10.07.2015 Views

kapak asil convert.FH10 - TürkMMMB - Türk Müşavir Mühendisler ve ...

kapak asil convert.FH10 - TürkMMMB - Türk Müşavir Mühendisler ve ...

kapak asil convert.FH10 - TürkMMMB - Türk Müşavir Mühendisler ve ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FAALİYET ALANLARIDERİN KAZI <strong>ve</strong> İKSA SİSTEMLERİ•Öngermeli• Zemin Ankrajı•Mini• Fore Kazık•Fore• Diyafram Kazık Duvar•Zemin• Mini Kazık Çivisi•Diyafram• Zemin Çivisi DuvarDERİNDERİNTEMELLERTEMELLER•Yerinde Dökme• Yerinde Dökme Betonarme Fore Kazık•Kazık Yükleme Deneyleri Betonarme Fore Kazık• Sürekli Auger (CFA) sistemi ile kazık•Kazık Süreklilik Testleri•Sürekli• Kazık YüklemeAuger (CFA)Deneylerisistemi ile kazıkZEMİN• Kazık SüreklilikİYİLEŞTİRMELERİTestleri•Jet ZEMİN Grout İYİLEŞTİRMELERİUygulamaları•Derin• Jet Grout Drenaj Uygulamaları- Yatay Drenaj•Enjeksiyon• •Ön• Taşkolon Yükleme•Taşkolon• Kumkazık•Dinamik• Derin Drenaj Kompaksiyon - Yatay Drenaj•Kumkazık• Ön YüklemeGEÇİRİMSİZLİK • Dinamik Kompaksiyon PERDELERİ•Slurry GEÇİRİMSİZLİK Perde PERDELERİ•Jet• Slurry Grout Perde ile Perdeler•Kesişen• Kazıklı PerdelerTASARIM • Jet Grout ile Perdeler•Yüzeysel <strong>ve</strong> Kazıklı Temeller•Dolgu/Yarma Şev StabilitesiTASARIM •Kazı İksa Sistemleri••Heyelan Yüzeysel İnceleme <strong>ve</strong> Kazıklı <strong>ve</strong> Temeller İstinad Duvarları <strong>ve</strong> Onarım Projeleri• Kazı •Zemin İksa İyileştirmesiSistemleri <strong>ve</strong> İstinad Duvarları••Su Zemin Tutma İyileştirmesi Yapıları (Baraj, Gölet, vs.)• ZEMİN Dolgu/Yarma ETÜDÜ Şev - SU Stabilitesi SONDAJI•• Heyelan Sondaj <strong>ve</strong> İnceleme Numune <strong>ve</strong> Alımı Onarım Projeleri••Sızma Su Tutma Deneyi Yapıları (Baraj, Gölet, vs.)ZEMİN •Laboratuar ETÜDÜ Deneyleri - SU SONDAJI••Basınçlı Sondaj <strong>ve</strong> Su Numune Deneyleri Alımı• Laboratuar Deneyleri• FIELDS Standart OF Penetrasyon ACTIVITY Deneyi (SPT)• Pressiyometre Deneyi• EXCAVATIONS Sızma Deneyi and RETAINING STRUCTURES••Prestressed Basınçlı Su Deneyleri Soil Anchors•Soil Nailed WallsFIELDS •Bored OF Piles ACTIVITY•Diaphraghm WallsEXCAVATIONS •Mini Piles and RETAINING STRUCTURES• DEEP Prestressed FOUNDATIONS Soil Anchors••Cast Bored In-Place Piles Bored Piling••Pile Mini Load Piles Tests••Piles Soil Nailed with CFA Walls Method••Pile Diaphraghm Integrity Walls TestsDEEP GROUND FOUNDATIONSIMPROVEMENT••Jet Cast Grouting In-Place ApplicationsBored Piling••Well Piles with Point CFA Method••InjectionPile Integrity Tests••Pre-loadingPile Load TestsGROUND •Stone Columns IMPROVEMENT• Jet •Dynamic Grouting CompactionApplications• Injection •Wickdrain• Stone CUT-OFF Columns WALLS• Wickdrain •Slurry Walls• Well •Jet Grout Point Walls• Pre-loading•Secant Pile Walls• Dynamic DESIGN CompactionCUT-OFF•ShallowWALLSand Deep Foundations•Ground Impro<strong>ve</strong>ment• Slurry Walls•Retaining Systems for• Secant Pile Walls•Embankment/Excavation Excavations and Retaining• JetWallsGroutSlopeWallsStability AnalysisDESIGN•Landslide In<strong>ve</strong>stigations• Shallow •Water Front and Deep Structures Foundations and Remedial Design Projects• Retaining (Earth or Irrigation Systems for Dams, Excavations etc) and Retaining Walls• Landslide GEOTECHNICAL In<strong>ve</strong>stigations INVESTIGATIONS and Remedial - WATER Design WELL Projects DRILLING• Ground •Boring Impro<strong>ve</strong>mentand Core Drilling• Embankment/Excavation •Permeability Testing Slope Stability Analysis• Water •Laboratory Front Structures Testing (Earth or Irrigation Dams, etc)GEOTECHNICAL •Water Pressure INVESTIGATIONS Testing - WATER WELL DRILLING• Boring •Standart Penetration Core Drilling Testing (SPT)• Laboratory •Pressuremeter Testing Testing• Standart Penetration Testing (SPT)• Pressuremeter Testing• Permeability Testing• Water Pressure TestingKarkamış Barajı <strong>ve</strong> Hes Birecik SeddeleriKarkamış Dam & HEPP Birecik CofferdamsSlurry Trench Geçirimsiz Duvar UygulamasıSlurry Trench Impermeable Walls, 2005 -2006Samsun Kumköy RegülatörüSamsun Kumköy WeirKesişen Kazık <strong>ve</strong> Jet Grout Taban Tapası ile Kuru Temel ÇukuruConstruction of Secant Piles and Jet Grout Basement Plug for Dry Basement ExcavationSuudi Arabistan Cidde Kanalizasyon Ağı İnşaatıKSA Jeddah Sewer System ConstructionKesişen Kazıklarla Düşey Şaft YapımıConstruction of Shafts by Secant Piling, 2008 – 2009Ünye Çimento Sanayi Silo Temeli İnşaatıUCS Silo Foundation Construction1200 ton Statik Kazık Yükleme Deneyi1200 tons Static Pile Load Test, 2001173

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!