2.3 CHILLER SYSTEM MANAGER (CSM)<br />

General:-<br />

TENDER NO. DMRC/ELECT./IT&PD/ILBS/HVAC-LV-FF-02<br />

The chiller supplier shall provide a chiller plant management system to perform chiller plant control,<br />

automation, and energy management functions. The chiller plant control system shall have the<br />

capability to monitor and control chillers, primary and secondary pumps, condenser water pumps,<br />

cooling towers and motorized valves to provide the chiller plant operator with control, monitoring,<br />

and management information.<br />

The controller should features high-level algorithms and user interface. The controller should be<br />

suitable for the management of 2- or 4-pipe systems, with regulation on one water circuit, for chiller<br />

or heat pump units and relevant mode change-over, and also with regulation on two circuits, with<br />

independent set-points and parameters, thus exploiting the simultaneous supply of chilled- and hot<br />

water.<br />

The controller should manage up to 10 chiller units, with activation logic focused at the balancing of<br />

operation times and at the achievement of the highest energy efficiency. It should possible to define<br />

conditions of dynamic stand-by and priority as regards the units activation. The alarm management<br />

should be featured, with plain text descriptions and possible notification to remote recipients. There<br />

are minimum two relay outputs should be available, associated to unit- and device alarms.<br />

The multi-level menu should feature the language selection and differentiated access profiles (user<br />

and maintenance).<br />

The circuit temperatures and the status of both system- and unit- operation should be displayed, via<br />

one overview page plus detailed pages.<br />

The regulation can be based on proportional- or proportional + integral logics, or also on a dead-band<br />

algorithm with dynamic adjustment, with relevant temperature inputs managed by the device.<br />

The main Features should be, Set-point offset, outdoor temperature, demand limit should be<br />

included, with relevant analog inputs.<br />

System Hardware :-<br />

The chiller plant control system shall consist of the following hardware:<br />

Chiller Gateway – The BMS vendor should procure the gateway based on their protocol from chiller<br />

vendor.<br />

Field - mounted microprocessor - based chiller plant control panels BACnet compatible building<br />

controller & PROGRAMMABLE CONTROL MODULES (Input/output controller). The Building<br />

controller shall reside on a BACnet inter-network using the ISO 8802-3 (Ethernet or ARCNET<br />

(ASTM 878.1) Physical/data link layer protocol. Each building controller shall perform routing to a<br />

network of Custom Application and Application Specific Controllers. The Building controller shall<br />

also be capable of residing on client's high speed network which supports Internet Protocol (IP). The<br />

Building Controller shall use the Read (Initiate) and Write (Execute) Services as defined in Clauses<br />

11.5 and 11.8, respectively, of ASHRAE Standard 135-95, to communicate with BACnet objects in<br />

the internet work. Objects supported shall include: Analog input, analog output, binary input, binary<br />

output and device.<br />

PAGE No 21 of 204 Nov.2011