27.09.2014 Views

PENGURUSAN LEAN –”WHAT'S NEXT AFTER 5S?” - MPC

PENGURUSAN LEAN –”WHAT'S NEXT AFTER 5S?” - MPC

PENGURUSAN LEAN –”WHAT'S NEXT AFTER 5S?” - MPC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PENGURUSAN</strong> <strong>LEAN</strong> –”WHAT’S <strong>NEXT</strong><br />

<strong>AFTER</strong> <strong>5S</strong>?”<br />

Nik Mustafa Raja Salleh<br />

Pengarah<br />

Jabatan Inovasi Enterpris (EI)<br />

24 April 2013


KANDUNGAN<br />

1. Pengenalan Kepada <strong>MPC</strong><br />

2. Aktiviti <strong>5S</strong> <strong>MPC</strong><br />

- Prinsip & Aplikasi PDCA<br />

- ‘<strong>5S</strong> Road Map’<br />

3. Mengapa ‘Lean’ ?<br />

- Prinsip ‘Lean’<br />

- Jenis-jenis ‘Lean’<br />

4. Aktiviti-aktiviti ‘Lean’ <strong>MPC</strong>


VISI<br />

Organisasi peneraju dalam<br />

meningkatkan produktiviti untuk<br />

daya saing global dan inovasi.<br />

The leading organisation in productivity<br />

enhancement for global competitiveness and<br />

innovation


MIsI<br />

Memberi perkhidmatan yang berimpak<br />

tinggi dalam usaha mencapai<br />

kecemerlangan prestasi melalui inovasi<br />

untuk memperbaiki taraf hidup.<br />

To deliver high impact services towards achieving<br />

performance excellence through innovation for the betterment<br />

of life


Impak Ke Arah Peningkatan Pantas<br />

Produktiviti dan daya Saing<br />

Daya Saing &<br />

Produktiviti<br />

Impak Tinggi terhadap<br />

Produktiviti dan Daya<br />

Saing<br />

Penyelidikan &<br />

Pembangunan<br />

Sistem<br />

1990<br />

Pengurusan<br />

Latihan dan Khidmat<br />

Nasihat<br />

1960<br />

Productiviti &<br />

Peningkatan<br />

Kecekapan<br />

1995<br />

Penandaarasan &<br />

Amalan Terbaik<br />

2000<br />

Pertumbuhan<br />

Produktiviti<br />

of 4.6%<br />

2005 2010<br />

2010 - 2015<br />

6.5%<br />

Pertumbuhan<br />

KDNK<br />

12.8% Pertumbuhan<br />

Pelaboran Swasta


HALA TUJU<br />

1. Inovasi Enterpris (EI)<br />

• Meningkatkan kapasiti inovasi<br />

syarikat dengan mewujud dan<br />

melaksanakan ekosistem yang<br />

memberi penekanan terhadap<br />

keseluruhan rantaian nilai<br />

inovasi.<br />

4. Daya Saing Global (GC)<br />

• Membangunkan pengetahuan makro ekonomi di<br />

peringkat nasional dan global berasaskan daya<br />

saing Malaysia.<br />

• Memperluaskan fokus kepada kajian<br />

penandaarasaan di peringkat negeri serta<br />

membantu dalam penandaarasan antarabangsa<br />

bagi semakan peraturan.<br />

1<br />

RMK10<br />

GTP<br />

ETP<br />

. Pengurusan Pengetahuan (KM)<br />

• Mewujudkan pangkalan pengurusan<br />

pengetahuan serta menyediakan laporan<br />

dan maklumat berkaitan produktiviti,<br />

inovasi dan kualiti.<br />

. Kecemerlangan Perniagaan (BE)<br />

• Menilai dan mengiktiraf amalan pengurusan<br />

cemerlang syarikat dan memaparkan syarikat<br />

contoh sebagai pencetus daya saing melalui<br />

perkongsian terbaik.<br />

• Menetapkan dan menambahbaikkan<br />

standard/piawaian inovasi melalui rangka<br />

