1.1 PROJECTS AT ABBOT POINT<br />
ABBOT POINT CUMULATIVE ENVIRONMENTAL IMPACT ASSESSMENT<br />
The existing and proposed projects at Abbot Point are outlined in the table below and illustrated in Figure2.<br />
Project name Proponent Description EPBC status<br />
T0 & associated rail Adani Additional expansion relating to T1 of approximately 35mtpa Referred<br />
T1 (existing operation) Adani Existing 50mtpa coal export terminal and associated rail -<br />
T2 & associated rail<br />
T3 & associated rail<br />
T4-T9 & Multi User<br />
Infrastructure Corridor<br />
BHP<br />
Billiton<br />
Hancock<br />
Coal<br />
60mtpa expansion<br />
60mtpa expansion<br />
TBC Indicative only (6 terminals up to 240mtpa)<br />
4|<br />
Separate referrals for p ort<br />
and rail<br />
Separate referrals for p ort<br />
and rail<br />
T0 / T2 / T3 dred ging NQBP Com bined dred ging proposals Referred<br />
Multi Cargo Facility (MCF) NQBP<br />
Further coal export capacity and capacity for other large scale<br />
industries<br />
Figure 2: overview of current and proposed projects at Abbot Point<br />
Referral expected mid<br />
2012<br />
Decision Pending