03.03.2013 Views

Sepulveda Pass Corridor Board Report - Metropolitan ...

Sepulveda Pass Corridor Board Report - Metropolitan ...

Sepulveda Pass Corridor Board Report - Metropolitan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sepulveda</strong> <strong>Pass</strong> <strong>Corridor</strong> Systems Planning Study Executive Summary<br />

Summary of Capital Cost Estimates - Full Length Project [1]<br />

Capital Cost Estimate [2]<br />

Transit Highway<br />

Total<br />

Concept 1 At-Grade <strong>Sepulveda</strong> BRT $ 162,542,500 $ - $ 162,542,500<br />

Concept 2 At-Grade Freeway Managed Lanes $ 552,542,500 $ 1,127,880,000 $ 1,680,422,500<br />

Concept 3 Highway Viaduct Managed Lanes $ 134,495,000 $ 2,194,140,000 $ 2,328,635,000<br />

Concept 4 Tolled Highway Tunnel (Low Range) $ 78,400,000 $ 10,378,992,000 $ 10,457,392,000<br />

Concept 4 Tolled Highway Tunnel (High Range) $ 78,400,000 $ 12,876,240,000 $ 12,954,640,000<br />

Concept 5A Fixed-Guideway At-Grade Light Rail Transit (Low Range) $ 7,523,230,000 $ - $ 7,523,230,000<br />

Concept 5A Fixed-Guideway At-Grade Light Rail Transit (High Range) $ 8,506,030,000 $ - $ 8,506,030,000<br />

Concept 5B Fixed-Guideway Heavy Rail Tunnel (Low Range) $ 13,617,552,000 $ - $ 13,617,552,000<br />

Concept 5B Fixed-Guideway Heavy Rail Tunnel (High Range) $ 17,509,440,000 $ - $ 17,509,440,000<br />

Concept 6 Highway/Private Shuttle Tunnels (Low Range) $ 8,705,112,000 $ 22,049,560,000 $ 30,754,672,000<br />

Concept 6 Highway/Private Shuttle Tunnels (High Range) $ 11,417,640,000 $ 27,318,200,000 $ 38,735,840,000<br />

Assumptions:<br />

Figure 15. Rough Order of Magnitude Costs (30-mile ultimate corridor)<br />

1. Costs reflect full development of a 30-mile corridor. Initial project costs for a <strong>Sepulveda</strong> <strong>Pass</strong> only segment<br />

are less.<br />

2. Capital Cost Estimate includes construction and vehicle cost estimates.<br />

<strong>Sepulveda</strong> <strong>Pass</strong> <strong>Corridor</strong> Systems Planning Study Page ES -27<br />

Executive Summary

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!