“health check”.<br />

5. Semakan Peraturan (RR)<br />

Memantau, mengkaji semula, menilai<br />

dan menyediakan cadangan untuk<br />

menambahbaik polisi dan peraturan<br />

sedia ada serta peraturan baru<br />

untuk meningkatkan produktiviti dan<br />

inovasi.<br />

• Membantu jawatankuasa sedia<br />

ada bagi memudahkan urusan<br />

perniagaan<br />

2<br />

4<br />

3<br />

5<br />

Pemacu<br />

Produktiviti &<br />

Inovasi Berimpak<br />

Tinggi


INOVASI ENTERPRIS (EI)<br />

PEMBANGUNAN BUDAYA<br />

INOVASI<br />

• KONVENSYEN<br />

• SEMINAR PROMOSI DAN<br />

PERKONGSIAN<br />

• PROGRAM PERUBAHAN MINDA<br />

SISTEM INOVASI ENTERPRIS<br />

• SISTEM <strong>PENGURUSAN</strong> INOVASI<br />

• SISTEM PENGUKURAN PRESTASI<br />

• SISTEM <strong>PENGURUSAN</strong> KUALITI<br />

• SISTEM PENAMBAHBAIKAN<br />

PROSES<br />

BUDAYA<br />

(Culture)<br />

KEUPAYAAN<br />

(capacity)<br />

RAKAN KONGSI INOVASI<br />

PROGRAM PENINGKATAN<br />

PRODUKTIVITI DAN INOVASI<br />

• PROGRAM KOLABORASI<br />

• PROGRAM NETWORKING<br />

Connectivity<br />

KEBOLEHAN<br />

(Capability)<br />

• KECEKAPAN PROSES<br />

• KUALITI MENINGKATKAN<br />

INOVASI<br />

• KREATIVITI DAN INOVASI<br />

• KECERMELANGAN<br />

PRESTASI<br />

TRANSFORMATION INNOVATION PARTNERSHIP<br />

7


MODEL PEMBANGUNAN PELAKSANAAN SISTEM<br />

PERSEKITARAN BERKUALITI (<strong>5S</strong>)<br />

Transformation . Innovation . Partnership<br />

8


Faktor Kejayaan Pelaksanaan <strong>5S</strong><br />

• Kepimpinan<br />

• Penyertaan dari Semua Peringkat<br />

• Kaedah pengurusan melalui sistem QE/<strong>5S</strong><br />

• Penambahbaikan Berterusan<br />

• Keputusan dibuat berlandaskan fakta<br />

Asas <strong>5S</strong>: Pengurusan Visual –Kebersihan ,<br />

Kreatif & Keselamatan<br />

Transformation . Innovation . Partnership


PNGURUSAN <strong>5S</strong> MENGIKUT APLIKASI PDCA<br />

Kaedah ”Plan - Do – Check – Act” (PDCA) boleh diaplikasikan<br />

kepada semua aktiviti persekitaran berkualiti.<br />

Secara ringkasnya PDCA boleh ditakrifkan sebagai:<br />

Plan (Rancang)<br />

Do (Laksana)<br />

Check (Periksa &<br />

Nilai)<br />

Act (Tindakan)<br />

• Mewujudkan polisi,<br />

objektif, sumber<br />

dan aktiviti<br />

persekitaran<br />

berkualiti selaras<br />

dengan keperluan<br />

standard/piawaian<br />

serta keperluan<br />

organisasi<br />

• Melaksanakan aktiviti<br />

seperti yang dirancang.<br />

• Memeriksa dan<br />

menilai<br />

keberkesanan<br />

aktiviti dengan<br />

mengambil kira<br />

pencapaian<br />

perancangan dan<br />

keperluan<br />

standard/piawaian.<br />

• Mengambil tindakan<br />

berterusan bagi<br />

menambahbaik<br />

prestasi aktiviti<br />

persekitaran<br />

berkualiti.<br />

Transformation . Innovation . Partnership<br />

10


BILANGAN ORGANISASI YANG TELAH DIPERSIJILKAN<br />

- Mengikut sektor<br />

SEKTOR JUMLAH %<br />

1. AWAM<br />

1. SWASTA –<br />

a) Multinational (MNC)<br />

b) Syarikat GLC<br />

c) Perkhidmatan<br />

