MODERN EXECUTIVE<br />

Progress made: As the part’s design was<br />

not finalized when the mold order was<br />

placed, the moldmaker suggested that<br />

the customer approve its preliminary<br />

mold design so that it could order steel<br />

and get rough machining work completed;<br />

final mold design could be finished<br />

once the final 3D data were provided.<br />

The Best Resource<br />

for Innovative<br />

Blow Molding<br />

Technology<br />

See us at K‘<strong>2007</strong><br />

Düsseldorf<br />

<strong>October</strong> 24.-31.<br />

Hall 14<br />

Booth 14A18<br />

CLICK MPW a INFOLINK @ www.modplas.com<br />

The moldmaker placed an order with<br />

MoldMasters to ensure suitable hot runners<br />

were available in time. The mold<br />

assembly was finished a bit earlier than<br />

scheduled. The customer later asked about<br />

the availability of Staubli water manifolds.<br />

After discussion, the customer agreed that<br />

it would supply these, with the moldmak-<br />

‚We are ready to assist<br />

you, no matter when<br />

and where in the world‘<br />

With the innovative extrusion<br />

blow molding techniques of<br />

Kautex Maschinenbau, almost<br />

any shape can be produced<br />

repeatably and cost effectively.<br />

Kautex offers everything from<br />

expert consultations to complete<br />

turnkey production systems, always<br />

focusing on your bottom line.<br />

Your Future in <strong>Plastics</strong><br />

er using the processor’s drawing to complete<br />

all water and manifold fittings.<br />

The customer required limit switches<br />

for moveable components, which TMT<br />

installed and tested. Also, for mold precision,<br />

the customer required a DME interlock<br />

system.<br />

Trials commence: After mold manufacturing,<br />

TMT conducted internal mold trials,<br />

then a formal mold trial, using the customer’s<br />

molding parameters divined<br />

from mold flow analysis. To cut costs it<br />

used locally sourced purging material.<br />

Then the customer’s material was<br />

processed for a formal molding trial with<br />

video taken of six complete cycles,<br />

including the movement of automatic<br />

parts’ drop-off and all moveable components,<br />

as well as close-up views of<br />

core/cavity, gating, the hot runner system,<br />

wiring, venting, engravings, nitrided<br />

areas, bed-off pads, and water connector<br />

fittings/manifold.<br />

Once good parts were processed in a<br />

suitable cycle time, TMT collected and<br />

packaged the molded parts and sent<br />

these to the processor via DHL door-todoor<br />

service, with an e-mail to the customer<br />

reporting the trial result, including<br />

the molding parameters used, the inspection<br />

report following 2D drawings, a forward<br />

action plan, and suggestions.<br />

The finish line: The customer sent its comments<br />

on the samples, plus a few engineering<br />

changes. A final internal trial<br />

was conducted, and the customer then<br />

was notified of the planned final trial<br />

date. The processor came to that trial,<br />

signed for the mold and asked for rapid<br />

delivery. Within seven days all final<br />

details, including shipping logistics, were<br />

complete. Also, TMT sent to the customer<br />

a package including:<br />

• A disc with 2D mold drawings and 3D<br />

mold files.<br />

• 2D drawings by print.<br />

• Certificates of steel, certificates of heat<br />

treatment.<br />

• Final molding parameters.<br />

• Customer’s mold delivery checklist.<br />

• Final electrodes (per customer’s<br />

request).<br />

Happy ending: The customer supplied<br />

quality parts (see photo, p.32) to its<br />

MPW<br />

client on time.<br />

36 OCTOBER <strong>2007</strong> • MODERN PLASTICS WORLDWIDE modplas.com<br />

www.kautex-group.com • Kautex Maschinenbau GmbH • Kautexstraße 54 • 53229 Bonn, Germany • Phone +49 228 489-0 • Fax +49 228 489-414

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!