04.03.2013 Views

Recommended installation procedures for EuroLite ... - Euroshield

Recommended installation procedures for EuroLite ... - Euroshield

Recommended installation procedures for EuroLite ... - Euroshield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Working from left to right, install the first <strong>EuroLite</strong> Shake panel such that the raised nibs on the<br />

back of the panel touch the top of the eave starter strip below. The first full panel will extend ¾”<br />

past the gable edge. Nail the first panel in place using 7 – 1 ¾” galvanized roofing nails where<br />

indicated in the diagram (see Fastening section). The locking tab in the upper left corner of the<br />

panel will be trimmed off at this point with a knife so the edge is smooth. The next panel will then<br />

be lowered down until the alignment nibs on the back of the panel touch the top portion of the<br />

eave starter in the same manner as the first panel and then slide the panel gently to the left so that<br />

the tab fits into the receiver of the first panel. Press the butt edge of each panel section down so<br />

that the adhesive strip makes contact with the panel below. Continue in this manner until the right<br />

gable is reached and trim the last panel such that you have ¾” overhang on the gable end and are<br />

flush with the edge of the eave starter overhang.<br />

<strong>Euroshield</strong>® Installation Guide – EUROLITE SHAKE March 2012<br />

Page20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!