116 SUBMARINE CABLE LAYING AND REPAIRING.<br />

jockey pulley on a lever, with counterweight, presses down on<br />

the <strong>cable</strong>, giving it adhesion to the sheave, <strong>and</strong> so drawing it in.<br />

Two, <strong>and</strong> sometimes three, lines of <strong>cable</strong>s are drawn on board<br />

<strong>and</strong> coiled in tank at the same time. A high rate of 68 miles<br />

per day of 12 hours was attained in the shipment of the<br />

South American <strong>cable</strong> on board the " Silvertown."