesa</strong> no sólo ha ejecutado íntegram<strong>en</strong>te su Plan Industrial, sino que ha invertido<br />
casi el triple y ha g<strong>en</strong>erado más <strong>de</strong>l doble <strong>de</strong> empleo que lo comprometido <strong>en</strong> el Plan<br />
Eólico Estratégico 2000 por el que la Xunta <strong>de</strong> <strong>Galicia</strong> concedió a la compañía el<br />
<strong>de</strong>sarrollo <strong>de</strong> 600 MW (ampliados a 760 MW <strong>en</strong> 2000):<br />
o 59,9 millones <strong>de</strong> euros fr<strong>en</strong>te a los 22,2 M euros comprometidos: x 2,7<br />
o G<strong>en</strong>eración <strong>de</strong> 541 empleos directos fr<strong>en</strong>te a los 240 comprometidos: x 2,3<br />
o Como promotor, <strong>Gamesa</strong> ha instalado <strong>en</strong> <strong>Galicia</strong> 663 MW y ti<strong>en</strong>e <strong>en</strong> tramitación<br />
administrativa 96 MW. La promoción <strong>de</strong> estos parques ha supuesto una inversión<br />
aproximada <strong>de</strong> 700 millones <strong>de</strong> euros <strong>de</strong> los que un 85% (600 millones <strong>de</strong> euros) han<br />
sido <strong>de</strong> inversión <strong>en</strong> <strong>Galicia</strong><br />
5
Cumplimi<strong>en</strong>to <strong>de</strong> compromisos<br />
<strong>Gamesa</strong> ha invertido casi el triple y ha g<strong>en</strong>erado casi dos<br />
veces más empleo <strong>de</strong>l comprometido<br />
INVERSIONES EN GALICIA<br />
Millones <strong>de</strong> euros<br />
x 2,7<br />
22,2<br />
59,8<br />
EMPLEO GENERADO EN GALICIA<br />
x 2,3<br />
Comprometido Realizado<br />
Comprometido Realizado<br />
240<br />
541<br />
6
Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Contribución al <strong>de</strong>sarrollo local<br />
o Compras a proveedores gallegos: 743 millones <strong>de</strong> euros (2006-2009)<br />
� 180 millones <strong>de</strong> euros anuales (200 millones anuales si se le suman inversiones y salarios)<br />
o G<strong>en</strong>erador <strong>de</strong> empleo: 550 empleos directos y + 1.150 trabajadores (directo e indirecto)<br />
o Dinamizador Puerto <strong>de</strong> Ferrol: <strong>de</strong>s<strong>de</strong> 2005, el tráfico <strong>de</strong> mercancía eólica <strong>de</strong>l puerto se ha<br />
increm<strong>en</strong>tado <strong>en</strong> más <strong>de</strong> dos dígitos cada año:<br />
� Durante los últimos cuatro años, el tráfico <strong>de</strong> compon<strong>en</strong>tes eólicos g<strong>en</strong>erado por <strong>Gamesa</strong> <strong>en</strong> el<br />
Puerto <strong>de</strong> Ferrol ha asc<strong>en</strong>dido a más <strong>de</strong> 215.000 tn, que repres<strong>en</strong>tan la mitad <strong>de</strong>l tráfico total<br />
<strong>de</strong> material eólico <strong>de</strong>l puerto<br />
� En 2008, <strong>Gamesa</strong> <strong>en</strong>vió a través <strong>de</strong>l puerto más <strong>de</strong> 1.700 piezas a USA, Francia, Polonia e<br />
Italia. En 2009, y pese a las dificulta<strong>de</strong>s <strong>de</strong>l sector, la compañía ha embarcado 1.100 piezas<br />
con <strong>de</strong>stino Francia, Bélgica, Italia y Polonia<br />
� El volum<strong>en</strong> <strong>de</strong> negocio g<strong>en</strong>erado por <strong>Gamesa</strong> a empresas que ti<strong>en</strong><strong>en</strong> como núcleo <strong>de</strong> trabajo<br />
el Puerto <strong>de</strong> Ferrol asc<strong>en</strong>dió a cerca <strong>de</strong> 2 millones <strong>de</strong> euros <strong>en</strong> 2009<br />
7
Compromiso <strong>de</strong> <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Implantación industrial - actor más relevante <strong>de</strong>l sector<br />
o Grupo industrial eólico con mayor implantación industrial:<br />
� Planta <strong>de</strong> fabricación <strong>de</strong> palas y vigas <strong>de</strong> As Somozas<br />
� Planta <strong>de</strong> <strong>en</strong>samblaje <strong>de</strong> nacelles <strong>de</strong> Sigüeiro<br />
� Planta <strong>de</strong> multiplicadoras TEGSA <strong>de</strong> Bergondo<br />
� C<strong>en</strong>tro Regional Operativo <strong>en</strong> Santiago <strong>de</strong> Compostela<br />
� C<strong>en</strong>tro Logístico (CTL) <strong>de</strong> As Pontes<br />
� Delegación <strong>de</strong> <strong>Gamesa</strong> Energía <strong>en</strong> Santiago <strong>de</strong> Compostela<br />
Inversión <strong>de</strong> 60 millones <strong>de</strong> euros <strong>en</strong> sus instalaciones industriales<br />
<strong>Gamesa</strong> ha anunciado la creación <strong>de</strong> su C<strong>en</strong>tro Europeo <strong>de</strong> Reparación <strong>de</strong> Gran<strong>de</strong>s Compon<strong>en</strong>tes. La <strong>de</strong>cisión, que requerirá el traslado <strong>de</strong>l<br />
c<strong>en</strong>tro <strong>de</strong> Bergondo a Sigüeiro, se toma con el propósito <strong>de</strong> garantizar la empleabilidad <strong>de</strong> los trabajadores <strong>de</strong> ambas plantas<br />
8
Compromiso <strong>de</strong> <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Implantación industrial - actor más relevante <strong>de</strong>l sector<br />
<strong>Gamesa</strong>, actor tecnológico más relevante <strong>de</strong>l sector industrial eólico <strong>de</strong> <strong>Galicia</strong>, con inversiones <strong>de</strong> 60<br />
millones <strong>de</strong> euros, que han contribuido a fortalecer su tejido industrial<br />
