26.03.2013 Views

Table of Tables - METRANS Transportation Center

Table of Tables - METRANS Transportation Center

Table of Tables - METRANS Transportation Center

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Evaluating the Feasibility <strong>of</strong> Electrified Rail at the<br />

Port <strong>of</strong> LA/LB<br />

<strong>Table</strong> 1- Capital Cost Breakdown <strong>of</strong> the BART Third Rail System<br />

A third rail system estimate that w as an act ual poposed retr<strong>of</strong>it to a “ Diesel-pull”<br />

passenger s ystem is the C alTrain system which r uns f rom t he S an J ose a rea t o S an<br />

Fansisco. The fourth column <strong>of</strong> <strong>Table</strong> 2 from that proposal sites the cost <strong>of</strong> electrification<br />

as $600k/mile ($920k/mile in 2008 dollars).<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!