USP PROJECT - TIME 3<br />
PROJEK PPS - TIME 3<br />
Table 2: Progress by Cluster<br />
Jadual 2: Kemajuan mengikut Kelompok<br />
Cluster No/State<br />
Bil. z/Negeri<br />
No. of Sites<br />
Jumlah<br />
Tapak<br />
Part 1<br />
Bahagian 1<br />
Licensee<br />
Pemegang Lesen<br />
Part 2<br />
Bahagian 2<br />
Licensee<br />
Pemegang Lesen<br />
1 - Johor 13 Celcom Maxis<br />
2 - Kelantan 21 Celcom Maxis<br />
3 - N. Sembilan 12 Rangkaian Minang Maxis<br />
4 - Pahang 23 Touch Matrix Maxis<br />
5 - Pahang 16 Touch Matrix DiGi<br />
6 - Pahang 11 Touch Matrix Maxis<br />
7 - Perak 11 Wellcom Maxis<br />
8 - Perak 10 Asiaspace Maxis<br />
9 - Terengganu 10 Desabina DiGi<br />
As of 31 December 2009, 124 towers have been<br />
succesfully erected with pending 3 towers expected to<br />
be completed by January 2010. The provision of celluar<br />
service has been made available at 41 sites whilst the<br />
remaining sites will be put on-air in stages by January<br />
2010. Details of the progress as shown below:<br />
3<br />
Overall Progress<br />
Setakat 31 Disember 2009, 124 menara telah berjaya<br />
didirikan dan baki 3 menara dijangka siap menjelang<br />
Januari 2010. Perkhidmatan telefoni bersel awam<br />
telah disediakan di 41 tapak sementara baki tapak<br />
menara tersebut akan dilaksanakan secara berperingkat<br />
menjelang Januari 2010. Butiran mengenai kemajuan<br />
pelaksanaannya adalah seperti berikut:<br />
Kemajuan Keseluruhan<br />
3<br />
124<br />
86<br />
124<br />
86<br />
41<br />
41<br />
Part 1 - Tower<br />
Part 2 - BTS<br />
Completed<br />
Work in Progress - Target completion<br />
31 Dec 2009<br />
Bahagian 1<br />
– Menara<br />
Bahagian 2<br />
– BTS<br />
Siap<br />
Dalam pelaksanaan – Dijangka siap<br />
pada 31 Dis 2009<br />
38<br />