Planta <strong>de</strong> Ensamblaje <strong>de</strong> Nacelles<br />
• Sigüeiro (A Coruña)<br />
• Nº Empleados: 55 trabajadores<br />
• Inicio <strong>de</strong> Actividad <strong>en</strong> 2005<br />
C<strong>en</strong>tro Regional Operativo<br />
• Santiago <strong>de</strong> Compostela (A<br />
Coruña)<br />
• Nº Empleados: 36 + 104<br />
subcontratados<br />
Delegación Promoción Parques<br />
• Santiago <strong>de</strong> Compostela (A<br />
Coruña)<br />
• Nº Empleados: 14 trabajadores<br />
Planta <strong>de</strong> Multiplicadoras TEGSA<br />
• Bergondo (A Coruña)<br />
• Nº Empleados: 41 trabajadores<br />
• Inicio <strong>de</strong> Actividad <strong>en</strong> 1997<br />
*Planta <strong>de</strong> Fabricación <strong>de</strong> Palas<br />
• Somozas (A Coruña)<br />
• Nº Empleados: 268 empleados<br />
• Inicio <strong>de</strong> Actividad <strong>en</strong> 1998<br />
C<strong>en</strong>tro Logístico<br />
• As Pontes (A Coruña).<br />
• Nº empleados: 23 trabajadores<br />
• Inicio actividad: 2009<br />
(*) Planta <strong>de</strong> Fabricación <strong>de</strong> Palas incluye fabricación <strong>de</strong> vigas<br />
(Edificio I <strong>en</strong> la misma planta <strong>de</strong> Somozas)<br />
9
Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />
10
Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />
11
Compromiso <strong>Gamesa</strong> con <strong>Galicia</strong><br />
Implantación industrial – conocimi<strong>en</strong>to integral <strong>de</strong>l negocio<br />
12
Promotor eólico <strong>de</strong> refer<strong>en</strong>cia<br />
759,69 MW propios instalados o <strong>en</strong> fase <strong>de</strong> <strong>de</strong>sarrollo<br />
PARQUES EN OPERACIÓN MW<br />
Coriscada 24,00<br />
Muras I 24,42<br />
Monteseixo 24,42<br />
Serra do Cando 24,42<br />
Muras II 24,42<br />
Forgoselo 24,42<br />
Outeiro <strong>de</strong> Coto 15,37<br />
Montetreito 30,39<br />
Masgalán 49,50<br />
Serra da Panda 18,48<br />
Ameixeiras 49,50<br />
P<strong>en</strong>a da Cruz 12,75<br />
Viveiro 36,55<br />
Pedregal – Tremuzo I 30,60<br />
Monte do Carrio 31,45<br />
P<strong>en</strong>a da Cruz II 10,20<br />
Pedregal – Tremuzo II 14,00<br />
Serra <strong>de</strong> Meira 49,30<br />
Goiapeñote 40,00<br />
Serra da Loba 36,00<br />
P<strong>en</strong>a Revolta 14,00<br />
M. Arca (fase I) 6,00<br />
Farrapa I (fase I) 20,00<br />
Pousadoiro (fase I) 23,50<br />
TOTAL 633,69<br />
Alto do Seixal (Farrapa I, fase II) – P<strong>en</strong>di<strong>en</strong>te inscripción 30,00<br />
registro<br />
PARQUES EN TRAMITACIÓN MW<br />
Alto da Croa 8,00<br />
Fonseca (Pou Sadoiro fase II) 26,00<br />
Farrapa II 20,00<br />
TOTAL 54,00<br />
POTENCIA ADMITIDA A TRÁMITE EN 2010 MW<br />
Monte Arca (fase I, ampl.) 4,00<br />
Cabanelas 18,00<br />
Monte Tourado 6,00<br />
Alto da Croa II 14,00<br />
TOTAL 42,00<br />
13
Lí<strong>de</strong>r tecnológico<br />
Plataformas <strong>Gamesa</strong><br />
G5X-850 KW<br />
Máximo r<strong>en</strong>dimi<strong>en</strong>to <strong>en</strong><br />
emplazami<strong>en</strong>tos con vi<strong>en</strong>tos<br />
bajos (G58), medios y altos<br />
(G52),<strong>en</strong> todo tipo <strong>de</strong> terr<strong>en</strong>os<br />
G9X-2,0 MW<br />
La plataforma más versátil <strong>de</strong>l<br />
mercado con la máxima producción<br />
para cualquier tipo <strong>de</strong><br />
emplazami<strong>en</strong>to<br />
G10X-4,5 MW<br />
M<strong>en</strong>or coste <strong>de</strong> <strong>en</strong>ergía con la<br />
facilidad <strong>de</strong> transporte e<br />
instalación <strong>de</strong> un aerog<strong>en</strong>erador<br />
<strong>de</strong> 2,0 MW<br />
14
Lí<strong>de</strong>r tecnológico<br />
Listos <strong>en</strong> offshore <strong>en</strong> 2014<br />
o Trabajando <strong>en</strong> dos familias <strong>de</strong> plataformas offshore (G11X), aprovechando conocimi<strong>en</strong>tos propios<br />
<strong>en</strong> tecnología multi-MW<br />
� Plataforma <strong>de</strong> 5MW: prototipos <strong>en</strong> el 2012 y pre-series <strong>en</strong> el 2013<br />
� Pre-series <strong>de</strong> la plataforma <strong>de</strong> 6MW-7MW <strong>en</strong> el 2015<br />
o Acuerdo con la americana Northrop Grumman <strong>en</strong> tecnología eólica marina<br />
� Puesta <strong>en</strong> marcha <strong>de</strong>l primer prototipo marino <strong>de</strong> la plataforma G11X-5,0 MW <strong>en</strong> EEUU<br />
� Instalación <strong>de</strong> dos prototipos G11X-5,0 MW <strong>en</strong> el último trimestre <strong>de</strong> 2012<br />
� Ambas compañías planean trabajar <strong>de</strong> forma conjunta <strong>en</strong> el <strong>de</strong>sarrollo <strong>de</strong> nuevas<br />
g<strong>en</strong>eraciones <strong>de</strong> plataformas marinas<br />
Listos para los <strong>de</strong>sarrollos previstos <strong>en</strong> Norte <strong>de</strong> Europa<br />
15
Índice<br />
Nuevos compromisos <strong>en</strong> <strong>Galicia</strong><br />
16
El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />
Contribuir a que <strong>Galicia</strong> recupera su li<strong>de</strong>razgo <strong>en</strong> pot<strong>en</strong>cia eólica<br />
instalada <strong>en</strong> España<br />
Ayudando a g<strong>en</strong>erar riqueza y empleo <strong>en</strong> la Comunidad<br />
Impulsando el <strong>de</strong>sarrollo empresarial local<br />
Incorporando innovación tecnológica<br />
