<strong>Specification</strong> <strong>49</strong> <strong>Stone</strong> <strong>Mastic</strong> <strong>Asphalt</strong> <strong>for</strong> <strong>Airfields</strong> Appendix C – Guidance on Suitable Temperatures<br />
and Wind Speeds <strong>for</strong> Laying<br />
Figure C.2 – Acceptable weather conditions <strong>for</strong><br />
laying SMA with 70/100 bitumen<br />
Figure C.3 – Acceptable weather conditions <strong>for</strong><br />
laying SMA with 100/150 bitumen<br />
(NOTE 2. The descriptions “Should not lay” and “Can<br />
lay” apply to above and below the lines <strong>for</strong> the 35 mm<br />
thick layers, respectively. The lines <strong>for</strong> the 30 mm thick<br />
layers are not sufficiently high and some <strong>of</strong> those <strong>for</strong><br />
the 40 mm thick layers are not sufficiently low to<br />
accommodate doing the same <strong>for</strong> them.)<br />
(NOTE 3. The acceptable conditions are developed<br />
assuming 6 min is required <strong>for</strong> compaction. If adequate<br />
compaction can routinely achieved in less time, these<br />
curves can be move up whereas, if more time is<br />
needed <strong>for</strong> any reason, they should be moved down.)<br />
(NOTE 4. The lines <strong>for</strong> 30 mm thick layers are<br />
sufficiently close to the bottom right hand corner <strong>of</strong> the<br />
graphs to indicate that they can only be laid on still,<br />
warm days unless the time required <strong>for</strong> compaction can<br />
be reduced from 6 min.)<br />
July 2008 35