20 - 27<br />

review of operations<br />

laporan operasi<br />

CIVIL ENGINEERING AND BUILDING CONSTRUCTION<br />

Civil Engineering and Building Construction divison specialises in the development and construction of infrastructure and<br />

building projects. The Group’s construction activities is undertaken by its flagship company Lankhorst Pancabumi Contractors<br />

Sdn. Bhd, a Class A Bumiputra building and engineering contractor and a Grade G7 contractor registered with the<br />

Malaysian Construction Industry Development Board (CIDB).<br />

Being the forefront of the Group’s business activities, the division is poised to further contribute to the Group’s 2000 earnings<br />

with the completion of:<br />

• 6.5km design and built project of the country’s longest in-situ river bridge across Sungai Dinding<br />

• Implementing the country’s first incremental launching bridge over Sungai Setiawan and Sungai Semalon.<br />

Another remarkable development for the division is the successful completion and handing over of:<br />

• The Prime Minister Office interchange for the new Government Precint at Putrajaya,phase 1A, Parcel A.<br />

• The construction and completion of the main road and drainage system for the new Government Precint at Putrajaya,<br />

Phase 1A, Package R1.<br />

Currently, the division is finalising on the construction of several on going projects secured the year before:<br />

• Main Infrastructure work of 6 storey low cost apartment at Bandar Baru Bangi, Selangor for Perbadanan Kemajuan<br />

Negeri Selangor (PKNS)<br />

• Sub structure works for the Great Hall, Universiti Teknologi Petronas, Tronoh, Perak.<br />

• Construction and completion of 416 units of residential houses in Ampang Pecah, Kuala Kubu Bharu, Selangor.<br />

• Proposed development for 600 units of low cost houses at Sabak Bernam, Selangor.<br />

In the year 2000, despite the current economic situation, we manage to secure the following projects:<br />

• Contract for the Permanent Way Works Package 4 For The Kuantan-Kerteh Railway Project for Petronas.<br />

• A research and development project of Stone Mastic Asphalt for JKR Malaysia.<br />

• Main sub-contract works of the Sungai Buloh Hospital Project for Tunas Selatan Consortium Sdn Bhd.<br />

On the whole, the division renewed its commitment to provide qualitiy service in order to maintain its competitive advantage.<br />

KEJURUTERAAN AWAM DAN PEMBINAAN BANGUNAN<br />

Bahagian Kejuruteraan dan Pembinaan Bangunan menumpukan kepakaran dalam pembangunan dan pembinaan infrastruktur<br />

serta projek-projek bangunan. Aktivi-aktiviti pembinaan bahagian ini diterajui oleh Lankhorst Pancabumi Contractors Sdn.<br />

Bhd., iaitu kontraktor kejuruteraan dan bangunan Bumiputera Kelas A dan kontraktor yang berdaftar dengan Lembaga<br />

Pembangunan Industri Pembinaan (CIDB).<br />

Sebagai peneraju aktiviti perniagaan Kumpulan, bahagian ini meneruskan sumbangan kepada pendapatan Kumpulan pada tahun<br />

2000 dengan kejayaan menyempurnakan:<br />

• Projek pembinaan dan rekabentuk jambatan ‘in-situ’ terpanjang negara menyeberangi Sungai Dinding sepanjang 6.5km.<br />

• Melaksanakan jambatan ‘incremental launching’ yang pertama di negara ini menyeberangi Sungai Setiawan dan Sungai<br />

Semalon.<br />

Pembangunan lain yang begitu bermakna bagi bahagian ini ialah kejayaan menyempurnakan dan menyerahkan:<br />

• Persimpangan Bertingkat Pejabat Perdana Menteri di pusat pentadbiran baru kerajaan di Putrajaya, fasa 1A, Parcel A<br />

• Pembinaan dan penyempuraan jalan utama dan sistem perparitan untuk pusat pentadbiran baru kerajaan di Putrajaya, Fasa<br />

1A, Pakej R1.<br />

Pada masa ini, bahagian ini sedang mengawasi kerja-kerja akhir pembinaan beberapa kontrak dalam pelaksanaan yang diperolehi<br />

pada tahun sebelumnya:<br />

• Kerja-kerja infrastruktur utama iaitu pangsapuri kos rendah setinggi enam tingkat di Bandar Baru Bangi, Selangor untuk<br />

Perbadanan Kemajuan Negeri Selangor (PKNS)<br />

• Kerja-kerja sub struktur Dewan Utama, Universiti Teknologi Petronas, Tronoh, Perak.<br />