Con el compromiso <strong>de</strong> seguir contribuy<strong>en</strong>do al <strong>de</strong>sarrollo sost<strong>en</strong>ible<br />
17
El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />
Propuesta <strong>de</strong> <strong>Gamesa</strong> - nuevo concurso eólico<br />
o <strong>Gamesa</strong> ha pres<strong>en</strong>tado la solicitud <strong>de</strong> asignación <strong>de</strong> pot<strong>en</strong>cia eólica, al amparo <strong>de</strong> la Or<strong>de</strong>n <strong>de</strong> 29 <strong>de</strong><br />
marzo <strong>de</strong> 2010, <strong>de</strong> 460,5 MW <strong>en</strong> 12 proyectos<br />
o <strong>Gamesa</strong> se pres<strong>en</strong>ta al concurso eólico <strong>de</strong> <strong>Galicia</strong> a través <strong>de</strong> tres socieda<strong>de</strong>s que forman parte <strong>de</strong><br />
su grupo empresarial: <strong>Gamesa</strong> Energía <strong>Galicia</strong>, V<strong>en</strong>to Ártabro y Eólica da Ca<strong>de</strong>ira. En las dos últimas<br />
socieda<strong>de</strong>s, ya constituidas <strong>de</strong>s<strong>de</strong> hace años, participan socios gallegos, como son Galiv<strong>en</strong>to Enerxía<br />
y Energías R<strong>en</strong>ovables Costa Coruña, respectivam<strong>en</strong>te<br />
o Las zonas <strong>en</strong> las que se pres<strong>en</strong>ta <strong>Gamesa</strong>, a través <strong>de</strong> sus participadas con sus 12 proyectos, son<br />
las zonas 2, 6, 7, 8 y 10<br />
o Junto a su verti<strong>en</strong>te como promotor eólico, <strong>Gamesa</strong> compite <strong>en</strong> este concurso también como<br />
fabricante e instalador <strong>de</strong> aerog<strong>en</strong>eradores y para ello ha pres<strong>en</strong>tado un plan industrial vinculado a<br />
la obt<strong>en</strong>ción <strong>de</strong> una <strong>de</strong>terminada pot<strong>en</strong>cia (1.200 MW) <strong>en</strong> la resolución <strong>de</strong> dicho concurso<br />
18
El futuro <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong><br />
Inversión industrial y creación <strong>de</strong> empleo nuevo<br />
NUEVA PROPUESTA INDUSTRIAL GAMESA<br />
INVERSIÓN NUEVO<br />
MM euros EMPLEO<br />
Nuevo c<strong>en</strong>tro producción palas G97 - As Somozas 20,0 37<br />
Nuevo c<strong>en</strong>tro producción palas G10X - As Somozas 20,0 25<br />
Nuevo núcleo mant<strong>en</strong>imi<strong>en</strong>to – Oroso 6,8 120<br />
Consolidación plataforma logística – As Pontes 3,2 -<br />
Implantación fabricación dovelas para G10X - Coirós 1,5 44<br />
51,1 226<br />
Nuevo empleo g<strong>en</strong>erado directo + indirecto nuevo plan industrial: 479 personas, más los posibles puestos g<strong>en</strong>erados durante la construcción<br />
y puesta <strong>en</strong> marcha <strong>de</strong> los parques eólicos<br />
Empleo g<strong>en</strong>erado por <strong>Gamesa</strong> <strong>en</strong> <strong>Galicia</strong> una vez ejecutado nuevo plan industrial: 767 directos y 1.600 (directos e indirectos)<br />
19
Producción <strong>de</strong> palas G97-2MW<br />
o Más producción <strong>en</strong>ergética que el actual lí<strong>de</strong>r <strong>de</strong>l mercado <strong>en</strong> los<br />
aerog<strong>en</strong>eradores 2 MW Clase III: c. 14% más producción<br />
<strong>en</strong>ergética que el actual G90-2 MW Clase III<br />
o Tecnología punta <strong>de</strong> fabricación <strong>de</strong> palas: nuevo diseño<br />
aerodinámico, mejora el área <strong>de</strong> barrido (+16%), m<strong>en</strong>or ruido<br />
o Rotor <strong>de</strong> 97 m <strong>de</strong> diámetro para Clase III (vi<strong>en</strong>to bajo) don<strong>de</strong> se<br />
prevé más <strong>de</strong>l 50% <strong>de</strong> la <strong>de</strong>manda <strong>en</strong> la categoría <strong>de</strong> 2MW<br />
o Otras tecnologías: tecnología <strong>de</strong> paso y velocidad variable para<br />
maximizar la <strong>en</strong>ergía producida; sistema yaw activo, para<br />
asegurar una óptima adaptación a terr<strong>en</strong>os complejos; <strong>Gamesa</strong><br />
Windnet® (sistema <strong>de</strong> control y monitorización remota con<br />
acceso web); <strong>Gamesa</strong> SMP (sistema propio <strong>de</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />
prev<strong>en</strong>tivo; conexión a red internacional, etc.<br />
o Mejoras <strong>en</strong> las prestaciones (curva <strong>de</strong> pot<strong>en</strong>cia y niveles <strong>de</strong><br />
ruido) e imag<strong>en</strong> r<strong>en</strong>ovada (diseño <strong>de</strong> nacelle y refrigeración <strong>de</strong>l<br />
interior <strong>de</strong> la nacelle)<br />
20
<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />
Technological highlights<br />
BLADES<br />
CHARACTERISTICS<br />
o Bla<strong>de</strong>s: 39m for G80-2.0 MW, 42,5m for G87-2.0<br />
MW, 44m for G90-2.0 MW and 47,5m for G97-2.0<br />
MW<br />
o State-of-the-art manufacturing process:<br />
manufactured from organic matrix composite<br />
material, with carbon or glassfiber reinforcem<strong>en</strong>t<br />
o Lightining protection system<br />
o The structure of each bla<strong>de</strong> consists of two shells<br />
glued to a spar or internal beams<br />
o Innovative airfoil for new G97 that minimizes<br />
noise<br />
o Lighter bla<strong>de</strong>s maintaining stiffness which<br />
reduces loads transmitted to the <strong>en</strong>tire<br />
system<br />
o High <strong>en</strong>ergy production and minimum noise<br />
