Wichtige Voraussetzungen für die erfolgreiche Montage - Closomat
Wichtige Voraussetzungen für die erfolgreiche Montage - Closomat
Wichtige Voraussetzungen für die erfolgreiche Montage - Closomat
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Dear sanitation plumber and partner,<br />
You have a CLOSOMAT PALMAVita, the genuine douche-WC, to install. Our customer expects a great<br />
deal from this high-class product, which left our works after stringent testing. As manufacturers, we shall<br />
appreciate your careful workmanship so that the customer can accept the equipment in perfect condition.<br />
If you proceed according to these instructions, you will install the CLOSOMAT quickly and without problems.<br />
Please ensure that it is installed only by skilled persons adequately familiar with sanitation or in particular with<br />
CLOSOMAT. They should also understand one of the three languages in which these instructions are given.<br />
The appropriate technical service for your country will be pleased to answer any questions (see on reverse<br />
side).<br />
Important requirements for successful installation<br />
Vital information lead<br />
Read these instructions through completely before starting work, so that you grasp the interrelations and can<br />
then take the job in your stride.<br />
Don’t install too soon<br />
Install the CLOSOMAT only when all other people (plasterers, painters, tile layers, etc.) have finished.<br />
This will avoid damage such as scratching, besides misuse of the CLOSOMAT as a sink or site toilet.<br />
Check the delivery<br />
Check with the data on the label and packing whether the model, colour and version correspond to the order.<br />
Check connections<br />
• Electrical connection<br />
– Check whether voltage is present and the circuit has an earth-leakage circuit braker.<br />
– Check whether the safety distances (protection zones) from the other sanitation equipment conform to<br />
the regulations in force.<br />
• Water connection (cold water only needed)<br />
Check whether the mains can deliver at least 7 litres per minute and the continuous static pressure is<br />
0.8 MPa (8 bar) max.<br />
25