d) SME<br />

835 59<br />

23<br />

135<br />

313<br />

109<br />

1.6<br />

9.5<br />

22<br />

7.7<br />

JUMLAH KESELURUHAN YANG TELAH<br />

DIPERSIJILKAN DARI TAHUN 2000 - 2012<br />

1415 100<br />

Bilangan sektor yang<br />

terbanyak adalah di<br />

Sektor Awam<br />

Transformation . Innovation . Partnership


BILANGAN ORGANISASI YANG TELAH DIPERSIJILKAN MENGIKUT NEGERI PADA<br />

TAHUN 2000 - 2012<br />

Bil Negeri Bil. Organisasi<br />

1 Johor 98<br />

2 Kedah 74<br />

3 Kelantan 79<br />

4 Kuala Lumpur 95<br />

5 Terengganu 62<br />

6 Melaka 66<br />

7 Negeri<br />

Sembilan<br />

71<br />

8 Pulau Pinang 70<br />

9 Pahang 126<br />

10 Perak 109<br />

11 Perlis 19<br />

12 Selangor 252<br />

13 Sabah 93<br />

14 Sarawak 201<br />

Jumlah 1415<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

Johor Kedah Kelantan Kuala Lumpur Ter engganu Melaka Neger i Sembilan Pulau Pinang Pahang Per ak Per lis Selangor Sabah Sar awak<br />

Bilangan negeri yang tertinggi<br />

adalah di Selangor dan Sarawak<br />

Transformation . Innovation . Partnership


Jenis-Jenis Lean….<br />

Lean<br />

Manufacturing<br />

Refer to<br />

Lean Tools<br />

Type<br />

of<br />

Lean<br />

Lean Service<br />

Lean<br />

Government<br />

• VSM<br />

• Poke-Yoke<br />

• TPM<br />

• Kanban<br />

• <strong>5S</strong><br />

• SMED<br />

• Transformasi<br />

• Kreativiti<br />

• Inovasi<br />

• Pembaziran<br />

• Matlamat<br />

Organisasi<br />

Perlaksanaan<br />

Berterusan &<br />

Impak


Mengapa Perlu<br />

‘Berhijrah’<br />

dari <strong>5S</strong><br />

ke ‘<strong>LEAN</strong>’?


Perkara<br />

Sisih (Seiri)<br />

‘DELIVERABLES <strong>LEAN</strong>’ – <strong>5S</strong><br />

(Hubungkait <strong>5S</strong> – ‘Lean’)<br />

Mengurangkan Pembaziran/ Kawasan<br />

Dioptimumkan<br />

• Keluasan tempat kerja bertambah<br />

(Pembaziran dibuang)<br />

• Kecacatan kualiti dikurangkan (bila<br />

sesuatu yang tidak perlu di ubah/<br />

buang)<br />

• Alat ganti/ stok sentiasa bersedia<br />

untuk pengeluaran<br />

• Penjimatan masa (tidak perlu untuk<br />

memperbetulkan kesilapan)<br />

Pencapaian Objektif<br />

‘Lean’<br />

• Ruang yang lebih<br />

untuk kerja-kerja yang<br />

produktif<br />

• Peningkatan kualiti<br />

dengan kos<br />

berkurangan<br />

• Kurangkan ‘cycle time’<br />

dan ‘lead time’<br />

• % tinggi dalam masa<br />

penghantaran


‘DELIVERABLES’ <strong>LEAN</strong> – <strong>5S</strong><br />

(Hubungan <strong>5S</strong> – Lean)<br />

Perkara<br />

Mengurangkan Pembaziran/Kawasan<br />

Dioptimumkan<br />

Pencapaian Objektif<br />

‘Lean’<br />

Susun (Seiton)<br />

•Mengurangkan Peralatan yang<br />

hilang<br />

• Penggunaan Peralatan yang tepat<br />

sepanjang masa<br />

• Tempat kerja selesa<br />

• % tinggi dalam masa<br />

penghantaran<br />

• Keselamatan yang<br />

lebih baikmengurangkan<br />

kadar<br />

kemalangan<br />

• tempat kerja yang<br />

yang kondusif<br />

• mengurangkan ‘lead<br />

time’.


