Figure 4: W<strong>at</strong>er Leak Detection Interface<br />

The oper<strong>at</strong>or c<strong>an</strong> set three kWh benchmarks allowing the division of a charge into four intervals (early melting, melting, early refining<br />

<strong>an</strong>d refining). For each of these intervals two thresholds are set, one for absolute hydrogen concentr<strong>at</strong>ion in the furnace <strong>an</strong>d the second<br />

is for the rel<strong>at</strong>ive concentr<strong>at</strong>ion of hydrogen with respect to carbon monoxide. Functionally, this system provides the flexibility to<br />

assign different thresholds for alarming depending on the various stages of the process. For example, during refining hydrogen levels<br />

<strong>an</strong>d the r<strong>at</strong>io of hydrogen to carbon monoxide are typically lower th<strong>an</strong> during the initial stages of melting. This is due to the higher<br />

r<strong>at</strong>e of meth<strong>an</strong>e usage during melting <strong>an</strong>d also due to the flashing of oils from the scrap or the presence of w<strong>at</strong>er in the charge th<strong>at</strong> is<br />

not present during refining.<br />

EFSOP ® RESULTS<br />

Typically, the benefits due to EFSOP ® optimiz<strong>at</strong>ion are determined by comparison to a represent<strong>at</strong>ive historical baseline. Ideally, a<br />

long term baseline is used to account for seasonal affects. At CMC Texas, the injectors were ch<strong>an</strong>ged <strong>at</strong> the end of 2005. Some<br />

perform<strong>an</strong>ce benefits were noted during this period th<strong>at</strong> was not <strong>at</strong>tributable to EFSOP ® . Therefore the baseline period was based<br />

only on the oper<strong>at</strong>ion during the whole of J<strong>an</strong>uary 2006. Figures 5, 6, 7 <strong>an</strong>d 8 are, respectively, the average monthly specific<br />

consumptions of electrical energy, n<strong>at</strong>ural gas, oxygen, <strong>an</strong>d carbon per inventory cast ton. The plots contain the averages for Oct-05,<br />

Nov-05, Dec-05, the baseline month (J<strong>an</strong>-06) <strong>an</strong>d the EFSOP ® evalu<strong>at</strong>ion period (February 20 th to march 19 th , 2006).