N 2 purging system:<br />
During every gas-system depressurisa-<br />
tion, an inert-gas purging system must<br />
be connected manually or autom<strong>at</strong>ical-<br />
ly, in order to purge out remaining gas<br />
or oxygen. An additional valve before<br />
the first block valve and connected to<br />
the outlet silencer must also be installed<br />
so depressuris<strong>at</strong>ion and purging is pos-<br />
sible.<br />
Control and safety system:<br />
<strong>The</strong> ME-<strong>GI</strong> control system supplies a<br />
gas pressure set-point to the gas-sup-<br />
ply system depending on engine load,<br />
th<strong>at</strong> is, gas-pressure dynamics follow<br />
engine-load dynamics. HC sensors<br />
must be applied to the gas-supply sys-<br />
tem in order to detect leakages.<br />
Task &<br />
Schedule<br />
ME-<strong>GI</strong><br />
Development<br />
<strong>Test</strong> rig<br />
development<br />
<strong>4T50ME</strong>-<strong>GI</strong><br />
Research<br />
<strong>Engine</strong><br />
Development of<br />
Gas Injection –<br />
ECS<br />
Helios Project<br />
EU FP7<br />
7S60ME-<strong>GI</strong>8<br />
ME-<strong>GI</strong><br />
Order<br />
6 <strong>Test</strong> Program<br />
<strong>MAN</strong> <strong>Diesel</strong> & Turbo has established a<br />
comprehensive test program stretching<br />
over the next three years. Fortun<strong>at</strong>ely,<br />
the rebuilding of the test engine to ME-<br />
<strong>GI</strong> gas oper<strong>at</strong>ion will not restrict tests<br />
running on diesel fuels as the test en-<br />
gine can inherently change over be-<br />
tween the two types of fuels. <strong>Test</strong>s are<br />
planned to commence in March 2011.<br />
1. Verific<strong>at</strong>ion of test set-up<br />
2. Confirm<strong>at</strong>ion of system for basic gas<br />
oper<strong>at</strong>ion and performance tests.<br />
One very interesting target is to de-<br />
termine the lower limits for pilot-oil<br />
volume and the minimum engine-<br />
load <strong>at</strong> which the engine can oper<strong>at</strong>e<br />
in gas-burning mode.<br />
17 <strong>The</strong> <strong>4T50ME</strong>-<strong>GI</strong> <strong>Test</strong> <strong>Engine</strong> <strong>at</strong> <strong>MAN</strong> <strong>Diesel</strong> & Turbo’s Copenhagen <strong>Test</strong> Centre<br />
3. Subsequently, a series of gas param-<br />
eter tests are planned covering:<br />
emission and performance<br />
combustion optimis<strong>at</strong>ion<br />
verific<strong>at</strong>ion of Tier-II setup<br />
parameter vari<strong>at</strong>ion for Tier-III setup.<br />
Both Tier-II and Tier-III tests will be per-<br />
formed with EGR and/or WIF.<br />
<strong>The</strong> potential for CO2 and SO x emis-<br />
sions reduction by using LNG instead<br />
of HFO has garnered significant sup-<br />
port from the EU for the test program<br />
through the so-called “HELIOS” project.<br />
Year / Quarter 2009 2010 2011 2012 2013<br />
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4<br />
ME-<strong>GI</strong> concept<br />
<strong>Test</strong> rig TS50ME-<strong>GI</strong><br />
<strong>Test</strong> Rig Start<br />
<strong>Test</strong> & Optimiz<strong>at</strong>ion<br />
Conversion <strong>4T50ME</strong>-<strong>GI</strong><br />
Decision full Scale <strong>Test</strong><br />
Agreement DSME<br />
Agreement HHIEMD<br />
Gas Injection & <strong>Engine</strong> Control System; <strong>GI</strong>-ECS<br />
Prepar<strong>at</strong>ion<br />
Design Order (DSO)<br />
Evalu<strong>at</strong>ion<br />
QG Letter of intent<br />
Applic<strong>at</strong>ion<br />
Full grant obtained<br />
Fig. 16: A Gant diagram showing the test program for a retrofit conversion to LNG-<br />
Cont.<br />
Tier II <strong>Test</strong> Cont. Tier III <strong>Test</strong><br />
<strong>Engine</strong> Start Tier II verifik<strong>at</strong>ion<br />
Customer Demonstr<strong>at</strong>ion<br />
Start integr<strong>at</strong>ion test <strong>4T50ME</strong>-<strong>GI</strong><br />
First Order ME-<strong>GI</strong><br />
QG Order Yes/No<br />
Execution<br />
Cont.<br />
Tier III<br />
verifik<strong>at</strong>ion<br />
ME-<strong>GI</strong> retrofit (46x 2x6/7S70ME-<strong>GI</strong>)