‘DELIVERABLES’ <strong>LEAN</strong> – <strong>5S</strong><br />

(Hubungkait <strong>5S</strong> – Lean)<br />

Perkara<br />

Mengurangkan Pembaziran/Kawasan<br />

Dioptimumkan<br />

Pencapaian Objektif<br />

‘Lean’<br />

Sapu (Seiso) • Masa senggaraan yang minimum • lebih masa untuk<br />

melaksanakan operasi<br />

• Tidak perlu mengadakan ‘big<br />

cleaning operation’.<br />

• Membantu dalam<br />

Tindakan pencegahan.<br />

• Mengurangkan<br />

kerosakan


‘DELIVERABLES <strong>LEAN</strong>’ – <strong>5S</strong><br />

(Hubungan <strong>5S</strong> – ‘Lean’)<br />

Perkara<br />

Mengurangkan<br />

Pembaziran/Kawasan<br />

Dioptimumkan<br />

Pencapaian Objektif<br />

‘Lean’<br />

Standardized<br />

(Seiketsu)<br />

•Setiap warga dengan tujuan yang<br />

sama<br />

• Memudahkan organisasi<br />

melakukan perubahan<br />

• Cara kerja yang standard<br />

• Kerjasama<br />

berpasukan lebih<br />

mudah<br />

• tidak perlu mesin/<br />

peralatan yang<br />

berbagai untuk kerjakerja<br />

serupa<br />

• ‘consistency in<br />

quality’.


‘DELIVERABLES’ <strong>LEAN</strong> – <strong>5S</strong><br />

(Hubungan <strong>5S</strong> – Lean)<br />

Perkara<br />

Mengurangkan<br />

Pembaziran/Kawasan<br />

Dioptimumkan<br />

Pencapaian Objektif<br />

‘Lean’<br />

Sentiasa amal<br />

(Shitsuke)<br />

• Pekerja berdisiplin<br />

• Semangat 1 Organisasi<br />

• Operasi yang seragam untuk<br />

sesuatu aktiviti<br />

• Kerjasama Berpasukan<br />

dalam organisasi<br />

• ‘Departmentalized<br />

thinking will be<br />

removed’<br />

• Kualiti yang lebih baik<br />

dibina dalam sesuatu<br />

sistem


APA ITU ‘<strong>LEAN</strong>’?<br />

Lean merujuk kepada koleksi prinsipprinsip<br />

dan kaedah-kaedah yang<br />

memberi tumpuan kepada<br />

mengenalpasti dan menghapuskan<br />

aktiviti yang tidak memberi nilai<br />

tambah (Pembaziran Kerja) kepada<br />

pelanggan dalam mana-mana proses<br />

James Womack, Daniel Jones, and Daniel Roos coined the term “lean” in their 1990 book The<br />

Machine that Changed the World to describe the manufacturing paradigm (often referred to<br />

as the Toyota Production System) developed by the Toyota Motor Company based on<br />

principles pioneered by Henry Ford.<br />

20


Lean Thinking: 3M<br />

Lean consist set of 'tools' that assist<br />

in the identification and elimination<br />

of:<br />

• waste (MUDA),<br />

• unevenness (MURA) and<br />

• overburden (MURI)<br />

Lean<br />

Transformation


Value Stream Mapping<br />

Lean Thinking: 3M (con’t)


1. Identify Customers and<br />

Specify Value<br />

5 Principles of Lean Thinking<br />

2. Identify and Map the Value<br />

Stream<br />

3. Create Flow by Eliminating<br />

Waste<br />

4. Respond to Customer Pull<br />

5. Pursue Perfection<br />

Value Stream Mapping


‘Famous’ 7+1 jenis Pembaziran (Muda)<br />

Value Stream Mapping<br />

25


Bagaimanakah <strong>MPC</strong><br />

boleh membantu<br />

organisasi anda ke<br />

arah perlaksanaan<br />

<strong>LEAN</strong>?