level thanks to optimized airfoils<br />
o The bla<strong>de</strong> is <strong>de</strong>signed to fulfill two basic<br />
functions: structure and aerodynamics<br />
o Easier maint<strong>en</strong>ance<br />
ADVANTAGES<br />
21
G97-2.0 MW IIIA<br />
Innovative bla<strong>de</strong><br />
Ext<strong>en</strong>sive validation including wind tunnel tests<br />
Highest effici<strong>en</strong>cy low noise airfoils<br />
22
<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />
Technological highlights<br />
DRIVE TRAIN<br />
CHARACTERISTICS<br />
o Main shaft supported on two bearings<br />
o 3-stage gearbox with 2 parallel shafts and one<br />
planetary stage.<br />
o High-speed shaft connected to the g<strong>en</strong>erator by<br />
means of a flexible coupling with a torque<br />
limiter system<br />
o Torque arms are used to attach the gear box to<br />
the frame by means of shock absorbers<br />
o The gearbox has a lubrication system which<br />
permits attaining a <strong>de</strong>gree of oil purity of up to<br />
3µm, which reduces the pot<strong>en</strong>tial number of<br />
malfunctions.<br />
ADVANTAGES<br />
o Main shaft <strong>de</strong>sign prev<strong>en</strong>ts any load except<br />
the torque from being transmitted to the<br />
gear box, which minimizes the occurr<strong>en</strong>ce<br />
of any problems with this compon<strong>en</strong>t.<br />
o Gear box is allowed to be disassembled<br />
without the need to take apart the main<br />
shaft.<br />
o Flexible coupling prev<strong>en</strong>ts overloading the<br />
transmission chain.<br />
o Thanks to the modular <strong>de</strong>sign of the power<br />
train, the weight of the gear box is borne by<br />
the main shaft, while the shock absorbers<br />
joined to the frame react to any torque,<br />
prev<strong>en</strong>ting the gear box from rotating and<br />
any un<strong>de</strong>sired charges on the gear box.<br />
23
<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />
Technological highlights<br />
ACTIVE YAW<br />
CHARACTERISTICS ADVANTAGES<br />
o 4 electrical motors operated by WT controller<br />
based on information received from the<br />
anemometers mounted on top of the nacelle<br />
o The yaw is active with hydraulic brake clamp that<br />
can be regulated gradually<br />
o The system is composed of 5 clamps avoid<br />
fatigues and failures in the Yaw system<br />
o The <strong>Gamesa</strong> Active Yaw system is submitted to<br />
accelerated lifetime test cycles and aging tests on<br />
the <strong>Gamesa</strong> UPB testing b<strong>en</strong>ch<br />
o Combined activation of friction bearing and<br />
ret<strong>en</strong>tion clamps prev<strong>en</strong>ts fatigue and<br />
possible damage to the ring<br />
o The ring is divi<strong>de</strong>d into 6 sectors, in or<strong>de</strong>r to<br />
make it easier to repair any possible tooth<br />
damage<br />
o HALT tests <strong>en</strong>sure and improve the<br />
reliability of this compon<strong>en</strong>t, validating its<br />
correct <strong>de</strong>sign and providing feedback on<br />
the virtual mo<strong>de</strong>ls in or<strong>de</strong>r to re<strong>de</strong>sign<br />
them, incorporating future improvem<strong>en</strong>ts<br />
24
<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />
Technological highlights<br />
PITCH SYSTEM<br />
CHARACTERISTICS ADVANTAGES<br />
o In<strong>de</strong>p<strong>en</strong><strong>de</strong>nt hydraulic actuators for each bla<strong>de</strong><br />
that provi<strong>de</strong> a rotational capacity betwe<strong>en</strong> -5º and<br />
90º<br />
o The pitch system is activated during the <strong>en</strong>tire<br />
time the wind turbine operates<br />
o Wh<strong>en</strong> the wind speed is below the rated speed, the<br />
pitch angle will be selected in or<strong>de</strong>r to maximize the<br />
electrical power obtained for each wind speed.<br />
o Wh<strong>en</strong> the wind speed is above the rate speed, the<br />
pitch angle will be the one that provi<strong>de</strong>s the<br />
machine's rated power.<br />
o Having an in<strong>de</strong>p<strong>en</strong><strong>de</strong>nt pitch on each bla<strong>de</strong><br />
provi<strong>de</strong>s redundancy for the aerodynamic<br />
brake system<br />
o The hydraulic system has an accumulator<br />
system that allows the bla<strong>de</strong>s to be turned<br />
to their feathered position, in case of an<br />
emerg<strong>en</strong>cy<br />
o The hydraulic system provi<strong>de</strong>s greater<br />
activation speed than other types of<br />
systems. Due to the hydraulic accumulator<br />
system, no batteries are required for<br />
operation, which increases reliability during<br />
emerg<strong>en</strong>cy situations<br />
25
<strong>Gamesa</strong> G9X g<strong>en</strong>eral characteristics<br />
Technological highlights<br />
ELECTRICAL SYSTEMS<br />
CHARACTERISTICS ADVANTAGES<br />
o The g<strong>en</strong>erator is a double-fed, 4-pole variety<br />
with a wound rotor and slip rings. It is highly<br />
effici<strong>en</strong>t and cooled by and air-air system<br />
o The transformer is a three-phase, dry<br />
<strong>en</strong>capsulated mo<strong>de</strong>l, with differ<strong>en</strong>t output<br />
voltage options and differ<strong>en</strong>t appar<strong>en</strong>t power<br />
ranges. It has be<strong>en</strong> specially <strong>de</strong>signed for wind<br />
<strong>en</strong>ergy applications<br />
