USP PROJECT - TIME 3<br />

PROJEK PPS - TIME 3<br />

ENHANCING POPULATION COVERAGE<br />

OF PUBLIC CELLULAR SERVICE<br />

(TIME 3)<br />

Time 3 Programme<br />

In 2009, under the direction of Government to<br />

further expand cellular coverage nationwide, a new<br />

programme known as Time 3 was implemented. The<br />

objective of this program is to increase the national<br />

cellular coverage to 97% population by 2011.<br />

The Time 3 programme is targeted at extreme rural<br />

areas and villages with the population density of<br />

below 80 persons per square kilometers. Key target<br />

areas include FELDA, FELCRA, plantations, Orang Asli<br />

settlements, new tourist spots and significant federal<br />

highway areas.<br />

Time 3 implementation consists of the provision of<br />

communication towers for the purpose of Infra Sharing<br />

(IS) and Domestic Roaming (DR) for cellular services.<br />

Hence in principle, there are cost savings for the<br />

service providers, lesse difficulties in acquiring sites,<br />

and avoid high local authority fee, whilst ensuring<br />

smooth operation of the project.<br />

MEMPERTINGKATKAN LIPUTAN<br />

POPULASI PERKHIDMATAN TELEFONI<br />

BERSEL AWAM (TIME 3)<br />

Program Time 3<br />

Pada 2009, atas arahan Kerajaan untuk memperluaskan<br />

lagi liputan telefoni bersel awam di seluruh negara,<br />

satu program baru yang dikenali sebagai Time 3 telah<br />

dilaksanakan. Matlamat program ini adalah untuk<br />

meningkatkan liputan selular telefoni bersel awam<br />

nasional kepada 97% populasi menjelang 2011.<br />

Program Time 3 disasarkan kepada kawasan-kawasan<br />

luar bandar dan kampung-kampung yang sangat<br />

terpencil dengan kepadatan penduduk di bawah 80<br />

orang bagi setiap kilometer persegi. Kawasan-kawasan<br />

sasaran utama termasuklah FELDA, FELCRA, ladangladang,<br />

penempatan Orang Asli, kawasan-kawasan<br />

tarikan pelancong baru dan lebuhraya-lebuhraya<br />

persekutuan yang utama.<br />

Pelaksanaan Time 3 terdiri daripada penyediaan menaramenara<br />

komunikasi bagi tujuan Perkongsian Infra dan<br />

Perayauan Domestik untuk penyediaan perkhidmatan<br />

telefoni bersel awam. Maka secara dasarnya, terdapat<br />

penjimatan kos bagi pemberi- pemberi perkhidmatan;<br />

mengurangkan kesukaran mendapatkan tapak dan<br />

menyelesaikan yuran pihak berkuasa yang tinggi, dan<br />

pada masa yang sama, memastikan operasi projek<br />

berjalan dengan lancar.<br />

Time 3 Implementation Plan<br />

Time 3 Programme is implemented through the<br />

concept of Private-Public Partnership whereby the cost<br />

for the project is shared between the cellular service<br />

providers and the <strong>Commission</strong>.<br />

MCMC, through the USP Fund will fund a total of 1000<br />

sites which are located across 155 USP areas in the<br />

following phases:<br />

1. Phase 1 – the erection of towers and<br />

provision of cellular service at 127 sites<br />

located within the FELDA areas beginning<br />

from June to December 2009; and<br />

2. Phase 2 – the erection of towers and<br />

provision of cellular service at 873 sites in<br />

the extreme remote areas nationwide<br />

Pelan Pelaksanaan Time 3<br />

Program Time 3 dilaksanakan menerusi konsep<br />

Perkongsian Awam-Swasta di mana kos projek dikongsi<br />

antara pemberi perkhidmatan telefoni bersel awam<br />

dan Suruhanjaya.<br />

SKMM, menerusi Kumpulan Wang PPS akan membiayai<br />

sejumlah 1,000 tapak yang terletak di 155 kawasan<br />

PPS dalam fasa-fasa berikut:<br />

1. Fasa 1 – pembinaan menara-menara dan<br />

penyediaan perkhidmatan telefoni bersel<br />

awam di 127 tapak yang terletak dalam<br />

lingkungan kawasan-kawasan FELDA bermula<br />

dari Jun hingga Disember 2009; dan<br />

2. Fasa 2 – pembinaan menara-menara dan<br />

penyediaan perkhidmatan telefoni bersel<br />

36<br />

Laporan Tahunan PPS 2009