each <strong>the</strong> IOT&E, WIN-T Increment<br />
2 completed its Limited<br />
User Test in 2009, which led <strong>to</strong> a<br />
successful Miles<strong>to</strong>ne C decision in early<br />
February 2010 and subsequently a Low<br />
Rate Initial Production contract award.<br />
This was followed by a contrac<strong>to</strong>r test, and<br />
<strong>the</strong> WIN-T Increment 2 Production Qualification<br />
Test-Government (PQT-G), which<br />
was <strong>the</strong> major developmental test leading<br />
<strong>to</strong> <strong>the</strong> IOT&E. The PQT-G, concluded on<br />
August 5, 2011, and was <strong>the</strong> largest instrumented<br />
test ever held at <strong>the</strong> Aberdeen<br />
Test Center, Aberdeen Proving Ground,<br />
Md. This test was completed utilizing WIN-<br />
T Increment 2 hardware and software<br />
installed in tactical vehicles spread out<br />
over four geographically dispersed sites –<br />
Aberdeen, Md.; Taun<strong>to</strong>n, Mass.; Fort Gordon,<br />
Ga.; and Fort Bliss, Texas. Shortly<br />
after <strong>the</strong> PQT-G, <strong>the</strong> program completed a<br />
Logistics Demo <strong>to</strong> review installation, troubleshooting<br />
and maintenance procedures.<br />
A successful three-week Cold Wea<strong>the</strong>r<br />
Natural Environments Testing for WIN-T<br />
WIN-T<br />
Increment<br />
1 fielding is<br />
100 percent<br />
complete<br />
<strong>2012</strong> annual report <strong>to</strong> <strong>the</strong> stakeholders<br />
Increment 2 was conducted in<br />
January at Fort Greely, Alaska.<br />
The testing included several on-<strong>the</strong>move<br />
threads, at-<strong>the</strong>-halt deployments and<br />
s<strong>to</strong>rages of <strong>the</strong> communications equipment<br />
in extreme cold wea<strong>the</strong>r that dipped down<br />
<strong>to</strong> negative 35 degrees. The program has<br />
also completed interoperability testing at <strong>the</strong><br />
Central Technical Support Facility and Joint<br />
Interoperability Test Command. Finally, in<br />
preparation for <strong>the</strong> IOT&E, Soldiers conducted<br />
10 weeks of new equipment training<br />
beginning in January.<br />
WIN-T Increment 2 will be a primary<br />
component of <strong>the</strong> <strong>Army</strong>’s CS fielding<br />
and is planned for delivery <strong>to</strong> division<br />
headquarters and brigade combat teams<br />
where <strong>the</strong> on-<strong>the</strong>-move capability is vital.<br />
“Infantry and armor battalions and<br />
companies are maneuver units that require<br />
mobility, so <strong>the</strong>ir ability <strong>to</strong> communicate<br />
on-<strong>the</strong>-move is critical,” Collins said.<br />
“WIN-T Increment 2 provides that needed<br />
on-<strong>the</strong>-move capability. It’s going <strong>to</strong> bring<br />
a lot <strong>to</strong> <strong>the</strong> fight.”<br />
WIN-T Increment 3, which is still in <strong>the</strong> development<br />
phase, continues <strong>the</strong> evolution of “full” on-<strong>the</strong>-move<br />
networking capabilities. WIN-T Increment 3 is making<br />
advancements in achieving full Network Operations, <strong>the</strong><br />
S6’s <strong>to</strong>ol <strong>to</strong> command and control <strong>the</strong> network, and it also<br />
continues developmental testing on <strong>the</strong> JC4ISR radio,<br />
which makes great strides in improving throughput<br />
range and capacity while reducing size, weight, and<br />
power requirements. One of <strong>the</strong> premier components<br />
of WIN-T Increment 3 is <strong>the</strong> addition of an aerial tier<br />
layer <strong>to</strong> <strong>the</strong> WIN-T architecture. Project Manager WIN-T<br />
continues <strong>to</strong> develop and test a communication package<br />
<strong>to</strong> attach <strong>to</strong> an aerial platform that will offload network<br />
communications from satellite transponders <strong>to</strong> <strong>the</strong><br />
aerial tier, enhancing <strong>the</strong> reliability of <strong>the</strong> network. With<br />
<strong>the</strong> addition of <strong>the</strong> air tier, <strong>the</strong> Soldier will <strong>the</strong>n possess a<br />
three-tiered communication network (terrestrial, air and<br />
celestial), providing maximum flexibility and connectivity<br />
in support of full spectrum combat operations. WIN-T<br />
Increment 3 is currently on schedule for a fiscal year<br />
2015 Miles<strong>to</strong>ne C decision and operational testing in <strong>the</strong><br />
2018 timeframe.<br />