o The control system allows the system to work<br />
at variable speeds, using the rotor int<strong>en</strong>sity<br />
frequ<strong>en</strong>cy control<br />
o Optimal operation for any wind speed,<br />
maximizing the production and minimizing<br />
loads and noise, thanks to the variable<br />
speed operation<br />
o Active and reactive power control<br />
o Synchronous behavior with regards to the<br />
grid<br />
o The g<strong>en</strong>erator is protected from shortcircuits<br />
and overloads. The temperature is<br />
also continuously monitored by s<strong>en</strong>sors<br />
o The transformer's location in the nacelle<br />
prev<strong>en</strong>ts electrical loss due to the reduced<br />
l<strong>en</strong>gth of the low voltage cables, and it also<br />
reduces the visual impact<br />
26
G10X- 4,5 MW<br />
El futuro <strong>de</strong> la <strong>en</strong>ergía eólica<br />
o Aerog<strong>en</strong>erador más pot<strong>en</strong>te <strong>en</strong> el mercado eólico onshore<br />
o Con 4,5 MW <strong>de</strong> pot<strong>en</strong>cia unitaria, pres<strong>en</strong>ta un m<strong>en</strong>or coste <strong>de</strong><br />
<strong>en</strong>ergía y la facilidad <strong>de</strong> transporte e instalación <strong>de</strong> un<br />
aerog<strong>en</strong>erador <strong>de</strong> 2,0 MW<br />
o Con un rotor <strong>de</strong> 128 m <strong>de</strong> diámetro y torre híbrida fabricada <strong>en</strong><br />
hormigón y acero <strong>de</strong> 120 m<br />
o Se diseño y <strong>de</strong>sarrollo incluye innovaciones tecnológicas<br />
novedosas hasta ahora <strong>en</strong> el mercado, basadas <strong>en</strong> conceptos <strong>de</strong><br />
diseño y validación equiparables a los <strong>de</strong> la industria<br />
aeronáutica, como Innobla<strong>de</strong>®, Multismart®, ConcreTower®,<br />
CompactTrain®, Flexibit® y GridMate®, <strong>en</strong>tre otras<br />
o La producción anual <strong>de</strong> un único aerog<strong>en</strong>erador pue<strong>de</strong><br />
proporcionar electricidad a 3.169 hogares <strong>en</strong> un año, sustituir<br />
cerca <strong>de</strong> 1.000 tn equival<strong>en</strong>tes <strong>de</strong> petróleo (tep/año) y evitar la<br />
emisión a la atmósfera <strong>de</strong> 6.750 tn <strong>de</strong> CO 2 /año<br />
27
<strong>Gamesa</strong> G10X-4,5 MW<br />
28
Índice<br />
<strong>Gamesa</strong>, respuesta global<br />
30
<strong>Gamesa</strong> global<br />
Base industrial y comercial <strong>en</strong> principales mercados<br />
MW instalados acumulados a 2009: más <strong>de</strong> 18.000<br />
América<br />
2.382 MW<br />
Europa<br />
13.236 MW<br />
N. África<br />
659 MW<br />
Asia<br />
1.969 MW<br />
V<strong>en</strong>tas MWe 2009<br />
España<br />
27%<br />
RoW<br />
11%<br />
China<br />
15%<br />
EEUU<br />
15%<br />
Resto<br />
Europa<br />
32%<br />
31
<strong>Gamesa</strong> global<br />
o Actividad crucial <strong>en</strong> la lucha contra el cambio climático<br />
o Más <strong>de</strong> 18.000 MW instalados <strong>de</strong>s<strong>de</strong> 1998, lo que supone 27 millones <strong>de</strong> toneladas<br />
CO 2/año evitadas<br />
MW ACUMULADOS INSTALADOS<br />
9.945<br />
12.864<br />
16.087<br />
18.246<br />
2006 2007 2008 2009<br />
AHORRO EMISIONES GASES EFECTO<br />
INVERNADERO<br />
Toneladas <strong>de</strong> CO 2 evitadas por MW instalado<br />
14.700.000<br />
19.200.000<br />
24.000.000<br />
27.000.000<br />
2006 2007 2008 2009<br />
32
<strong>Gamesa</strong> global 09<br />
Base industrial y comercial <strong>en</strong> principales mercados<br />
EE.UU.<br />
C<strong>en</strong>tros <strong>de</strong> producción<br />
2 <strong>en</strong> P<strong>en</strong>silvania<br />
Compon<strong>en</strong>tes<br />
Palas<br />
Ensamblaje nacelles<br />
Capacidad productiva<br />
> 1.200 MW<br />
Europa<br />
C<strong>en</strong>tros <strong>de</strong> producción<br />
23 <strong>en</strong> España<br />
Compon<strong>en</strong>tes<br />
Diseño y fabricación<br />
integral<br />
Capacidad productiva<br />
> 2.000 MW<br />
Asia<br />
C<strong>en</strong>tros <strong>de</strong> producción<br />
4 <strong>en</strong> China (+2 <strong>en</strong><br />
construcción)<br />
1 <strong>en</strong> India<br />
Compon<strong>en</strong>tes<br />
Palas, <strong>en</strong>samblaje<br />
nacelles,<br />
multiplicadoras,<br />
g<strong>en</strong>eradores<br />
Capacidad productiva<br />
1.200 MW<br />
Estrategia <strong>de</strong> crecimi<strong>en</strong>to reforzada con la ampliación <strong>de</strong> la capacidad productiva <strong>en</strong><br />
China, India y EE.UU.<br />
33
La tecnología: un valor corporativo<br />
o I+D+i está integrada <strong>en</strong> toda la ca<strong>de</strong>na <strong>de</strong> diseño y producción <strong>de</strong> cada una <strong>de</strong> las plantas. El<br />
apoyo <strong>de</strong>l Banco Europeo <strong>de</strong> Inversiones (BEI), a través <strong>de</strong> un préstamo <strong>de</strong> 200 millones <strong>de</strong> euros,<br />
avalan el Plan <strong>de</strong> Investigación, Desarrollo e Innovación <strong>en</strong>tre 2008 y 2011.<br />
o <strong>Gamesa</strong> cu<strong>en</strong>ta con cinco c<strong>en</strong>tros <strong>de</strong> I+D repartidos <strong>en</strong>tre España, Dinamarca, USA y China.<br />
o El <strong>de</strong>partam<strong>en</strong>to <strong>de</strong> I+D <strong>de</strong> <strong>Gamesa</strong> está formado por 600 personas.<br />
