<strong>Installation</strong><br />
Utility Connections<br />
GAS CONNECTIONS<br />
Connect the oven to the gas line with the proper<br />
type of gas according to Local and National <strong>Installation</strong><br />
Standards.<br />
Setting Equipment for Other Types of Gas<br />
1. Shut off the gas valve and turn off the operating<br />
switch.<br />
2. Dismantle the gas block by means of couplings.<br />
3. Dismantle the main burner and replace the injector.<br />
4. Replace pilot injector.<br />
5. Install the burner and gas block.<br />
6. Check for leakage and possible loose electrical<br />
connections.<br />
7. Adjust gas pressure if necessary, See<br />
Figure 20.<br />
Type of<br />
Gas<br />
Inlet<br />
Pressure<br />
mbars<br />
Burner<br />
Pressure<br />
mbars<br />
8<br />
Injector<br />
Diameter<br />
mm<br />
Gas Pressure<br />
Adjustment<br />
Air<br />
Opening<br />
mm<br />
Figure 20<br />
Pilot<br />
Injector<br />
mm<br />
Pressure<br />
Tap<br />
Standard<br />
Delivery<br />
Value kW (H S)<br />
G25 25 12 5,80 16 2 x 0,63 46 Nat. Gas<br />
G20 20 8 5,80 16 2 x 0,63 46 Nat. Gas<br />
G20/G25 20/25 Totally Inscrewed<br />
Pressure Regulator<br />
5,15 16 2 x 0,63 46 Nat. Gas<br />
G30 30/50 17 3,48 16 2 x 0,30 46 Butane<br />
G31 30/37/50 24 3,48 16 2 x 0,30 46 Propane