Evaluating the Feasibility <strong>of</strong> Electrified Rail at the<br />
Port <strong>of</strong> LA/LB<br />
<strong>Table</strong> 1- Capital Cost Breakdown <strong>of</strong> the BART Third Rail System<br />
A third rail system estimate that w as an act ual poposed retr<strong>of</strong>it to a “ Diesel-pull”<br />
passenger s ystem is the C alTrain system which r uns f rom t he S an J ose a rea t o S an<br />
Fansisco. The fourth column <strong>of</strong> <strong>Table</strong> 2 from that proposal sites the cost <strong>of</strong> electrification<br />
as $600k/mile ($920k/mile in 2008 dollars).<br />