Recommended installation procedures for EuroLite ... - Euroshield
Recommended installation procedures for EuroLite ... - Euroshield
Recommended installation procedures for EuroLite ... - Euroshield
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
As with the starter strip panels, <strong>installation</strong> must start at the left side of the roof. If working left to<br />
right out of a valley, place the top left portion of the panel in the valley such that the diagonal cut<br />
down, 4 inches out from the centerline of the valley, from left to right cuts through the entire<br />
panel. The overlap on each piece is fitted into the overlap of the preceding one. At the ends of the<br />
courses trim panels (using a power saw or knife), to be flush with the edge. Care should be taken<br />
to keep the cuts straight.<br />
Panels are installed using five (7) 1 ¾” galvanized roofing nails (see illustration above and in<br />
“Fastening” section). This will ensure that there are ten (14) attachment points in each panel as the<br />
fasteners will go through the top portion of the panel below.<br />
ROOF JACKS<br />
Roof Jacks may be fitted and removed in the same manner as with asphalt shingles.<br />
Upon reaching the peak of the roof, the last row of panels may have to be trimmed along the upper<br />
edge, flush with the ridge.<br />
<strong>Euroshield</strong>® Installation Guide – EUROLITE SHAKE March 2012<br />
Page22