26.03.2013 Views

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PEO</strong> <strong>C3T</strong> FY12 FUNDING ($ in K)*<br />

Joint Capabilities<br />

Release, <strong>the</strong><br />

softwareenhanced<br />

version of<br />

FBCB2/<br />

Blue Force<br />

Tracking, was<br />

fielded <strong>to</strong> <strong>the</strong> 2nd<br />

Infantry Division and<br />

formations of <strong>the</strong> 8th <strong>Army</strong>,<br />

deployed in Korea. It marked<br />

<strong>the</strong> first time Soldiers outside<br />

of evaluation and testing were<br />

equipped with <strong>the</strong> system.<br />

maY<br />

The 10,000th Enclosure<br />

Ceremony for Power<br />

Distribution Illumination<br />

System, Electrical (PDISE)<br />

was held in Reading, PA.<br />

PM Mobile Electric Power<br />

held its fifth annual user<br />

conference for power<br />

professionals from across<br />

<strong>the</strong> joint services. The<br />

keynote speakers were<br />

Maj. Gen. N. Lee S. Price,<br />

<strong>PEO</strong> for <strong>C3T</strong>, and Sharon<br />

Burke, <strong>the</strong> assistant<br />

secretary of Defense<br />

for Operational<br />

Energy Plans<br />

and Programs.<br />

<strong>2012</strong> annual report <strong>to</strong> <strong>the</strong> stakeholders<br />

finAnciAl SummARy<br />

PROJECTED FY13 FUNDING ($ in K)*<br />

Funding is "expected" values for OPA/RDTE in FY12 as of 29 Aug. Funding is APPN request in FY13 per PB<br />

Source: FY12 "Expected APPN" as of 28 Aug. FY13 reflects FY13 PB dated 6 Jan 12 Less MEP<br />

Building 6010<br />

was formally<br />

dedicated <strong>to</strong><br />

Col. William<br />

R. Blair,<br />

known as <strong>the</strong><br />

fa<strong>the</strong>r of <strong>Army</strong><br />

radar. Col. Blair’s<br />

daughter-in-law, Pat<br />

Blair, and extended<br />

family attended<br />

<strong>the</strong> ceremony<br />

and a subsequent<br />

APG campus <strong>to</strong>ur<br />

featuring current<br />

radar capabilities.<br />

OMA, $6,404<br />

OMA Supp, $323,047<br />

RDTE, $478,875<br />

OPA, $1,735,715<br />

OPA Supp, $270,816<br />

TOTAL: $2,814,857<br />

OMA, $133,291<br />

OMA Supp, $163,600<br />

RDTE, $481,275<br />

OPA, $2,271,407<br />

OPA Supp, $31,230<br />

TOTAL: $3,080,803<br />

AMMPS First Unit<br />

Equipped: The<br />

4th Infantry<br />

Division at<br />

Ft. Carson,<br />

Colo. became<br />

<strong>the</strong> First Unit<br />

Equipped with<br />

Advanced Medium<br />

Mobile Power Systems<br />

(AMMPS), a line of<br />

leaner, fuel-saving<br />

genera<strong>to</strong>rs.<br />

TOP FY12 RDTE FUNDING*<br />

TOP FY12 OPA FUNDING*<br />

PM WIN-T, 46%<br />

PM MC, 9%<br />

PM JBC-P, 10%<br />

PM MEP, 4%<br />

PdM NS, 5%<br />

JTRS, 21%<br />

PD COMSEC, 2%<br />

PD TNI, 2%<br />

Spares, 1%<br />

TOP FY13 RDTE FUNDING*<br />

TOP FY13 OPA FUNDING*<br />

<strong>PEO</strong> <strong>C3T</strong> participated<br />

in <strong>the</strong> <strong>Army</strong>’s Semiannual<br />

Network<br />

Integration Evaluation<br />

12.2, <strong>the</strong> <strong>Army</strong>’s largest<br />

field exercise <strong>to</strong> date.<br />

Cryp<strong>to</strong>graphic and key<br />

management systems,<br />

mission command<br />

applications, Joint<br />

Capabilities Release<br />

(JCR), and WIN-T<br />

Increment 2 were<br />

among <strong>the</strong><br />

systems<br />

evaluated.<br />

PM WIN-T, 41%<br />

PM MC, 29%<br />

PM JBC-P, 13%<br />

PM MEP, 2%<br />

JTRS, 10%<br />

PD COMSEC, 2%<br />

<strong>Army</strong> Tac C2 Sys Eng, 3%<br />

PM WIN-T, 62%<br />

PM MC, 25%<br />

PM JBC-P, 4%<br />

PM MNVR, 3%<br />

PD COMSEC, 2%<br />

<strong>Army</strong> Tac C2 Sys Eng, 4%<br />

PM WIN-T, 50%<br />

PM MC, 7%<br />

PM JBC-P, 6%<br />

PM TR, 22%<br />

PM AMF, 3%<br />

PM MNVR, 4%<br />

PD COMSEC, 3%<br />

PD TNI, 3%<br />

Spares, 2%<br />

WIN-T Increment 2<br />

completed its Initial<br />

Operational Test and<br />

Evaluation (IOT&E) over<br />

three weeks in conjunction<br />

with <strong>the</strong> <strong>Army</strong>’s Network<br />

Integration Evaluation 12.2.<br />

The bulk of <strong>the</strong> IOT&E was<br />

held at White Sands Missile<br />

Range, N.M; however, WIN-T<br />

Increment 2 nodes were<br />

spread across 2,000 miles<br />

of <strong>the</strong> U.S.<br />

Program ExEcutivE officE command control communications-tactical // // 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!