03.03.2013 Views

Sepulveda Pass Corridor Board Report - Metropolitan ...

Sepulveda Pass Corridor Board Report - Metropolitan ...

Sepulveda Pass Corridor Board Report - Metropolitan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sepulveda</strong> <strong>Pass</strong> <strong>Corridor</strong> Systems Planning Study Executive Summary<br />

Figure 12-5. Concept 5B – HRT Rail Tunnel<br />

Station Name<br />

Distance<br />

(miles)<br />

Time (min)<br />

Total <strong>Board</strong>ings<br />

Peak Off Peak Daily<br />

Sylmar Metrolink - - 3,855 2,581 6,436<br />

Van Nuys/Arleta 3.7 8.1 2,706 1,237 3,943<br />

Van Nuys/Nordhoff 1.6 3.6 4,383 1,647 6,030<br />

Van Nuys Metrolink Station 1.7 3.7 4,228 2,082 6,310<br />

Van Nuys/Orange Line 2.2 5 12,687 3,618 16,305<br />

Van Nuys/Ventura Blvd. 2.0 4.4 5,690 2,154 7,843<br />

UCLA Ackerman Union 6 7.2 3,488 1,195 4,683<br />

Westwood/Wilshire 0.8 1 15,174 3,396 18,570<br />

Westwood/Santa Monica 0.8 0.9 2,880 1,447 4,327<br />

Westwood/Expo Line 1.1 1.5 6,125 2,122 8,246<br />

Overland/Venice 1.8 3.9 2,687 1,078 3,765<br />

Overland/Jefferson 1.3 2.8 1,860 801 2,661<br />

Culver City TC 1.7 3.7 1,845 754 2,599<br />

Century/Aviation 3.5 7.8 11,318 3,590 14,907<br />

TOTAL 28.2 53.6 78,926 27,702 106,625<br />

Figure 12-6. Concept 6 – Combined Highway and Rail Tunnels with Demand Pricing<br />

Station Name<br />

Distance<br />

(miles)<br />

Time (min)<br />

Total <strong>Board</strong>ings<br />

Peak Off Peak Daily<br />

Van Nuys Metrolink Station - - 6,700 2,240 8,939<br />

Van Nuys/Orange Line 2.2 2.6 13,644 3,200 16,843<br />

Westwood/Wilshire 9 10.8 11,048 1,868 12,915<br />

<strong>Sepulveda</strong> Blvd/Expo Line 1.7 2 6,283 1,855 8,137<br />

Century/Aviation 7.8 9.4 9,093 2,538 11,631<br />

TOTAL 20.7 24.8 46,768 11,701 58,465<br />

<strong>Sepulveda</strong> <strong>Pass</strong> <strong>Corridor</strong> Systems Planning Study Page ES -19<br />

Executive Summary

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!