Table of Tables - METRANS Transportation Center
Table of Tables - METRANS Transportation Center
Table of Tables - METRANS Transportation Center
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Evaluating the Feasibility <strong>of</strong> Electrified Rail at the<br />
Port <strong>of</strong> LA/LB<br />
<strong>Table</strong> <strong>of</strong> Figures<br />
Figure 1- Several Forms <strong>of</strong> Third Rail – Shoe Contact in Order <strong>of</strong> Safety and Expense<br />
(least to most safe and expensive) ...................................................................... 5<br />
Figure 2- Example <strong>of</strong> a Bottom Contact Shoe ................................................................ 6<br />
Figure 3- Pantograph on the Acela Contacting Power Wire Supported from Overhead<br />
Caternary (“Messenger Wire”) by “Droppers” ................................................... 7<br />
Figure 4- Modern Singe Phase AC Locomotive with Single Phase AC Caternary Power<br />
Converted to 3-Phase Power For the Motors (Inset) .......................................... 8<br />
Figure 5- Overhead Contact System Two Track ............................................................ 9<br />
Arrangement with <strong>Center</strong> Pole Construction .................................................................. 9<br />
Figure 6- Overhead Contact System Typical Portal Arrangement ................................. 9<br />
Figure 7- Typical “Deisel Electric” Locomotive Prevalent on US Freight and<br />
Passenger Rail ................................................................................................... 10<br />
Figure 8- Examples <strong>of</strong> Hybrid Locomotives for Use on Electrified Rail ..................... 11<br />
Figure 9- Typical Layout <strong>of</strong> a Third Rail Power Distribution System ......................... 12<br />
Figure 10- Detailed Schematic <strong>of</strong> Proposed 25 kV Overhead Caternary Electification13<br />
<strong>Table</strong> <strong>of</strong> <strong>Table</strong>s<br />
<strong>Table</strong> 1- Capital Cost Breakdown <strong>of</strong> the BART Thrird Rail System ........................... 17<br />
<strong>Table</strong> 2-Third Rail Electrification Estimate for CalTrain ............................................. 18<br />
<strong>Table</strong> 3- Rough Order <strong>of</strong> Magnitude (ROME) analysis <strong>of</strong> the Oshawa to Hamilton<br />
Station section <strong>of</strong> the Toronto Lakeshore Line electrification retr<strong>of</strong>it ............. 19<br />
v