The world of hot dip galvanizing around us - hdgasa
The world of hot dip galvanizing around us - hdgasa
The world of hot dip galvanizing around us - hdgasa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Tama Animal Gardens Insects Ecological Park.<br />
Galvanizing serves to protect the delicate animals by<br />
being free from maintenance such as polishing and<br />
repainting.<br />
This architecture won the Architectural Institute <strong>of</strong> Japan<br />
Prize and the Japan Association <strong>of</strong> Artists Craftsman &<br />
Architects Prize.<br />
<strong>The</strong> <strong>world</strong> <strong>of</strong> <strong>hot</strong> <strong>dip</strong> <strong>galvanizing</strong> <strong>around</strong> <strong>us</strong><br />
Solar panel shelter and louver <strong>of</strong> local<br />
government <strong>of</strong>fice building (Okinawa Pref)<br />
This local government <strong>of</strong>fice building <strong>of</strong> Itoman city,<br />
Okinawa was rebuilt in 2002. It is equipped with solar<br />
panels which can generate 195kW <strong>of</strong> power. <strong>The</strong> panels are<br />
set on the ro<strong>of</strong> and shelters <strong>of</strong> the building to utilise the<br />
solar power and to weaken the sunshine. <strong>The</strong>y are<br />
expected to provide up to 20% <strong>of</strong> the total electric power<br />
expenditure <strong>of</strong> the <strong>of</strong>fice building.<br />
Galvanized steel beams support the panels and are exposed<br />
to the rainwater, sun and sea breeze <strong>of</strong> the subtropical zone.<br />
Umeda Sky-Building<br />
<strong>The</strong> 40 stories-high Umeda Sky-Building stands near the<br />
Osaka Station <strong>of</strong> West Japan Railway Co. It consists <strong>of</strong> two<br />
towers, which meet each other at the 39th story. <strong>The</strong><br />
ro<strong>of</strong>top is <strong>us</strong>ed as an observation platform.<br />
<strong>The</strong> steel structures and frames <strong>us</strong>ed for the see-through<br />
elevator from the third story, the escalators from the 36th<br />
story and the connection bridge at the 22nd story are <strong>hot</strong> <strong>dip</strong><br />
galvanized.<br />
Built: 1987/12 Area: 2 486 2 continued on page 16...<br />
Volume 8 Issue 4 2011 Hot Dip Galvanizing Today 15