02.04.2013 Views

A Supplemental HCVF Assessment on the Sumatran Tiger ...

A Supplemental HCVF Assessment on the Sumatran Tiger ...

A Supplemental HCVF Assessment on the Sumatran Tiger ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FINAL REPORT <strong>Tiger</strong> <str<strong>on</strong>g>HCVF</str<strong>on</strong>g> <str<strong>on</strong>g>Supplemental</str<strong>on</strong>g> <str<strong>on</strong>g>Assessment</str<strong>on</strong>g> – Serapung FMU<br />

basins to <strong>the</strong> north and <strong>the</strong> south, it is predictable that <strong>the</strong> pressures <strong>on</strong> <strong>the</strong> landscape<br />

will increase dramatically as remaining forests and <strong>the</strong>ir intrinsic value is eroded.<br />

Figure 1. Locati<strong>on</strong> of <strong>the</strong> FMU in relati<strong>on</strong> to surrounding Siak-Pelalawan forest block<br />

derived from 2002 Landsat subsequently modified based <strong>on</strong> ground-truthing (Feb 2005).<br />

2.2 Descripti<strong>on</strong> of <strong>the</strong> Serapung FMU<br />

The Serapung Forest Management Unit (19,945 Ha) is comprised of two industrial<br />

timber c<strong>on</strong>cessi<strong>on</strong>s, PT. Satria Perkasa Agung (SPA or Serapung I) and PT. Mitra<br />

Hutan Jaya (MHJ or Serapung II), managed as a single entity by PT. Arara Abadi. The<br />

management objective of both districts is to provide wood fibre, from mixed tropical<br />

hardwood forests, to supply <strong>the</strong> PT Indah Kiat Pulp & Paper (IKPP) mill in Perawang<br />

over <strong>the</strong> short term, while providing a land-base for Acacia plantati<strong>on</strong>s over <strong>the</strong> l<strong>on</strong>ger<br />

term. Relatively small volumes of sawlogs are also sent to nearby sawmills.<br />

The c<strong>on</strong>cessi<strong>on</strong>s were approved by <strong>the</strong> Head (Bupati) of Pelalawan District, with<br />

licenses that allow for land-clearing of forest, establishment of canals and drainage<br />

ditches, and planting of Acacia crassicarpa for pulpwood producti<strong>on</strong>.<br />

A six to seven-year growing cycle is assumed for future Acacia crassicarpa productivity<br />

in this area, based up<strong>on</strong> an estimated MAI of 25 m3/ha. The first harvest of Acacia in<br />

FMU Serapung is due in 2010. At <strong>the</strong> present time <strong>the</strong> majority of remaining un-cleared<br />

forest, destined for felling and c<strong>on</strong>versi<strong>on</strong> to plantati<strong>on</strong>, is in <strong>the</strong> nor<strong>the</strong>rn secti<strong>on</strong>s of<br />

<strong>the</strong> FMU. This study focuses <strong>on</strong> remaining natural forests situated in <strong>the</strong> nor<strong>the</strong>rn half<br />

of <strong>the</strong> c<strong>on</strong>cessi<strong>on</strong> area within, and adjacent to, Serapung I district (11,404 ha).<br />

Acacia plantati<strong>on</strong>s occur in <strong>the</strong> HTI-designated producti<strong>on</strong> (Produksi) areas of <strong>the</strong><br />

c<strong>on</strong>cessi<strong>on</strong>. O<strong>the</strong>r designated forestland uses within <strong>the</strong> c<strong>on</strong>cessi<strong>on</strong> are for<br />

c<strong>on</strong>servati<strong>on</strong> (K<strong>on</strong>servasi), community livelihood (Kehidupan) and high-quality local<br />

tree species (Unggulan) – collectively referred to as “set-aside” forests (see Figure 2).<br />

<strong>Sumatran</strong> <strong>Tiger</strong> C<strong>on</strong>servati<strong>on</strong> Program Pg 8/68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!