2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
2012 Annual Report to the Stakeholders - PEO C3T - U.S. Army
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2012</strong> annual report <strong>to</strong> <strong>the</strong> stakeholders<br />
comSec helpS opeRAtionAl<br />
foRce Achieve efficiencieS<br />
Project Direc<strong>to</strong>r Communications<br />
Security (PD COMSEC), assigned <strong>to</strong><br />
<strong>PEO</strong> <strong>C3T</strong>, is leading an <strong>Army</strong>-wide effort<br />
<strong>to</strong> streamline <strong>the</strong> procurement and<br />
deployment of equipment that secures<br />
and encrypts data on <strong>the</strong> <strong>Army</strong>’s tactical<br />
network.<br />
Since PD COMSEC was<br />
chartered in September<br />
2010, <strong>the</strong> organization has<br />
realized more than $124<br />
million in cost savings<br />
and avoidance, said Chris<br />
Manning, project direc<strong>to</strong>r<br />
for COMSEC.<br />
Prior <strong>to</strong> <strong>the</strong> establishment of<br />
PD COMSEC, <strong>the</strong> <strong>Army</strong> lacked a holistic<br />
approach <strong>to</strong> replacing legacy cryp<strong>to</strong>graphic<br />
equipment in <strong>the</strong> field with new,<br />
modernized equipment. Individual units<br />
and system owners would instead request<br />
devices on an as-needed basis,<br />
which was often inefficient in providing<br />
<strong>the</strong> right number of systems <strong>to</strong> <strong>the</strong> right<br />
Joint<br />
Tactical<br />
Network<br />
Operations Toolkit<br />
(JTNT) will simplify<br />
operations<br />
units at <strong>the</strong> right time.<br />
As part of a new strategy, PD COM-<br />
SEC will lead a detailed, <strong>Army</strong>-wide<br />
equipment assessment in order <strong>to</strong> plan<br />
COMSEC purchases over several years<br />
for <strong>the</strong> operational force. The organization<br />
will field <strong>the</strong> reserve of equipment<br />
that has already been manufactured<br />
in order <strong>to</strong> provide Soldiers<br />
with modernized de-<br />
vices, while at <strong>the</strong> same time<br />
aligning future purchases so<br />
<strong>the</strong>y meet <strong>the</strong> <strong>Army</strong>’s longerterm<br />
priorities.<br />
This new method better aligns<br />
system deliveries with mission<br />
requirements, and significantly lowers<br />
<strong>the</strong> overall funding needed.<br />
“This situation illustrates how <strong>the</strong> <strong>Army</strong><br />
can benefit from <strong>the</strong> partnership between<br />
COMSEC experts, project managers<br />
and units <strong>to</strong> make informed decisions<br />
about how best <strong>to</strong> secure <strong>the</strong>ir systems,”<br />
Manning said.<br />
This strategy has already<br />
yielded benefits <strong>to</strong> <strong>the</strong> field<br />
in recent months. PD COM-<br />
SEC used new equipment<br />
in s<strong>to</strong>ck at Tobyhanna <strong>Army</strong><br />
Depot (TyAD), Pa., <strong>to</strong> supply<br />
several units that had initially<br />
planned <strong>to</strong> use <strong>the</strong>ir own<br />
funds <strong>to</strong> order more.<br />
The COMSEC division<br />
of TyAD was awarded <strong>the</strong><br />
Shingo Silver Medallion in<br />
<strong>2012</strong> for <strong>the</strong>ir efforts <strong>to</strong> improve<br />
<strong>the</strong> Depot’s equipment<br />
receiving process. The number<br />
of days it <strong>to</strong>ok <strong>to</strong> induct<br />
equipment dropped from 57<br />
days <strong>to</strong> 28.<br />
While initially focused on<br />
<strong>the</strong> operational force, <strong>the</strong><br />
effort will ultimately streamline<br />
COMSEC procurement<br />
for <strong>the</strong> generating force and<br />
<strong>Army</strong> installations as well.<br />
The new COMSEC Management<br />
Policy, which was signed<br />
by <strong>Army</strong> Acquisition Executive<br />
Heidi Shyu on March 1, gives<br />
Project Direc<strong>to</strong>r COMSEC<br />
responsibility for leading <strong>the</strong><br />
effort <strong>to</strong> procure and field <strong>the</strong><br />
capabilities that secure and<br />
encrypt data on <strong>the</strong> <strong>Army</strong>’s<br />
tactical network.<br />
Under <strong>the</strong> new policy, all<br />
<strong>Army</strong> program executive offices<br />
will coordinate with PD<br />
COMSEC on <strong>the</strong> planning, use<br />
and management of all COM-<br />
SEC components and systems.<br />
By centralizing <strong>the</strong>se<br />
technologies under one organization,<br />
<strong>the</strong> <strong>Army</strong> creates<br />
a focal point for program offices<br />
and system integra<strong>to</strong>rs<br />
<strong>to</strong> access COMSEC expertise.<br />
Program ExEcutivE officE command control communications-tactical // 7