PRODUCTIVITY & QUALITY IMPROVEMENT STRUCTURE


<strong>MPC</strong> <strong>LEAN</strong>- QE HIGH IMPACT ROAD MAP<br />

<strong>5S</strong><br />

Technique / Practices used<br />

to Establish and Maintain<br />

Quality Environment<br />

in Organization<br />

<strong>5S</strong> + KAIZEN<br />

Continuous Improvement<br />

of the Technique/<br />

Practices used<br />

in Existing <strong>5S</strong> System<br />

<strong>5S</strong> + KAIZEN +<br />

<strong>LEAN</strong> MANAGEMENT<br />

Specific Continuous<br />

Improvement<br />

of the Technique/<br />

Practices used<br />

in Existing <strong>5S</strong> System<br />

Especially in Quality and<br />

Product Delivery<br />

Clean and conducive<br />

work place.<br />

Proper storage and<br />

management of<br />

documentation.<br />

Well maintained tools<br />

& equipments.<br />

Developing responsible<br />

and accountable<br />

attitude.<br />

Save cost and more saving.<br />

Practice correct working<br />

culture.<br />

Improve work productivity<br />

and products quality.<br />

Customer happiness.<br />

Increase profitability.<br />

Well developed an excellent<br />

culture/ which conform to<br />

International Culture.<br />

More facilities and rewards<br />

to staff.<br />

Solid customer confidence &<br />

trust/more order.<br />

Respectable organization.<br />

DEVELOPMENT CULTURE HIGH IMPACT<br />

1 st Year 2 nd Year 3 rd Year & Above


AKTIVITI-AKTIVITI<br />

<strong>LEAN</strong><br />

DI <strong>MPC</strong><br />

(2013)


1. WPT sebagai CoE Pengurusan ‘Lean’<br />

2. Mewujudkan ‘Lean Database’<br />

3. Misi Pembelajaran Antarabangsa (Study<br />

Mission)<br />

4. ‘Lean Hands-on Workshop’<br />

5. Program Peningkatan Produktiviti & Inovasi<br />

6. Projek Pembangunan Sistem dan ‘Road Map<br />

to Lean Journey’<br />

7. Pengiktirafan ‘Lean’<br />

8. Portal ‘Lean’


(1) <strong>MPC</strong> WILAYAH PANTAI TIMUR<br />

PUSAT KECEMERLANGAN (COE) <strong>PENGURUSAN</strong> ‘<strong>LEAN</strong>’<br />

November 2011<br />

<strong>MPC</strong> Wilayah Pantai Timur (WPT) dinobatkan sebagai<br />

“Pusat Kecemerlangan (COE) Pengurusan Lean”<br />

<strong>MPC</strong> WPT telah mengambil inisiatif dengan mewujudkan aktivitiaktiviti<br />

bagi merealisasikan CoE Pengurusan Lean, antaranya :<br />

1. MoU<br />

2. Round Table Discussion (RTD)<br />

3. Seminar<br />

4. Latihan dan Pembangunan Sistem<br />

Transformation.Innovation.Partnership<br />

3<br />

1


MoU PROGRAM JALINAN INDUSTRI <strong>PENGURUSAN</strong> <strong>LEAN</strong><br />

<strong>MPC</strong> WILAYAH PANTAI TIMUR<br />

1<br />

2<br />

3<br />

4<br />

5<br />

Transformation.Innovation.Partnership<br />

3<br />

2


RTD <strong>PENGURUSAN</strong> <strong>LEAN</strong><br />

<strong>MPC</strong> WILAYAH PANTAI TIMUR<br />

1 3<br />

2<br />

Transformation.Innovation.Partnership<br />

33


SEMINAR <strong>PENGURUSAN</strong> <strong>LEAN</strong><br />

<strong>MPC</strong> WILAYAH PANTAI TIMUR<br />

1<br />

2<br />

3<br />

Transformation.Innovation.Partnership<br />

34


PROJEK PEMBANGUNAN SISTEM<br />

<strong>PENGURUSAN</strong> <strong>LEAN</strong> <strong>MPC</strong> WPT<br />

Projek Pembangunan Sistem Pengurusan Lean<br />

merupakan salah satu aktiviti utama Pusat Kecemerlangan Lean.<br />

Aktiviti ini merupakan gabungan:<br />

• Taklimat Untuk Pengurusan<br />

• Latihan dan Khidmat Rundingan (Kaizen Event)<br />

Projek perundingan mengambil masa sekurang-kurangnya 6 bulan.<br />

Perunding Lean <strong>MPC</strong> akan memberi latihan yang melibatkan<br />

Value Stream Mapping (VSM), Lean Toolkit, Kaizen, Matrik Lean dll.<br />

Khidmat Rundingan (Kaizen Event)<br />

• Merupakan fasa semakan oleh perunding <strong>MPC</strong> terhadap projek lean<br />