o Trabaja <strong>de</strong> manera coordinada y alineada tecnológicam<strong>en</strong>te con el conjunto <strong>de</strong>l sector eólico,<br />
participando <strong>en</strong> los sigui<strong>en</strong>tes proyectos <strong>de</strong> I+D que cu<strong>en</strong>tan con financiación institucional.<br />
o Windli<strong>de</strong>r 2015: li<strong>de</strong>ra un consorcio que cu<strong>en</strong>ta con financiación española <strong>de</strong>l programa CENIT. El proyecto ti<strong>en</strong>e<br />
como objeto dominar el diseño <strong>de</strong> gran<strong>de</strong>s aerog<strong>en</strong>eradores (multimegavatio).<br />
o Upwind: participa <strong>en</strong> este proyecto europeo que investiga la g<strong>en</strong>eración eólica <strong>de</strong>l futuro y el diseño <strong>de</strong> muy gran<strong>de</strong>s<br />
aerog<strong>en</strong>eradores (8-10MW) tanto <strong>en</strong> emplazami<strong>en</strong>tos terrestres como marinos.<br />
o Reliawind: li<strong>de</strong>ra este proyecto europeo con objetivo <strong>de</strong> profundizar <strong>en</strong> los conceptos <strong>de</strong> fiabilidad <strong>en</strong> el diseño,<br />
operación y mant<strong>en</strong>imi<strong>en</strong>to <strong>de</strong> los aerog<strong>en</strong>eradores.<br />
34
<strong>Gamesa</strong> global<br />
Socio <strong>de</strong> confianza, suministrador <strong>de</strong> los principales<br />
actores <strong>de</strong> la industria eólica<br />
NREA<br />
New & R<strong>en</strong>ewable Energy<br />
Authority<br />
Consolidación <strong>en</strong> mercados<br />
estratégicos (Europa, EE.UU. y<br />
China)<br />
Entrada <strong>en</strong> nuevos mercados<br />
(Europa <strong>de</strong>l Este y Norte <strong>de</strong><br />
África)<br />
35
<strong>Gamesa</strong> global<br />
Fr<strong>en</strong>te a un nuevo mercado y para maximizar<br />
el crecimi<strong>en</strong>to<br />
Nuevo <strong>en</strong>foque comercial para maximizar el crecimi<strong>en</strong>to <strong>de</strong> v<strong>en</strong>tas<br />
� Apertura <strong>de</strong> nuevos mercados<br />
� Nuevos segm<strong>en</strong>tos <strong>de</strong> cli<strong>en</strong>tes<br />
� Impulso, servicios <strong>de</strong> operación y mant<strong>en</strong>imi<strong>en</strong>to<br />
Aum<strong>en</strong>to <strong>de</strong> la competitividad <strong>de</strong> nuestra cartera <strong>de</strong> productos<br />
� 2 nuevos productos para vi<strong>en</strong>tos <strong>de</strong> nivel bajo y medio<br />
� 1 nueva plataforma <strong>de</strong> productos: G10X – 4,5 MW<br />
� 1 nuevo segm<strong>en</strong>to <strong>de</strong> negocio: <strong>en</strong>ergía eólica marina (Offshore)<br />
Avances continuos <strong>en</strong> la optimización <strong>de</strong> costes para conseguir una t<strong>en</strong><strong>de</strong>ncia<br />
creci<strong>en</strong>te <strong>en</strong> márg<strong>en</strong>es más allá <strong>de</strong> 2010<br />
Ajuste <strong>de</strong> la capacidad flexible <strong>de</strong> producción a la <strong>de</strong>manda <strong>de</strong>l mercado<br />
36
<strong>Gamesa</strong> global<br />
Nuevo <strong>en</strong>foque comercial<br />
COLABORACIONES EN<br />
PRODUCTOS<br />
Alianzas con cli<strong>en</strong>tes clave para<br />
el <strong>de</strong>sarrollo <strong>de</strong> nuevos<br />
productos basados <strong>en</strong> las<br />
necesida<strong>de</strong>s <strong>de</strong>l cli<strong>en</strong>te<br />
PRESENCIA LOCAL<br />
Ampliación significativa <strong>de</strong> la<br />
red <strong>de</strong> oficinas <strong>de</strong> v<strong>en</strong>ta <strong>en</strong><br />
Europa y <strong>en</strong> el resto <strong>de</strong>l<br />
mundo<br />
BASADO EN EL VALOR<br />
Enfoque basado <strong>en</strong> la<br />
compr<strong>en</strong>sión y la maximización<br />
<strong>de</strong>l valor para los cli<strong>en</strong>tes<br />
NUEVO<br />
ENFOQUE<br />
COMERCIAL<br />
ENFOQUE FLEXIBLE<br />
La adaptación <strong>de</strong> los procesos<br />
internos reduce el tiempo <strong>de</strong><br />
respuesta y aum<strong>en</strong>ta la<br />
flexibilidad<br />
SOPORTE GLOBAL<br />
Gestión global <strong>de</strong> cli<strong>en</strong>tes<br />
clave con soporte operativo<br />
local<br />
SOLUCIONES A MEDIDA<br />
La gama más amplia <strong>de</strong><br />
productos y servicios para<br />
ofrecer soluciones específicas<br />
para cada parque eólico<br />
37
Apertura <strong>de</strong> nuevos mercados<br />
Pres<strong>en</strong>cia y respuestas globales<br />
Objetivo: x 2 red <strong>de</strong> v<strong>en</strong>tas, x 3 MW ofrecidos y x 4 número <strong>de</strong> ofertas<br />
Mercados con base instalada<br />
Mercados con proyectos <strong>en</strong> construcción<br />
Mercados con nuevas ofertas<br />
38
Vanguardia tecnológica<br />
Lanzami<strong>en</strong>to <strong>de</strong> nuevos productos<br />
Nuevo Diámetro Pot<strong>en</strong>cia IEC Clase<br />
producto rotor nominal<br />
G58 58 0,85 MW IIA<br />
G90 90 2,0 MW IIA<br />
G97 97 2,0 MW IIIA<br />
G128 128 4,5 MW IIA<br />
G136 136 + 4,0 MW IIIA<br />
Lanzami<strong>en</strong>to <strong>de</strong> dos nuevos<br />
productos para vi<strong>en</strong>tos <strong>de</strong><br />
velocida<strong>de</strong>s medias y bajas <strong>en</strong> el<br />
próximo ciclo <strong>de</strong> actividad<br />
Una nueva plataforma completa<br />
<strong>de</strong> productos: G10X-4,5 MW<br />
