05.03.2013 Views

Flora survey for Hamersley Drive recreation - Environmental ...

Flora survey for Hamersley Drive recreation - Environmental ...

Flora survey for Hamersley Drive recreation - Environmental ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FRNP Improvement Project: Culham Inlet to <strong>Hamersley</strong> Inlet GF Craig– July 2010<br />

1. Introduction<br />

Purpose<br />

Main Roads Western Australia (Main Roads) is undertaking upgrade works between Culham Inlet and<br />

<strong>Hamersley</strong> Inlet in the Fitzgerald River National Park (FRNP) on behalf of the Department of<br />

Environment and Conservation (DEC). The works will involve widening and sealing of <strong>Hamersley</strong> <strong>Drive</strong>,<br />

spur roads and carparks <strong>for</strong> tourism purposes. It is likely that the works will require the clearing of up to<br />

10 m of native vegetation on either side of the existing gravel roads from the current centre line.<br />

Main Roads require biological <strong>survey</strong>s <strong>for</strong> the above project. The purpose of the <strong>survey</strong>s is to provide an<br />

appropriate examination and description of the receiving environment to ensure that all aspects of<br />

biological/ecological significance are identified and recorded. The results of the biological <strong>survey</strong> will<br />

assist in the preparation of an <strong>Environmental</strong> Impact Assessment and an <strong>Environmental</strong> Management<br />

Plan or other referral documents.<br />

Background<br />

The proposal to upgrade roads in the Fitzgerald River National Park was first announced on the<br />

30 January 2009 by the Honorable Colin Barnett Premier; Minister <strong>for</strong> State Development with the intent<br />

to offset the economic effect of the closure of the Ravensthorpe nickel mine. The State Government<br />

committed to a long term measure of support to increase economic viability of the towns of<br />

Ravensthorpe and Hopetoun in the Shire of Ravensthorpe.<br />

The road upgrade is intended to inject funds into the communities of Hopetoun and Ravensthorpe by<br />

providing opportunities <strong>for</strong> local sub-contractors to be employed through the construction process.<br />

Economic benefits will also flow to service providers in the local towns through the delivery of this<br />

project.<br />

Study Area<br />

Figure 1 details the location of the biological <strong>survey</strong>. The <strong>survey</strong> is restricted to an area 25 m either side<br />

of the existing road alignment, including all spur roads and the car park loop roads which have been<br />

identified by DEC’s Landscape Architects. Eventually, the <strong>survey</strong> area is to include borrow and gravel<br />

pits, base course and sub-base pits, spoil sites, proposed works camp and compound areas, stockpile<br />

sites and any other areas to be disturbed.<br />

This report amalgamates in<strong>for</strong>mation from Stage 1, and includes new data from Stages 2 and 3. Stage 4<br />

will be provided in a separate report.<br />

Stage 1<br />

The first stage included 10 km of <strong>Hamersley</strong> <strong>Drive</strong>, from Culham Inlet to the <strong>Hamersley</strong> Inlet Road<br />

intersection. An interim report was provided to Main Roads WA in November 2009 (Craig and Hickman<br />

2009). An addendum, which included locations of the Declared Rare Verticordia pityrhops,, was<br />

provided in December 2009 (Craig 2009).<br />

Stage 2<br />

The second stage <strong>survey</strong>ed a further 11 km and included <strong>Hamersley</strong> Inlet Road to <strong>Hamersley</strong> Inlet, to<br />

both the Shire of Ravensthorpe and DEC camping areas, plus the spur roads to Four Mile Beach,<br />

Barrens Beach, Mylies Beach (East and West), Cave Point and West Beach. These were <strong>survey</strong>ed<br />

between January and April 2010.<br />

Stage 3<br />

The <strong>recreation</strong>al sites at the end of each spur road are currently being designed by DEC. The carparks<br />

and small loop roads between Culham Inlet and West Beach had draft concept plans available in June<br />

2010 and were <strong>survey</strong>ed in July.<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!