• Antara semakan yang dibuat : VSM Future State, Kaizen Blitz serta idea<br />

penambahbaikan untuk menghapuskan pembaziran pada aktiviti utama projek<br />

• Laporan status projek akan disediakan oleh perunding untuk rujukan dan semakan<br />

pihak pengurusan


PROJEK PEMBANGUNAN SISTEM<br />

<strong>PENGURUSAN</strong> <strong>LEAN</strong> <strong>MPC</strong> WPT<br />

Projek perundingan Pengurusan Lean mengambil masa sekurang-kurangnya 6 bulan.<br />

Perunding Lean <strong>MPC</strong> akan memberi latihan yang melibatkan :<br />

• Value Stream Mapping (VSM)<br />

• Lean Toolkit<br />

• Kaizen<br />

• Matrik Lean dan lain-lain.<br />

Projek Pembangunan Sistem Pengurusan Lean Negeri Pahang:<br />

• 2010 : Kuantan Specialist Hospital<br />

• April 2011 : Perbadanan Kemajuan Negeri Pahang (PKNP)<br />

• Julai 2012 : Global Factor Sdn Bhd<br />

• Januari 2013 : Pejabat Daerah dan Tanah Kuantan<br />

• Februari 2013 : UiTM Pahang<br />

• Februari 2013 : Majlis Perbandaran Kuantan (MPK)<br />

Transformation.Innovation.Partnership<br />

36


1<br />

Pasukan: Inovatif<br />

Projek: Pengurusan<br />

Harta Sewa<br />

2<br />

Pasukan: Kreatif<br />

Projek: Pengurusan Latihan<br />

dan Keusahawanan<br />

3<br />

Pasukan: Agresif<br />

Projek: Pelaksanaan<br />

Projek PPD<br />

4<br />

Pasukan: Informatif<br />

Projek: Penyelenggaraan<br />

Sistem<br />

5 6<br />

7<br />

Pasukan: Progresif<br />

Projek: Pengurusan Lombong<br />

Pasukan: Produktif<br />

Projek: Jualan Tanah<br />

Industri<br />

Pasukan: Produktif<br />

Projek: Permohonan Tanah<br />

8<br />

Pasukan: Eksklusif<br />

Projek: Pengurusan<br />

Penerbitan<br />

9<br />

Pasukan : Impresif<br />

Projek:Pengurusan<br />

Latihan<br />

10<br />

Pasukan: Kondusif<br />

Projek: Urusan Jualan<br />

PROJEK PEMBANGUNAN SISTEM <strong>PENGURUSAN</strong> <strong>LEAN</strong> <strong>MPC</strong> WILAYAH PANTAI TIMUR<br />

