27.03.2013 Views

ExcAVATIONs

ExcAVATIONs

ExcAVATIONs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Working near high-voltage lines<br />

Before you do any work within 10 feet of a high-voltage power line,<br />

notify the utility that controls the line at least two business days before<br />

you begin. If you don’t know who controls the line, any utility can<br />

help you.<br />

You’ll need to tell the utility the location, what work you need to do,<br />

and when you need to do it.<br />

The utility will help you with tasks such as the following to ensure that<br />

you do the work safely:<br />

• Coordinate work schedules<br />

• Identify temporary mechanical barriers that prevent<br />

contact with the lines<br />

• De-energize and ground the lines<br />

• Temporarily raise or move the lines<br />

What happens if you don’t notify the utility?<br />

You’re responsible for all damages and costs that result from an electrical<br />

accident. There’s also a penalty of up to $70,000 for each offense in<br />

addition to the cost of injuries and repairs.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!