Un nuevo segm<strong>en</strong>to: <strong>en</strong>ergía<br />
eólica marina<br />
39
�3,6 GW <strong>de</strong><br />
<strong>de</strong>sarrollo y<br />
construcció<br />
n propios<br />
� Lic<strong>en</strong>cias<br />
Lí<strong>de</strong>r <strong>en</strong> el <strong>de</strong>sarrollo y v<strong>en</strong>ta <strong>de</strong><br />
parques eólicos<br />
� Evaluación<br />
<strong>de</strong> emplazami<strong>en</strong>tos<br />
� Financiación<br />
<strong>de</strong> proyectos<br />
<strong>Gamesa</strong> es un socio con alta<br />
experi<strong>en</strong>cia <strong>en</strong> toda la ca<strong>de</strong>na <strong>de</strong><br />
valor <strong>de</strong> parques eólicos<br />
Desarrollo<br />
<strong>de</strong> proyectos<br />
Diseño <strong>de</strong><br />
aerog.<br />
�Mejora <strong>de</strong>l<br />
diseño G8x<br />
�Diseño<br />
completo<br />
G10X<br />
�Análisis <strong>de</strong><br />
carga y<br />
certificación<br />
�9<br />
plataformas,<br />
20 rotores<br />
<strong>de</strong>sarrollados,<br />
probados y<br />
operados<br />
Fabricación <strong>de</strong><br />
aerog<strong>en</strong>eradores<br />
�Integració<br />
n vertical y<br />
colaboradore<br />
s<br />
estratégicos<br />
�Diseño <strong>de</strong><br />
instalaciones<br />
<strong>de</strong> fabricación<br />
�30<br />
plantas <strong>en</strong><br />
todo el mundo<br />
Logística Obra civil<br />
�Más <strong>de</strong><br />
2.250<br />
aerog<strong>en</strong>erad<br />
ores/año<br />
transportado<br />
s<br />
�Más <strong>de</strong><br />
15.000<br />
operaciones<br />
al año<br />
�WOSS<br />
�Obra civil<br />
EPC<br />
�Subestacion<br />
es AT/MT y<br />
líneas EPC<br />
� 4,5 GW<br />
construidos<br />
o 3 mo<strong>de</strong>los <strong>de</strong> <strong>Gamesa</strong> <strong>en</strong> el top t<strong>en</strong> <strong>de</strong><br />
aerog<strong>en</strong>eradores instalados (Fu<strong>en</strong>te: Sun & Wind<br />
Energy 5/2009)<br />
o 3.600 MW <strong>de</strong> <strong>de</strong>sarrollo y construcción propios<br />
o > 18.000 MW instalados<br />
o > 12.000 MW <strong>en</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />
Instalación y<br />
puesta <strong>en</strong> marcha<br />
<strong>de</strong><br />
aerog<strong>en</strong>eradores<br />
�Más <strong>de</strong><br />
18 GW<br />
instalados<br />
�Servicios<br />
adicionales<br />
suministrados<br />
a solicitud<br />
Electrónica <strong>de</strong><br />
pot<strong>en</strong>cia <strong>de</strong><br />
parque eólico<br />
�Electrónica<br />
<strong>de</strong> pot<strong>en</strong>cia <strong>de</strong><br />
<strong>de</strong>sarrollo<br />
propio<br />
�WindFact<br />
(solución para<br />
caídas <strong>de</strong><br />
t<strong>en</strong>sión)<br />
�Filtros<br />
activos<br />
�Funciones<br />
<strong>de</strong> control<br />
avanzadas<br />
Servicios<br />
<strong>de</strong> valor<br />
añadido<br />
�Repot<strong>en</strong>ciació<br />
n<br />
�Desarrollo <strong>de</strong><br />
parques eólicos<br />
�Soluciones<br />
ante nuevos<br />
requerimi<strong>en</strong>tos<br />
<strong>de</strong> la red<br />
Servicio O&M y<br />
garantía a<br />
largo plazo<br />
�Catálogo <strong>de</strong><br />
servicios <strong>de</strong><br />
operación y<br />
mant<strong>en</strong>imi<strong>en</strong>to<br />
�>12 GW <strong>en</strong><br />
O&M<br />
�Mejora<br />
continua <strong>de</strong><br />
productos<br />
�83.000<br />
turbinas acum.<br />
40
Lí<strong>de</strong>r <strong>en</strong> el <strong>de</strong>sarrollo y v<strong>en</strong>ta <strong>de</strong><br />
parques eólicos<br />
o Cartera global <strong>de</strong> más <strong>de</strong> 22.000 MW<br />
o Lí<strong>de</strong>r internacional <strong>en</strong> la promoción <strong>de</strong><br />
parques eólicos, con actividad <strong>en</strong> 15<br />
países <strong>de</strong> 3 contin<strong>en</strong>tes<br />
o Posicionado estratégicam<strong>en</strong>te <strong>en</strong> los 3<br />
principales mercados eólicos: Europa,<br />
EE.UU. y China<br />
DESARROLLO DE PARQUES EÓLICOS<br />
MW ACUMULADOS<br />
2.123<br />
2006<br />
2.838<br />
3.161<br />
3.578<br />
2007 2008 2009<br />
41
Desarrollo <strong>de</strong> la cartera <strong>de</strong> parques<br />
21,115<br />
Cartera <strong>de</strong> 22 GW con proyectos significativos<br />
<strong>en</strong> las etapas finales <strong>de</strong> <strong>de</strong>sarrollo<br />
Cartera Probable Prácticam<strong>en</strong>te segura<br />
21,913<br />
8,907<br />
7,897<br />
700<br />
2,694<br />
2008 2009 2008 2009 2008 2009<br />
Europa EE.UU. China<br />
3,8x<br />
(MW)<br />
42
Socialm<strong>en</strong>te responsable<br />
Comprometidos con el <strong>de</strong>sarrollo sost<strong>en</strong>ible y con el medioambi<strong>en</strong>te<br />
Figuramos <strong>en</strong> los principales índices <strong>de</strong> sost<strong>en</strong>ibilidad<br />
43
Índice<br />
Realida<strong>de</strong>s <strong>de</strong>l sector <strong>de</strong> la <strong>en</strong>ergía eólica<br />
44
Tecnología madura <strong>de</strong>mandada <strong>en</strong> todo el mundo<br />
Capacidad eólica instalada <strong>en</strong> el mundo<br />
MW acumulados<br />
6.100 7.600<br />
1996<br />
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009<br />
Fu<strong>en</strong>te. GWEC<br />
23.900<br />
17.400<br />
13.600<br />
10.200 31.100<br />
47.620<br />
39.431<br />
59.091<br />
74.052<br />