• Pembinaan dan penyempurnaan 416 unit rumah di Ampang Pecah, Kuala Kubu Baru, Selangor.<br />

• Cadangan pembangunan 600 unit rumah kos rendah di Sabak Bernam, Selangor.<br />

Walaupun di dalam keadaan ekonomi semasa, kita tetap berjaya memperolehi beberapa projek iaitu:<br />

• Kontrak ‘Permanent Way Works’ Pakej 4 bagi projek pembinaan landasan Kuantan-Kerteh untuk Petronas.<br />

• Projek penyelidikan dan pembangunan ‘Stone Mastic Aspalt’ untuk JKR Malaysia.<br />

• Kerja-kerja sub-kontrak utama bagi Projek Hospital Sungai Buloh untuk Konsortium Tunas Selatan Sdn Bhd.<br />

Secara keseluruhannya, bahagian ini telah memperbaharui komitmen untuk menyediakan perkhidmatan berkualiti bagi<br />

mengekalkan persaingan dalam pasaran yang kompetitif.


Earthworks and infrastructure<br />

project at<br />

Sungai Besi, Kuala<br />

Lumpur.<br />

Kerja-Kerja Tanah dan<br />

Infrastruktur di Sungai<br />

Besi Kuala Lumpur.<br />

6.5km design and built<br />

project of the country’s<br />

longest in-situ river<br />

bridge across Sungai<br />

Dinding<br />

Projek pembinaan dan<br />

rekabentuk jambatan ‘insitu’<br />

terpanjang negara<br />

menyeberangi Sungai<br />

Dinding sepanjang 6.5km.


eview of operations<br />

laporan operasi<br />

SPECIALISED ENGINEERING SERVICES<br />

GEOTECHNICAL ENGINEERING<br />

The year under review was especially busy for Cardon (M) Sdn Bhd whose expertise is evident in soil improvement works,<br />

piling and micropiling works, slope stabilisation and construction of embankments, ponds and landfill.<br />

In welcoming the new millennium, the company’s strategic measure is to continue diligently with the projects that were still<br />

being executed and to ensure timely completion.<br />

The year 2000 was also a cause of pride for Cardon with the completion of several projects entrusted to the company. Among<br />

the contracts successfully delivered by the company were:<br />

• project situated in Bandar Sungai Buaya<br />

• project situated in Sungai Dinding, Perak<br />

In the third quarter of the year, with its proven expertise and experience, Cardon had successfully secured earthworks and soil<br />

improvements projects at Sungai Duyung, Melaka.<br />

For Cardon, the contract mark another remarkable achievement for it increased the company’s book order by RM13 million. It<br />

is anticipated that due to the nature of work and complexity of the soil condition, the contract value could be further increased.<br />

The company’s participation in the project however, helped to minimize the project budget variance and the saving is naturally<br />

handed back to the client. This project is currently at its beginning stage and is expected to be completed wtihin the last quarter<br />

of 2001.<br />

The year under review also demonstrates impressive development for two ongoing projects which are:<br />

• earthworks and infrastructure project at Sungai Besi, Kuala Lumpur<br />

• earthworks and infrastructure project at Balik Pulau, Pulau Pinang.<br />

Both the Sungai Besi and Balik Pulau projects are almost completed with the latter is expected to be handed over during the<br />

first quarter of the year 2001.<br />

The year under review had been a year of opportunities whereby the company had been involved with many promising tender<br />

that still waiting for further negotiation and confirmation.<br />

PERKHIDMATAN KEJURUTERAAN KHUSUS<br />

KEJURUTERAAN GEOTEKNIKAL<br />

Tahun dalam tinjauan merupakan tahun yang agak sibuk bagi Cardon (M) Sdn. Bhd dengan kepakaran yang terbukti dalam kerjakerja<br />

membaik pulih tanah, menanam cerucuk, penstabilan cerun, pembinaan tebingan, pembinaan kolam dan penimbunan tanah.<br />

Bersesuaian dengan kedatangan alaf baru, Cardon (M) Sdn. Bhd, mengambil langkah strategik dan bijak dalam melaksanakan<br />

projek-projek dalam pembinaan dan menyempurnakan projek-projek di dalam masa yang ditetapkan.<br />

Tahun 2000 mencatat kebanggaan kepada Cardon (M) Sdn. Bhd dengan kejayaan menyiapkan beberapa projek yang diamanahkan<br />

kepada syarikat. Antara kontrak-kontrak yang berjaya disempurnakan oleh syarikat ialah:<br />