PERBADANAN KEMAJUAN NEGERI PAHANG (PKNP)<br />

APRIL 2011 – NOVEMBER 2011


PROJEK PEMBANGUNAN SISTEM<br />

<strong>PENGURUSAN</strong> <strong>LEAN</strong> <strong>MPC</strong> WPT<br />

2<br />

1<br />

3


(2) <strong>LEAN</strong><br />

DATABASE


(3) MISI PEMBELAJARAN<br />

ANTARABANGSA (STUDY MISSION)<br />

Bil Tempat Tarikh Kerjasama Koordinator Email<br />

1<br />

Singapura<br />

10 -14 Jun<br />

Singapore Productivity<br />

Association<br />

Cham Yin<br />

Hwa<br />

cham@mpc.gov.my<br />

2<br />

Indonesia 24-28 Jun Lean Applied<br />

Norhashimah<br />

Ibrahim<br />

norhasimah@mpc.gov.my<br />

3<br />

Jepun 1 17-24 Jun Hirayama Consulting Mohd Hilmi hilmi@mpc.gov.my<br />

4<br />

Australia<br />

12-17 Ogos<br />

Lean Academy<br />

(Australia)<br />

Noor Mohd<br />

Farhan<br />

mfarhan@mpc.gov.my<br />

5<br />

Jepun 2<br />

1-8<br />

Disember<br />

Hirayama Consulting<br />

Muhammad<br />

Suffian<br />

suffian@mpc.gov.my


(4) <strong>LEAN</strong> HANDS-ON WORKSHOP<br />

Bil Sektor Organisasi Tarikh Tempat Koordinator Email<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Perkhidmatan@ Perkilangan 8 Mei Pulau Pinang Josffa Ismail josffa@mpc.gov.my<br />

Perkilangan 28 Mei Petaling Jaya Muhammad<br />

Suffian<br />

suffian@mpc.gov.my<br />

Perkilangan 22 Mei Johor Zul Ezwan zulezwan@mpc.gov.my<br />

Perkhidmatan 12 Jun Kuantan Azhani azhani@mpc.gov.my<br />

Perkhidmatan@ Perkilangan 26 Jun Sarawak Edward Binty Edward@mpc.gov.my<br />

Perkhidmatan 3 Julai Petaling Jaya Muhammad<br />

Suffian<br />

suffian@mpc.gov.my<br />

Perkhidmatan@ Perkilangan 28 Ogos Pulau Pinang Josffa Ismail josffa@mpc.gov.my<br />

Perkhidmatan@ Perkilangan 11 Sept Johor Zul Ezwan zulezwan@mpc.gov.my<br />

9<br />

Perkhidmatan@ Perkilangan 25 Sept Petaling Jaya Muhammad<br />

Suffian<br />

suffian@mpc.gov.my


(5) PROGRAM PENINGKATAN<br />

PRODUKTIVITI & INOVASI<br />

Bil Kursus Tarikh Tempat Koordinator Email<br />

1. Value Stream Mapping 25 – 25 April Petaling Jaya Ab. Malek malek@mpc.gov.my<br />

2. Visual Factory & Operation Management 21 – 22 Mei Petaling Jaya Nur Syafina syafina@mpc.gov.my<br />

3. Sustaining Kaizen Culture 4 – 5 Jun Sabah Edward Binty edward@mpc.gov.my<br />

4. Standardised Work 11 – 12 Jun Petaling Jaya Asmawadi asmawadi@mpc.gov.my<br />

5. Business Process Reengineering 19 – 20 Jun Petaling Jaya Jayaletchumi jayaletchumi@mpc.gov.my<br />

6. Lean Production System 24 -25 Jun Petaling Jaya Mohd Hilmi hilmi@mpc.gov.my<br />

7. Failure Mode and Effect Analysis 2 – 3 Julai Petaling Jaya NoorSalfarina salfarina@mpc.gov.my<br />

8. Visual Control Management 25 – 26 Sept P.Pinang Adlina Snawi adlina@mpc.gov.my<br />

9. Poka yoke 25 -26 Sept Petaling Jaya Mohd Hosni hosni@mpc.gov.my<br />

10. Supply Chain Management 7 – 8 Okt Kuantan Hazwani Nadiah hazwani@mpc.gov.my<br />

11. Single Minute Exchange of Die 29 – 30 Okt Petaling Jaya Saliza Saari saliza@mpc.gov.my<br />

12. Kanban 12 -13 Nov Petaling Jaya Mariatul Af-Ida mariatul@mpc.gov.my<br />

13. Total Productive Maintenance 19 -20 Nov Petaling Jaya Ab. Malek malek@mpc.gov.my<br />

14. Strenghtening Lean Manufacturing<br />

through Kaizen Practices<br />

19 – 20 Nov P.Pinang Hisyam Hatimtai hisyam@mpc.gov.my


ROAD MAP IN <strong>LEAN</strong> JOURNEY (EIIP)


