6.1.7 Other inspection and testing requirements shall be as per respective Standard<br />

<strong>specification</strong>s <strong>of</strong> various instrument items.<br />

6.2 SKID:<br />

The following tests shall be conducted for the skid<br />

a. Hydro testing<br />

b. Pneumatic Leak test <strong>of</strong> complete skid at 7 Kg/cm2.<br />

c. Skid functional testing considering metering, pressure regulation, limiting and safety<br />

characteristics. (Functional testing <strong>of</strong> PCV / Slam shut valves shall be demonstrated by<br />

simulation in vendor’s shop)<br />

d. Skid piping material testing and NDT <strong>of</strong> welds as per Piping material <strong>specification</strong>s.<br />

Radiography/X-ray shall be carried out for all welded joints and vendor shall furnish test<br />

certificate for the same. Dye-penetration test certificate shall be provided for joints wherever<br />

radiography/x-ray is not possible.<br />

e. Radiography/X-ray , Charpy impact testing for line mounted instrument items such as Self<br />

actuated pressure control /monitor valves , pressure relief valves, slam shut valves,<br />

Ultrasonic meters and meter runs etc.<br />

f. Testing and inspection requirements for Gas filter equipment and for skid piping materials<br />

shall be as per <strong>specification</strong>s attached else where in the bid package.<br />

6.3 Skid Equipments<br />

The following tests shall be conducted :<br />

6.3.1 Requirements <strong>of</strong> non destructive testing like radiography, magnetic particle test, hardness test,<br />

hydrotest, Charpy test for Self actuated control valves , pressure relief valves, slam shut valves,<br />

Ultrasonic meters and meter runs shall be carried out strictly as per following <strong>specification</strong>.<br />

a) 100% radiography shall be carried out on all casting. Radiography procedure and area <strong>of</strong><br />

casting to be radiographed shall be as per ANSI B16.34 and acceptance criteria shall be as<br />

per ANSI B16.34 Annexure B. Two shots shall be taken for each area to be radiographed,<br />

as a minimum.<br />

b) Radiography/X-ray shall be carried out for all welded joints and vendor shall furnish test<br />

certificate for the same. Dye-penetration test certificate shall be provided for joints wherever<br />

radiography/x-ray is not possible.<br />

c) Each ultrasonic meter along with meter runs shall be subjected to hydrostatic test with a<br />

pressure <strong>of</strong> 1.5 times the design pressure.<br />

d) Charpy impact test on each heat <strong>of</strong> base material shall be conducted as per A370 for all<br />

pressure containing parts such as body, end flanges and welding ends as well as bolting<br />

material for pressure containing parts. Unless specified otherwise, the Charpy impact test<br />

shall be conducted at 0°C. The Charpy impact test specimen shall be taken in the direction<br />

<strong>of</strong> principal grain flow and notched perpendicular to the original surface <strong>of</strong> plate or<br />

forging.The minimum average absorbed energy per set <strong>of</strong> three specimens shall be 27J<br />

with an individual minimum per specimen <strong>of</strong> 22 J.<br />

6.3.2 Flow meter, meter run, flow computer and accessories shall be <strong>of</strong>fered for pre- dispatch<br />

inspection to <strong>GAIL</strong> and / or <strong>GAIL</strong>'s representatives. Following tests , checks shall be conducted:<br />

a) Physical/ dimensional checks and <strong>work</strong>manship. Checking <strong>of</strong> meter tube roughness.<br />

b) Calibration including establishing linearity and repeatability over the entire range. Wet<br />

calibration <strong>of</strong> Ultrasonic Flow Meter shall be performed along with the meter runs<br />

and flow pr<strong>of</strong>iler to be supplied with the skid.<br />

c) Functional and simulation tests including checking <strong>of</strong> hardware and s<strong>of</strong>tware for Flow<br />

computers including ultrasonic flow meters and gas chromatographs with all its subsystems<br />

in fully integrated configuration.<br />

d) All the panels along with all instruments mounted on it including flow computers, indicators,<br />

barriers, isolators and accessories etc.<br />

e) Review <strong>of</strong> all certificates and test reports.<br />

In the event the purchaser is unable to witness a test, the test shall anyway be completed<br />

by the vendor and documents for the same shall be submitted for scrutiny before shipment.<br />

f) All tests as per Standard <strong>specification</strong>s attached with this bid document.<br />

6.3.3 Following tests shall be carried out by vendor at his <strong>work</strong>s and test certificates shall be furnished:<br />

a) Calibration / test certificates for all instruments. Calibration test reports for flow meters duly