• projek di Bandar Sungai Buaya, Selangor.<br />

• projek di Sungai Dinding, Perak.<br />

Pada suku ketiga tahun 2000, dengan kepakaran dan pengalaman yang sedia terbukti, Cardon telah berjaya memperolehi kontrak<br />

untuk kerja-kerja tanah dan kerja-kerja membaikpulih tanah di Sungai Duyung, Melaka.<br />

Bagi Cardon, kontrak ini adalah pencapaian yang membanggakan kerana ia telah menambahkan tempahan projek syarikat kepada<br />

RM13 juta. Adalah dijangka, berdasarkan corak kerja semulajadi dan kerumitan keadaan tanah, nilai kontrak ini akan terus<br />

meningkat. Bagaimanapun pembabitan syarikat dalam projek ini dapat membantu mengurangkan ketidaksamaan belanjawan dan<br />

penjimatan ini boleh dimanfaatkan oleh pelanggan. Pada masa ini projek ini masih diperingkat awal dan dijangka siap sepenuhnya<br />

pada hujung tahun 2001.<br />

Tahun dalam tinjauan juga menampakkan perkembangan memberangsangkan bagi dua projek yang sedang dalam pembinaan iaitu:<br />

• kerja-kerja tanah dan infrastruktur di Sungai Besi, Kuala Lumpur.<br />

• kerja-kerja tanah dan infrastruktur di Balik Pulau, Pulau Pinang.<br />

Kedua-dua kerja tersebut hampir disiapkan dan kerja-kerja tanah dan infrastruktur di Balik Pulau, Pulau Pinang dijangka diserah<br />

milik pada suku pertama 2001.<br />

Tahun 2000 adalah tahun yang penuh dengan peluang-peluang perniagaan apabila syarikat terbabit dengan banyak tender-tender<br />

yang masih menunggu rundingan lanjut dan pengesahan.<br />

22 - 23


The construction of railway<br />

track from Kerteh to<br />

Kuantan.<br />

Kerja-kerja pembinaan<br />

landasan keretapi dari<br />

Kerteh ke Kuantan.


eview of operations<br />

laporan operasi<br />

In the competitive pursuit in securing the projects, conclusive proposals have been made to ensure the company’s success. With<br />

the lowest tender price, proven expertise and machineries, the company is confident to obtain the deal in the nearest future. It<br />

is to note that the company’s involvement in this project is significant as it would turn Cardon (M) Sdn Bhd into a reputable<br />

Bumiputera earthwork contractor.<br />

In its dynamic pursuit of broadening its business scope and strengthening its earning base, the company has reactivate the<br />

operations of Tradepro Sdn Bhd, a wholly owned subsidiary company to participate actively in the trading and procurement<br />

exercise targeted for the newly revived Sungai Buloh Hospital Project of which Lankhorst form part of the consortium. It is<br />

anticipated that the trading exercise will tap a portion of the almost RM1 billion project and is expected to generate a healthy<br />

stream of income over the year 2001.<br />

RAILWAY TRACK ENGINEERING<br />

Since its incorporation in 1996, Lankhorst Track Construction Sdn. Bhd (LTC) continue to build a solid reputation as the<br />

Group’s specialist in the construction, strengthening and maintenance of railway tracks. The year under review proved LTC’s<br />

high credibility for being awarded RM34 million worth of contract from Petronas for the construction of railway track from<br />

Kerteh to Kuantan.<br />

Meanwhile the year under review also witnessed LTC’s commitment to complete the ongoing project which are:<br />

• Track strengthening from Bukit Mertajam Station to Padang Besar worth RM11.7 million<br />

• Track strenghtening from Bukit Mertajam Station to Padang Besar (phase 2) worth RM12.5 million.<br />

• Track strengthening from Bukit Merah Station to Butterworth (Phase 2) worth RM13.4 million.<br />

The expansion of new projects and services coupled with its professional and skilled workforce have placed LTC in a strategic<br />

position to capitalise on business opportunities existing within a dynamic and growing market.<br />