(6) PROJEK PEMBANGUNAN SISTEM<br />

Mula<br />

Taklimat<br />

Lean<br />

Latihan<br />

• Pengurusan Lean<br />

• Lean VSM & Tools<br />

Perundingan<br />

• 4 – 6 kali lawatan<br />

Penilaian<br />

• Semakan projek<br />

Lean


PROJEK PEMBANGUNAN SISTEM


(7) PENGIKTIRAFAN PENGAMAL ‘<strong>LEAN</strong>’<br />

- Peringkat Organisasi<br />

- Ke arah mempersijilkan organisasi yang<br />

mengamalkan ‘lean,<br />

- Kriteria pengiktirafan ‘Lean’:<br />

Bahagian 1 : ‘Lean Culture Assesment’<br />

Bahagian 2: ‘Lean Projects Assessment’<br />

- Penilaian ‘Pilot’ sedang dilakukan untuk 18<br />

organisasi<br />

- Sijil pengiktirafan dianugerahkan pada 30<br />

April 2013.


Senarai Organisasi<br />

Bil Nama Organisasi Catatan<br />

1 Perbadanan Kemajuan Negeri Pahang, Kuantan - Kerajaan<br />

2 Pejabat Daerah dan Tanah, Kuantan - Kerajaan<br />

3 Majlis Perbandaran Kuantan, Kuantan –Kerajaan<br />

4 UiTM, Jengka – Kerajaan<br />

WPT (Program<br />

Pembangunan Sistem)<br />

5 Camtronics Sdn. Bhd., Kluang -Elektronik dan Elektrik<br />

6 Eurotech (M) Sdn. Bhd., Nilai - Pembuatan Plastik Dan Getah<br />

7 Global Factor Sdn. Bhd., Kuantan- Produk Plastik dan Getah<br />

8 Lion Steelworks Sdn. Bhd., Bukit Raja, Klang - Logam Dibentuk<br />

MyKe (SME)<br />

9 Idealhealth Sdn. Bhd., Sg. Petani -Pekhidmatan Kesihatan<br />

10 M&D Presion Sdn. Bhd., Petaling Jaya -Produk Plastik dan Getah<br />

11 Shan Poornam Metals Sdn. Bhd., Perai -Logam Yang Dibentuk<br />

Bil Nama Organisasi (Material Cost Saving)<br />

1 Chit Heng Metal Industries Sdn Bhd - Logam Yang Dibentuk<br />

2 CS Yap Metal Parts Industries Sdn Bhd- Logam Yang Dibentuk<br />

3 M&D Presion Sdn Bhd - Produk Plastik dan Getah<br />

4 M.A Prestige Engineering Sdn Bhd - Pembinaan<br />

5 Perfect Brake Force Sdn Bhd- Automotif<br />

6 Shan Poornam Metals Sdn. Bhd. -Logam Yang Dibentuk


(8) PORTAL <strong>LEAN</strong> <strong>MPC</strong><br />

AKTIVITI PUSAT<br />

KECEMERLANGAN (COE)<br />

• MoU<br />

• RTD<br />

• Seminar<br />

• Latihan &<br />

Pembangunan<br />

Sistem<br />

LAMAN UTAMA<br />

HUBUNGI KAMI<br />

FAQ<br />

FORUM<br />

TESTIMONI<br />

CARIAN<br />

NOTA <strong>LEAN</strong><br />

• Apa Itu Lean<br />

• Kenapa Lean<br />

• Prinsip Lean<br />

• Alat dan Kaedah<br />

Lean<br />

BUKU <strong>LEAN</strong><br />

GAMBAR <strong>LEAN</strong><br />

VIDEO <strong>LEAN</strong><br />

SLIDES <strong>LEAN</strong><br />

KERATAN AKHBAR <strong>LEAN</strong><br />

CoP <strong>LEAN</strong><br />

TASKFORCE <strong>LEAN</strong><br />

AKTIVITI <strong>LEAN</strong> <strong>MPC</strong> HQ & WILAYAH<br />

SEPATAH KATA<br />

DATO’ KP <strong>MPC</strong><br />

QUOTES OF THE DAY<br />

PAUTAN <strong>LEAN</strong>


Terima Kasih<br />

nikmustafa@mpc.gov.my

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!