93.835<br />
120.550<br />
157.899<br />
3% 2%2%<br />
3%<br />
3%<br />
23%<br />
13%<br />
7%<br />
16%<br />
12%<br />
16%<br />
India España China<br />
Alemania EEUU Italia<br />
Francia UK Portugal<br />
Dinamarca Resto mundo<br />
45
Crecimi<strong>en</strong>to progresivo y previsto<br />
Aerog<strong>en</strong>eradores instalados <strong>en</strong> el mundo<br />
GW<br />
11,5<br />
05<br />
Fu<strong>en</strong>te. GWEC<br />
15,2<br />
06<br />
+35%<br />
19,9<br />
07<br />
26,0<br />
08<br />
S<strong>en</strong>sible coyunturas adversas<br />
Comportami<strong>en</strong>to como otros<br />
sectores industriales<br />
38,3<br />
09<br />
+7%<br />
40,8<br />
10 E<br />
44,0<br />
48,1<br />
+12% p.a.<br />
54,5<br />
62,5<br />
11 E 12 E<br />
13 E 14 E<br />
46
Comportami<strong>en</strong>to previsible y or<strong>de</strong>nado<br />
La eólica, la única tecnología <strong>en</strong> España que cumple los objetivos<br />
<strong>de</strong>l Plan <strong>de</strong> Energías R<strong>en</strong>ovables 2005-2010<br />
1.415<br />
2.365<br />
3.530<br />
5.026<br />
6.169<br />
8.460<br />
10.011<br />
11.586<br />
15.104<br />
16.689<br />
19.149<br />
20.155<br />
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010<br />
Fu<strong>en</strong>te. AEE<br />
Plan <strong>de</strong> Energías<br />
R<strong>en</strong>ovables 2005-2010:<br />
20.155 MW<br />
Plan <strong>de</strong> Infraestructuras<br />
2002: 13.000 MW<br />
Plan <strong>de</strong> Fom<strong>en</strong>to <strong>de</strong> las<br />
ERs 1999: 8.974 MW<br />
47
La eólica, creadora <strong>de</strong> riqueza<br />
En 2008, el sector aportó al PIB más <strong>de</strong> 2.000 millones<br />
y empleó a 41.000 personas <strong>en</strong> 43 provincias <strong>en</strong><br />
España<br />
Fu<strong>en</strong>te. AEE<br />
1.138 M €<br />
primas<br />
2008<br />
Nuevos<br />
empleos<br />
41.000<br />
Importac.<br />
fósiles<br />
+2.205 M€<br />
PIB Indirecto<br />
(efecto arrastre)<br />
1.492 M €<br />
PIB Directo<br />
+ 2.311 M €<br />
Otros b<strong>en</strong>eficios<br />
sociales<br />
Balanza fiscal<br />
243 M€<br />
I+D+i<br />
189 M €<br />
Emisiones CO2<br />
+ 405,5 M €<br />
Exportaciones<br />
+2.900 M €<br />
48
Reducción emisiones CO 2<br />
Contribución <strong>de</strong> la eólica<br />
Emisiones CO 2 <strong>de</strong> las <strong>en</strong>ergías (1) <strong>en</strong> 2030<br />
Gt <strong>de</strong> CO 2<br />
27<br />
Emisiones 06<br />
39<br />
Previsiones 30<br />
8-15<br />
Efecto <strong>de</strong> la<br />
implantación <strong>de</strong><br />
nuevas políticas<br />
24-31<br />
Previsiones 2030<br />
1 Incluida g<strong>en</strong>eración, industria, transporte, construcción y otros sectores <strong>en</strong>ergéticos<br />
2 En previsiones <strong>de</strong> 550 Policy, las <strong>en</strong>ergías bajas <strong>de</strong> carbón se increm<strong>en</strong>tarán <strong>de</strong>s<strong>de</strong> el 19% <strong>de</strong> 2006 al 25% <strong>en</strong> 2030,<br />
incluy<strong>en</strong>do un increm<strong>en</strong>to <strong>de</strong> la capacidad <strong>de</strong> r<strong>en</strong>ovables <strong>de</strong> 440 GW<br />
Fu<strong>en</strong>te. IEA World Energy Outlook 2008<br />
-28%<br />
Los 158 GW <strong>de</strong> pot<strong>en</strong>cia<br />
instalada acumulada<br />
hasta 2009 produjeron<br />
340 TWh <strong>de</strong><br />
electricidad limpia y<br />
ahorraron<br />
204 millones <strong>de</strong><br />
toneladas <strong>de</strong> CO 2 /año<br />
49
Increm<strong>en</strong>to <strong>de</strong>manda mundial a medio plazo<br />
En países emerg<strong>en</strong>tes, principalm<strong>en</strong>te Asia<br />
Población sin acceso a electricidad: 1,5 billones <strong>en</strong> 2008 y 1,3 b. <strong>en</strong> 2030<br />
Fu<strong>en</strong>te. IEA<br />
2008<br />
2030<br />
Latinoamérica<br />
34,1<br />
12,8<br />
Norte <strong>de</strong> África<br />
1,7<br />
1,6<br />
587,1<br />
Medio Este<br />
21,4<br />
698,3<br />
5,1<br />
Africa subsahariana<br />
613,9<br />
China y Este <strong>de</strong> Asia<br />
195,1<br />
488,6<br />
72,5<br />
Asia Sur<br />
50
Desc<strong>en</strong>so coste g<strong>en</strong>eración eólica<br />
Curva <strong>de</strong> apr<strong>en</strong>dizaje <strong>de</strong> soluciones tecnológicas<br />
Coste in<strong>de</strong>xado para la <strong>en</strong>ergía eólica (coste por kWh) 2005 = índice 100<br />
Aprovechami<strong>en</strong>to <strong>de</strong> escalas<br />
Desarrollo tecnológico<br />
933<br />
1986<br />
Fu<strong>en</strong>te. NREL y BTM<br />
-44%<br />
522<br />
1992<br />
-32%<br />
M<strong>en</strong>ores márg<strong>en</strong>es <strong>de</strong> error e<br />
introducción <strong>de</strong> métodos <strong>de</strong> mejora<br />
Desarrollo tecnológico. Etapas más<br />
cortas para lanzam<strong>en</strong>to <strong>de</strong> producto<br />
354<br />
1996<br />
-37%<br />
224<br />
1999<br />
-33%<br />
149<br />
2002<br />
M<strong>en</strong>ores increm<strong>en</strong>tos <strong>de</strong> coste <strong>de</strong> producción<br />
y b<strong>en</strong>eficios <strong>de</strong> escala<br />
Reducción costes <strong>de</strong> mant<strong>en</strong>imi<strong>en</strong>to<br />
Desarrollo tecnológico. Reducción <strong>de</strong>l peso.<br />
Estrategias <strong>de</strong> operación y control<br />
-33%<br />
100<br />
2005<br />
-15%<br />
85<br />
2009<br />
51
Muchas gracias<br />
Moitas grazas