2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PEO</strong> <strong>C3T</strong> FY12 FUNDING ($ in K)*<br />
Joint Capabilities<br />
Release, <strong>the</strong><br />
softwareenhanced<br />
version of<br />
FBCB2/<br />
Blue Force<br />
Tracking, was<br />
fielded <strong>to</strong> <strong>the</strong> 2nd<br />
Infantry Division and<br />
formations of <strong>the</strong> 8th <strong>Army</strong>,<br />
deployed in Korea. It marked<br />
<strong>the</strong> first time Soldiers outside<br />
of evaluation and testing were<br />
equipped with <strong>the</strong> system.<br />
maY<br />
The 10,000th Enclosure<br />
Ceremony for Power<br />
Distribution Illumination<br />
System, Electrical (PDISE)<br />
was held in Reading, PA.<br />
PM Mobile Electric Power<br />
held its fifth annual user<br />
conference for power<br />
professionals from across<br />
<strong>the</strong> joint services. The<br />
keynote speakers were<br />
Maj. Gen. N. Lee S. Price,<br />
<strong>PEO</strong> for <strong>C3T</strong>, and Sharon<br />
Burke, <strong>the</strong> assistant<br />
secretary of Defense<br />
for Operational<br />
Energy Plans<br />
and Programs.<br />
<strong>2012</strong> annual report <strong>to</strong> <strong>the</strong> stakeholders<br />
finAnciAl SummARy<br />
PROJECTED FY13 FUNDING ($ in K)*<br />
Funding is "expected" values for OPA/RDTE in FY12 as of 29 Aug. Funding is APPN request in FY13 per PB<br />
Source: FY12 "Expected APPN" as of 28 Aug. FY13 reflects FY13 PB dated 6 Jan 12 Less MEP<br />
Building 6010<br />
was formally<br />
dedicated <strong>to</strong><br />
Col. William<br />
R. Blair,<br />
known as <strong>the</strong><br />
fa<strong>the</strong>r of <strong>Army</strong><br />
radar. Col. Blair’s<br />
daughter-in-law, Pat<br />
Blair, and extended<br />
family attended<br />
<strong>the</strong> ceremony<br />
and a subsequent<br />
APG campus <strong>to</strong>ur<br />
featuring current<br />
radar capabilities.<br />
OMA, $6,404<br />
OMA Supp, $323,047<br />
RDTE, $478,875<br />
OPA, $1,735,715<br />
OPA Supp, $270,816<br />
TOTAL: $2,814,857<br />
OMA, $133,291<br />
OMA Supp, $163,600<br />
RDTE, $481,275<br />
OPA, $2,271,407<br />
OPA Supp, $31,230<br />
TOTAL: $3,080,803<br />
AMMPS First Unit<br />
Equipped: The<br />
4th Infantry<br />
Division at<br />
Ft. Carson,<br />
Colo. became<br />
<strong>the</strong> First Unit<br />
Equipped with<br />
Advanced Medium<br />
Mobile Power Systems<br />
(AMMPS), a line of<br />
leaner, fuel-saving<br />
genera<strong>to</strong>rs.<br />
TOP FY12 RDTE FUNDING*<br />
TOP FY12 OPA FUNDING*<br />
PM WIN-T, 46%<br />
PM MC, 9%<br />
PM JBC-P, 10%<br />
PM MEP, 4%<br />
PdM NS, 5%<br />
JTRS, 21%<br />
PD COMSEC, 2%<br />
PD TNI, 2%<br />
Spares, 1%<br />
TOP FY13 RDTE FUNDING*<br />
TOP FY13 OPA FUNDING*<br />
<strong>PEO</strong> <strong>C3T</strong> participated<br />
in <strong>the</strong> <strong>Army</strong>’s Semiannual<br />
Network<br />
Integration Evaluation<br />
12.2, <strong>the</strong> <strong>Army</strong>’s largest<br />
field exercise <strong>to</strong> date.<br />
Cryp<strong>to</strong>graphic and key<br />
management systems,<br />
mission command<br />
applications, Joint<br />
Capabilities Release<br />
(JCR), and WIN-T<br />
Increment 2 were<br />
among <strong>the</strong><br />
systems<br />
evaluated.<br />
PM WIN-T, 41%<br />
PM MC, 29%<br />
PM JBC-P, 13%<br />
PM MEP, 2%<br />
JTRS, 10%<br />
PD COMSEC, 2%<br />
<strong>Army</strong> Tac C2 Sys Eng, 3%<br />
PM WIN-T, 62%<br />
PM MC, 25%<br />
PM JBC-P, 4%<br />
PM MNVR, 3%<br />
PD COMSEC, 2%<br />
<strong>Army</strong> Tac C2 Sys Eng, 4%<br />
PM WIN-T, 50%<br />
PM MC, 7%<br />
PM JBC-P, 6%<br />
PM TR, 22%<br />
PM AMF, 3%<br />
PM MNVR, 4%<br />
PD COMSEC, 3%<br />
PD TNI, 3%<br />
Spares, 2%<br />
WIN-T Increment 2<br />
completed its Initial<br />
Operational Test and<br />
Evaluation (IOT&E) over<br />
three weeks in conjunction<br />
with <strong>the</strong> <strong>Army</strong>’s Network<br />
Integration Evaluation 12.2.<br />
The bulk of <strong>the</strong> IOT&E was<br />
held at White Sands Missile<br />
Range, N.M; however, WIN-T<br />
Increment 2 nodes were<br />
spread across 2,000 miles<br />
of <strong>the</strong> U.S.<br />
Program ExEcutivE officE command control communications-tactical // // 37