27.03.2013 Views

REPS 4: Farmers Handbook - Department of Agriculture

REPS 4: Farmers Handbook - Department of Agriculture

REPS 4: Farmers Handbook - Department of Agriculture

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

● Do not allow cattle to get within 2.5 metres <strong>of</strong> watercourses by the end <strong>of</strong> your first year<br />

in <strong>REPS</strong> or in any year after that. Fences must be at least 2.5 metres from the top <strong>of</strong> the<br />

bank <strong>of</strong> the watercourse. You do not have to do this on land that is rented or leased, with<br />

less than 5 years to run, at the start <strong>of</strong> your <strong>REPS</strong> contract.<br />

● You must not use pesticides or organic or chemical fertilisers within 2.5 metres <strong>of</strong> the<br />

watercourse.<br />

Option 3B — Exclude all bovine access to watercourses.<br />

This option will maintain and improve water quality by preventing the watercourse from being<br />

damaged at drinking points. If you choose this option you must do the following things and<br />

any other works your planner includes in your plan.<br />

● Do not allow cattle any access to drinking points on any watercourses on your farm.<br />

● Provide at least two piped drinking troughs. These troughs should be located in the field<br />

or fields adjoining the watercourse or watercourses in question.<br />

Option 3C — Use <strong>of</strong> Planted Buffer Zones.<br />

This option will protect water quality by reducing the risk <strong>of</strong> nutrient loss to watercourses. If you<br />

choose this option you must do the following things and any other works your planner includes<br />

in your plan.<br />

● Plant 1% <strong>of</strong> your holding – up to a maximum <strong>of</strong> 2,000 square metres – with buffer strips<br />

along the watercourses identified in your plan.<br />

● Plant a buffer strip at least 5 metres wide with willow and or alder or other suitable<br />

species. The buffer strip should not come any closer than three metres from the top <strong>of</strong><br />

the bank <strong>of</strong> the watercourse. Plants must be spaced as follows: Willow 1.5m X 1m; Alder<br />

2m X 1.5m.<br />

● The site must be stock-pro<strong>of</strong>ed by the end <strong>of</strong> your first year in <strong>REPS</strong> and all planting must<br />

be finished by the end <strong>of</strong> the third year.<br />

When you and your planner are selecting sites for this option, remember the requirement to<br />

protect habitats under Measure 4, Natura 2000 sites, NHAs and commonages.<br />

MEASURE 3<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!