5. On February 22, 2011, in response to a citizen complaint, an inspection of the site<br />

was conducted by ADEQ personnel. The inspection identified multiple violations.<br />

6. ADEQ personnel identified that more than fourteen (14) days had passed since<br />

construction activities ceased and Site had not been stabilized by Permittee.<br />

7. Part II (A)(4 )(H)(2)(d) of ARR150000 requires "Stabilization measures shall be<br />

initiated as soon as practicable in the portions of the site where construction activities have<br />

temporarily or permanently ceased, but in no case more that fourteen (14) days after the<br />

construction activity in that portion of the site has temporarily or permanently cease" as a<br />

requirement of Permittee's SWPPP. <strong>No</strong> exceptions to this requirement were claimed by<br />

Permittee or observed by ADEQ personnel.<br />

8. Permittee's failure to stabilize the Site is a violation Part II (A)(4)(H)(2)(d) of the<br />

ARR150000, Permittee's SWPPP and thus Ark. Code Ann.§ 8-4-217(a)(3) which states,<br />

"It shall be unlawful for any person to ... [v]iolate any provisions of ... a permit issued ...<br />

by the Arkansas Department of Environmental Quality".<br />

9. ADEQ personnel identified that sediment had been washed off several lots onto<br />

adjacent roads.<br />

10. Part II(A)(4 )(H)(1 )(d) of ARR150000 required Permittee's SWPPP to address the<br />

escape of soil from a site providing that, "If sediment escapes the construction site, off-site<br />

accumulations of sediment must be removed at a frequency sufficient to minimize<br />

minimum off-site impacts."<br />

11. Permittee had not removed sediment from the adjacent roads in violation of the<br />

terms of the ARR150000 and thus Ark. Code Ann. § 8-4-217(a)(3).