24 - 25<br />

Dalam persaingan hebat dengan kontraktor-kontraktor lain untuk mendapatkan projek-projek., cadangan-cadangan yang<br />

menyakinkan telah dibuat untuk memastikan kejayaan syarikat. Dengan harga tender terendah, kemahiran yang terbukti dan<br />

kelengkapan peralatan, syarikat yakin dapat memperolehi kontrak-kontrak pada masa hadapan. Adalah dimaklumkan bahawa<br />

pembabitan syarikat dalam projek ini amat penting kerana ia akan meletakkan Cardon (M) Sdn Bhd sebagai kontraktor kerja-kerja<br />

tanah Bumiputera yang bereputasi baik.<br />

Dalam persaingan dinamik bagi meluaskan bidang perniagaan dan mengukuhkan pendapatan, Cardon telah menggerakkan semula<br />

operasi Tradepro Sdn. Bhd., anak syarikat milik penuhnya untuk melaksanakan aktiviti perniagaan dan pembekalan bagi projek<br />

yang baru di perolehi iaitu Projek Hospital Sungai Buloh yang mana Lankhorst membentuk sebahagian daripada konsortium<br />

untuk projek terbabit. Adalah dijangkakan aktiviti perniagaan ini akan memberi keuntungan daripada keseluruhan projek yang<br />

menelan belanja RM1 billion selain menjana aliran pendapatan yang menyakinkan sepanjang tahun 2001.<br />

KEJURUTERAAN LANDASAN KERETAPI<br />

Sejak diperbadankan pada 1996, Lankhorst Track Construction Sdn Bhd (LTC) terus mencipta reputasi yang tinggi sebagai pakar<br />

dalam bidang pembinaan, pengukuhan dan penyenggaraan landasan keretapi. Tahun dalam tinjauan membuktikan kewibawaan LTC<br />

apabila dianugerahkan kontrak kerja bernilai RM34 juta daripada PETRONAS bagi kerja-kerja pembinaan landasan keretapi dari<br />

Kerteh ke Kuantan.<br />

Sementara itu, tahun dalam tinjauan turut menyaksikan komitmen LTC untuk menyempurnakan kontrak-kontrak kerja dalam<br />

pembinaan iaitu:<br />

• Pengukuhan landasan dari Stesen Bukit Mertajam ke Padang Besar bernilai RM11.7 juta.<br />

• Pengukuhan landasan dari Stesen Bukit Mertajam ke Padang Besar (Fasa 2) bernilai RM12.5 juta.<br />

• Pengukuhan landasan dari Stesen Bukit Merah ke Butterworth (Fasa 2) bernilai RM13.4 juta.<br />

Pengembangan projek-projek baru dan perkhidmatan selain disertai tenaga mahir dan profesional ternyata telah meletakkan LTC<br />

di kedudukan terbaik bagi merebut peluang perniagaan yang sedia ada dalam pasaran yang semakin meningkat serta dinamik ini.


Proposed development<br />

for 600 units of low<br />

cost houses at Sabak<br />

Bernam, Selangor.<br />

Cadangan pembangunan<br />

600 unit rumah kos<br />

rendah di Sabak Bernam,<br />

Selangor.<br />

The construction of<br />

building and infrastructure<br />

work are heavily under<br />

progress at Desa<br />

Bukit Bujang a mixed<br />

residential project on a<br />

166-acre site located in<br />

Kuala Kubu Bharu.<br />

Kerja-kerja pembinaan<br />

banguna dan infrastruktur<br />

sedang rancak dijalankan<br />

projek pembangunan Desa<br />

Bukit Bujang iaitu projek<br />

kediaman bercampur di<br />

atas tanah seluas 166 ekar<br />

yang terletak di Kuala Kubu<br />

Bharu.


eview of operations<br />

laporan operasi<br />

MECHANICAL AND ELECTRICAL ENGINEERING<br />

The year under review was especially busy for Lankhorst M & E as it strengthen its role as an expert in the supply, installation<br />

and commissioning of mechanical and electrical engineering services, particulary in air-conditioning and ventilation, electrical and<br />

fire fighting systems for buildings constructed by the Group as well as for external clients. The division also undertakes<br />

maintenance services following completion of installation work.<br />

The year under review also witnessed Lankhorst M&E success in achieving RM13 million turnover whilst continuing to make<br />

notable progress in the ongoing projects.<br />

Among the ongoing projects for the year include:<br />

• Universiti Sains Malaysia (USM) Nibong Tebal, Pulau Pinang - Phase 2 and 3<br />

