13.07.2015 Views

PDF-format - Miljøstyrelsen

PDF-format - Miljøstyrelsen

PDF-format - Miljøstyrelsen

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Greywater ProductionRyesgade (Cancelled)Baldersgade 20-22 (Cancelled)NordhavnsgårdenAfd. 47 VirklundLEV husetAfd. 42 VirklundFolehavenHedehusene4,1182528333535410 5 10 15 20 25 30 35 40 45Greywater (litre/person x day)Figure C: Greywater ProductionThe average power consumption for treatment and distribution of 1 m 3 ofgreywater was estimated. It should, however, be noted that the power consumptionhas been estimated and not measured, as no secondary kilowattmeter was available for separate registration of the consumption for greywatercomponents.Figure D summarises the estimated power consumption per m 3 of treatedgreywater.Power ConsumptionRyesgade (Cancelled)Baldersgade 20-22 (Cancelled)NordhavnsgårdenAfd. 47 VirklundLEV husetAfd. 42 VirklundFolehavenHedehusene1,931,51,445,017,30 2 4 6 8 10 12 14 16 18 20Power (kWh/m 3 greywater)Figure D: Power Consumption per m 3 of GreywaterThe total operating costs were estimated on the basis of in<strong>format</strong>ion collectedat the inspection of the treatment systems. The results are represented in figureE below.16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!