26.03.2013 Views

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2012</strong> annual report <strong>to</strong> <strong>the</strong> stakeholders<br />

1992-1995 1993-1997 1997-2001 2001-2007 2007-2009 2009-Present<br />

BG Gust<br />

<strong>PEO</strong> COMM<br />

1993<br />

<strong>PEO</strong> leads <strong>the</strong><br />

<strong>Army</strong>’s “Battlefield<br />

Digitization” initiative<br />

and <strong>the</strong> digitization<br />

of heavy Forces.<br />

TQGs began fielding.<br />

1st Cavalry Division<br />

received Advanced Field<br />

Artillery Tactical Data<br />

System (AFATDS) .<br />

MSE final unit fielding.<br />

1994<br />

<strong>PEO</strong> leads digitization<br />

development in<br />

response <strong>to</strong> American<br />

Soldiers in Macedonia,<br />

providing real-time<br />

vehicle tracking (Blue<br />

Force Tracking)<br />

capability.<br />

MG Campbell<br />

<strong>PEO</strong> CCS<br />

<strong>PEO</strong> C3S<br />

1995<br />

<strong>PEO</strong> C3S is formed<br />

from <strong>PEO</strong> COMM and<br />

<strong>PEO</strong> CCS. This merger<br />

sought <strong>to</strong> integrate <strong>the</strong><br />

acquisition management<br />

of C3I Systems for <strong>the</strong><br />

digitized battlefield.<br />

<strong>PEO</strong> begins developing<br />

<strong>Army</strong> Battle Command<br />

Systems (ABCS).<br />

1996<br />

Enhanced Position<br />

Location and <strong>Report</strong>ing<br />

System (EPLRS) were<br />

initially fielded <strong>to</strong> <strong>the</strong><br />

U.S. <strong>Army</strong>. EPLRS is a<br />

mobile ad-hoc network,<br />

providing jam-resistant<br />

data communications<br />

over <strong>the</strong> modern battle<br />

space. Additionally,<br />

EPLRS provides GPS<br />

for Blue Force Tracking.<br />

MG Boutelle<br />

<strong>PEO</strong> C3S<br />

19 98<br />

<strong>PEO</strong> C3S’ Knowledge<br />

Center is activated as<br />

one of <strong>the</strong> U.S. <strong>Army</strong>’s<br />

first three original pilot<br />

programs.<br />

The Commander,<br />

US <strong>Army</strong> Europe<br />

requested that <strong>PEO</strong><br />

C3S evaluate <strong>the</strong> use of<br />

Force XXI systems and<br />

technologies <strong>to</strong> enhance<br />

<strong>the</strong> capabilities of <strong>the</strong><br />

stabilization forces in<br />

Bosnia and Kosovo.<br />

1999-2000<br />

The <strong>Army</strong> begins<br />

fielding Force XXI Battle<br />

Command Brigade and<br />

Below (FBCB2).<br />

MG Mazzucchi<br />

<strong>PEO</strong> C3S<br />

<strong>PEO</strong> <strong>C3T</strong><br />

2001<br />

<strong>PEO</strong> supports World<br />

Trade Center rescue<br />

efforts and Pentagon<br />

rebuild.<br />

2003<br />

4th Infantry Division,<br />

deployed <strong>to</strong> Operation<br />

Iraqi Freedom with<br />

ABCS and digital tactical<br />

operations centers.<br />

2004<br />

An Operational Needs<br />

Statement indicated that<br />

<strong>the</strong> mission command<br />

capabilities of <strong>the</strong> 3rd<br />

Infantry Division (ID)<br />

were “insufficient” after<br />

Iraq. As a result, <strong>the</strong><br />

<strong>Army</strong> equipped 3rd ID<br />

with Joint Network Node-<br />

Network (now called<br />

WIN-T Increment 1).<br />

2005<br />

<strong>PEO</strong> <strong>C3T</strong> contributes<br />

power genera<strong>to</strong>rs<br />

and satellite<br />

telecommunications <strong>to</strong><br />

hurricane Katrina relief<br />

workers.<br />

MG Justice<br />

<strong>PEO</strong> <strong>C3T</strong><br />

2007<br />

Joint Incident Site<br />

Communications<br />

Capability (JISCC),<br />

which enables<br />

rapid, interagency<br />

communications<br />

during an emergency<br />

is deployed <strong>to</strong> assist<br />

during a series of<br />

wildfires that raged<br />

across sou<strong>the</strong>rn<br />

California.<br />

2008<br />

Project Direc<strong>to</strong>r<br />

Counter-Rocket,<br />

Artillery and Mortar,<br />

<strong>the</strong>n assigned <strong>to</strong> <strong>PEO</strong><br />

<strong>C3T</strong>, allows <strong>the</strong> <strong>Army</strong><br />

<strong>to</strong> achieve its 100th<br />

successful intercept of<br />

a rocket or mortar round<br />

fired at high-value<br />

Multi-National Corps-<br />

Iraq assets.<br />

MG Price<br />

<strong>PEO</strong> <strong>C3T</strong><br />

2010<br />

The Joint Incident<br />

Site Communications<br />

Capability (JISCC) is<br />

deployed in response <strong>to</strong><br />

<strong>the</strong> earthquake in haiti.<br />

<strong>PEO</strong> <strong>C3T</strong> was officially<br />

moved <strong>to</strong> Aberdeen<br />

Proving Ground, Md.<br />

from Fort Monmouth,<br />

N.J.<br />

2 011<br />

Soldiers serving in<br />

Afghanistan receive<br />

<strong>the</strong> Joint Tactical<br />

Radio Systems (JTRS)<br />

Rifleman Radio for a<br />

combat evaluation.<br />

<strong>PEO</strong> <strong>C3T</strong> and its<br />

partners in <strong>the</strong> <strong>Army</strong><br />

C4ISR Center of<br />

Excellence community<br />

mark <strong>the</strong> conclusion<br />

of Base Realignment<br />

and Closure process,<br />

<strong>the</strong> closure of Fort<br />

Monmouth and <strong>the</strong><br />

beginning of a new era<br />

of collaboration and<br />

integration at <strong>the</strong> C4ISR<br />

Center of Excellence<br />

at APG.<br />

Program ExEcutivE officE command control communications-tactical // 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!