• Universiti Malaysia Sabah (UMS) - Phase 1B<br />

• Lembaga Peperiksaan Malaysia, Jalan Duta<br />

• Fire Protection Service<br />

• Maintenance Services.<br />

As the Group’s leading Mechanical and Electrical specialist, Lankhorst M & E will continue its effort to contribute to the Group’s<br />

turnover and profit for the near future. With its experience and expertise, Lankhorst M & E is confident to secure several major<br />

contracts in the construction industry.<br />

Among the contracts are:<br />

• Putrajaya Parcel E (Mechanical and Electrical)<br />

• Hospital Sungai Buloh (Mechanical and Electrical)<br />

INTEGRATED ACTIVITIES PROPERTY DEVELOPMENT AND PROJECT MANAGEMENT<br />

Leading the property division is Lankhorst Hartanah Sdn Bhd which was established to capture the opportunities offered by the<br />

industry. The company undertakes property development and project management activities and is expected to give rise to<br />

added business opportunities for the Group.<br />

The division is currently managing the development of Desa Bukit Bujang, a mixed residential project on a 166-acre site located<br />

in Kuala Kubu Bharu. The construction of building and infrastructure work are heavily under progress and the project is<br />

expected to be handed over in July 2001.<br />

To meet the existing demand for affordable development projects, Lankhorst Hartanah Sdn Bhd is in the process of coverting<br />

its land located in Senawang, Negeri Sembilan from highrise condominium into Terrace and Double Storey Houses. The project<br />

is targeted to be launched toward the end of 2001.<br />

KEJURUTERAAN MEKANIKAL DAN ELEKTRIKAL<br />

Tahun dalam tinjauan merupakan tahun yang sibuk bagi Lankhorst M&E untuk terus mengukuhkan kedudukannya sebagai pakar<br />

dalam bidang kejuruteraan mekanikal dan elektrikal, terutamanya dalam pemasangan sistem hawa dingin dan pengaliran udara,<br />

pemasangan sistem elektrik dan pemadam kebakaran, untuk bangunan yang dibina oleh Kumpulan dan juga untuk klien luar.<br />

Selain itu, bahagian ini juga menyediakan khidmat penyenggaraan selepas kerja-kerja pemasangan dilakukan.<br />

Tahun dalam tinjauan juga menyaksikan kejayaan Lankhorst M&E mencapai hasil sehingga RM13 juta selain terus menampakkan<br />

kemajuan dalam menyempurnakan kontrak-kontrak dalam pelaksanaan.<br />

Antara projek-projek dalam pelaksanaan ini termasuk:<br />

• Universiti Sains Malaysia (USM) Nibong Tebal, Pulau Pinang - Fasa 2 dan 3<br />

• Universiti Malaysia Sabah (UMS) - Fasa 1B<br />

• Lembaga Peperiksaan Malaysia, Jalan Duta<br />

• Sistem Perlindungan Kebakaran<br />

• Khidmat Penyenggaraan.<br />

Sebagai peneraju utama Kejuruteraan Mekanikal dan Elektrikal Kumpulan, Lankhorst M&E akan terus berusaha untuk menyumbang<br />

kepada pendapatan kumpulan untuk tahun-tahun akan datang. Dengan pengalaman dan kemahiran yang dimiliki Lankhorst M&E<br />

yakin untuk mendapatkan beberapa kontrak utama yang ditawarkan oleh industri pembinaan negara.<br />

Antara kontak-kontrak terbabit termasuk:<br />

• Putrajaya Parcel E (Mekanikal dan Elektrikal)<br />

• Hospital Sungai Buloh (Mekanikal dan Elektrikal)<br />

AKTIVITI-AKTIVITI BERSEPADU PEMBANGUNAN HARTANAH DAN PENGURUSAN PROJEK<br />

Bahagian Hartanah diterajui oleh Lankhorst Hartanah Sdn Bhd, bahagian yang ditubuhkan untuk merebut peluang-peluang yang<br />

ditawarkan dalam industri hartanah. Syarikat ini bertanggungjawab terhadap pembangunan hartanah serta aktiviti-aktiviti pengurusan<br />

projek yang diharap akan dapat membawa lebih banyak peluang perniagaan tambahan kepada Kumpulan.<br />

Pada masa ini, Bahagian Hartanah sedang giat menjalankan projek pembangunan Desa Bukit Bujang iaitu projek kediaman bercampur<br />

di atas tanah seluas 166 ekar yang terletak di Kuala Kubu Bharu. Kerja-kerja pembinaan bangunan dan infrastruktur sedang<br />

rancak dijalankan dan dijangka diserah milik pada Julai 2001.<br />

Bagi memenuhi permintaan yang sedia ada terhadap projek pembangunan mampu milik, Lankhorst Hartanah Sdn Bhd sedang<br />

dalam proses untuk menukar status tanah di Senawang, Negeri Sembilan daripada projek pembangunan kondominium kepada<br />

projek pembangunan Rumah Teres dan Rumah Berkembar 2 tingkat. Projek ini dijangka dilancarkan pada akhir tahun 2001<br />