03.03.2013 Views

Volume-2 - Delhi Metro Rail Corporation

Volume-2 - Delhi Metro Rail Corporation

Volume-2 - Delhi Metro Rail Corporation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PERFORMANCE REQUIREMENT<br />

TENDER NO. DMRC/ELECT./IT&PD/ILBS/HVAC-LV-FF-02<br />

Contractor will be demonstrating the performance of HVAC systems meeting following criteria but<br />

not limited to:<br />

01. Inside environmental conditions in terms of temperature, relative humidity and air<br />

distribution in conditioned area.<br />

02. Inside Environmental conditions in terms of filtration and pollution control; CO2 and CO<br />

values<br />

03. Noise Criteria<br />

04. Equipment Performance in terms of capacity, flow, pressure, test pressure, pressure gradient,<br />

temperature gradient, sensible and latent heat recovery and scrubbing efficiency.<br />

05. Equipment Energy performance<br />

06. Hydraulic balancing<br />

07. Thermal balancing<br />

08. Vibration and seismic performance<br />

09. Temperature Rise of fluid in insulated pipes, insulation performance<br />

10. Calibration and Accuracy of instruments and controls<br />

11. Integration of all equipments on BMS platform<br />

12. Life safety equipment performance and integration with other life safety systems.<br />

13. Electrical performance<br />

PROJECT EXECUTION<br />

In addition to compliance of General Conditions of the Contract (GCC) and Special Conditions<br />

of the Contract (SCC) requirements, the tenderer shall have to consider the following:<br />

SUBMITTALS<br />

A. DURING BIDDING<br />

01. Bidder’s confirmation as per the tender format.<br />

02. Technical Data sheet of all Equipments and material as asked in tender supported by OEM’s<br />

product data to include Mechanical, Electrical, Hydraulics, thermal, Aerodynamic and acoustic<br />

properties.<br />

B. POST AWARD<br />

01. Shop drawings in 1:100 scale for Each HVAC discipline to incorporate,<br />

The general arrangement of systems, sub systems, equipments, components and assemblies.<br />

Supporting arrangements to include hangers, seismic isolations, and vibration isolators.<br />

Foundation details Sectional elevations.<br />

Levels, insert levels and gradient<br />

Typical details.<br />

Blown up details.<br />

Construction joints.<br />

Wall and slabs penetrations, levels, sleeves, sealing mechanism, fire separation, fire integrity,<br />

fire stoppers and fire sealants.<br />

Equipments details containing key engineering performance parameters and equipment<br />

tagging<br />

System schematic drawings indicating riser arrangements, sizing on individual floors, tapoffs<br />

and system flow.<br />

PAGE No 5 of 204 Nov.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!