03.04.2013 Views

URBAN TRANSPORT AND LAND USE IN PHNOM PENH

URBAN TRANSPORT AND LAND USE IN PHNOM PENH

URBAN TRANSPORT AND LAND USE IN PHNOM PENH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

K<strong>IN</strong>GDOM OF CAMBODIA<br />

<strong>URBAN</strong> <strong>TRANSPORT</strong><br />

<strong>AND</strong> L<strong>AND</strong> <strong>USE</strong> <strong>IN</strong> <strong>PHNOM</strong> <strong>PENH</strong>


Cambodia Location Map<br />

Land Area 181.035 sq Kms .<br />

Population : 13 Million<br />

National Roads : 4,165 km<br />

Provincial Roads: 3,615 km<br />

District Roads : 31,000 km


<strong>PHNOM</strong> <strong>PENH</strong><br />

CAPITAL CENTER


<strong>PHNOM</strong> <strong>PENH</strong><br />

Location Map


<strong>PHNOM</strong> <strong>PENH</strong> DISTRIC ADM<strong>IN</strong>ISTRATOR<br />

Dangkor<br />

-Center of politic and administration<br />

-Center of Economy and Trade<br />

-Culture, Education and Tourism<br />

Meanchey<br />

-Total area 438.91 Km²<br />

-Population 1,3M.<br />

-7 districts<br />

-76 communes


Comercial<br />

Industrial<br />

Agriculural<br />

Land Use<br />

Residentual<br />

Administration<br />

Garden & Open<br />

space<br />

Swamp Area<br />

Lakes & Rivers<br />

Total<br />

<strong>PHNOM</strong> <strong>PENH</strong><br />

L<strong>AND</strong> <strong>USE</strong><br />

1.92<br />

0.14<br />

0.36<br />

-<br />

Urban Areas<br />

Km2<br />

13.14<br />

7.92<br />

0.80<br />

2.80<br />

27.08<br />

Suburb Areas<br />

km2<br />

83.07<br />

6.49<br />

20.59<br />

6.36<br />

186.27<br />

7.12<br />

56.57<br />

45.36<br />

411.83


T<br />

N<br />

O<br />

S<br />

E<br />

G<br />

M<br />

E<br />

A<br />

N<br />

C H<br />

E<br />

Y<br />

BOENG<br />

TUMPUN<br />

BOENG KAK<br />

BOENG<br />

TRABEK<br />

New Garden<br />

rehabilitated road<br />

rehabilitated historical Building<br />

New Market<br />

Road improvement in action


<strong>PHNOM</strong> <strong>PENH</strong> SOCIO-ECONOMIC SOCIO ECONOMIC DATA<br />

Item<br />

GDP per capita<br />

Population:<br />

Employment:<br />

Motorvehicle :<br />

Unit<br />

USD<br />

Thousand<br />

Thousand<br />

unit<br />

2000<br />

215<br />

1,152<br />

568<br />

35,639<br />

2005<br />

267<br />

1,373<br />

706<br />

49,000<br />

2010<br />

350<br />

1,611<br />

830<br />

78,000<br />

2015<br />

447<br />

1,820<br />

1,006<br />

136,000


LEGEND:<br />

0<br />

0.5<br />

Kilometers<br />

4<br />

: Low-rise<br />

: Mid-rise ( Walk-up type )<br />

: High-rise ( Moderate )<br />

: No designation<br />

1 2<br />

Development building construction policy<br />

3<br />

2<br />

1<br />

1-Low-rise zone up to threestory<br />

for historical area.<br />

2-Mid-rised zone of walk-up<br />

type for the central<br />

commercial centre area.<br />

3-High-rise zone with<br />

moderate height for office and<br />

commercial area.<br />

4-No designation zone.


Airport<br />

NR4<br />

Railway<br />

NR5<br />

NR3 Railway NR2<br />

NR6<br />

Legend:<br />

Existing and Proposed Plan (before 2015)<br />

Main arterial roads going out<br />

from the city center<br />

Proposed Plan (after 2015)<br />

NR21<br />

:Existing Urban Area of Phnom Penh<br />

:Proposed Residential Area<br />

:Existing and Proposed Light Industry<br />

:EPZ Freight Zone<br />

:Agriculture/ Green Belt<br />

:Shallow Land/ Blue Belt<br />

:Existing Airport<br />

:Proposed Road Construction/ Improvement<br />

:International Airport<br />

:EPZ, Freight Zone<br />

:Transit Station<br />

NR1<br />

:Railway Rehabilitation<br />

:Heavy Industry with New River Port<br />

:Proposed Road Construction<br />

0 5 10<br />

kilometers


<strong>PHNOM</strong> <strong>PENH</strong> CITY ROAD NETWORK


Classification of road length<br />

Functional<br />

Classification<br />

Principal Aterials<br />

Minor Arterials<br />

Collectors<br />

Local Street<br />

Total<br />

Total<br />

Length<br />

(Km)<br />

27.2<br />

26.8<br />

26.0<br />

230.9<br />

310.9<br />

Good<br />

10.9<br />

4.8<br />

2.1<br />

1.8<br />

19.6<br />

Composition by Condition<br />

Fair<br />

4.8<br />

4.6<br />

4.3<br />

1.9<br />

15.6<br />

Bad<br />

5.0<br />

7.2<br />

10.3<br />

19.6<br />

42.1<br />

Very Bad<br />

6.5<br />

10.2<br />

9.3<br />

207.6<br />

233.6


Problems<br />

- Incomplete road network<br />

- Traffic congestion on arterials<br />

- Lack of access to developing<br />

areas.<br />

- Lack of efficient public<br />

transport<br />

Outer Ring Road<br />

N R 4<br />

NR3<br />

Study Area<br />

NR2<br />

NR5<br />

Inner Ring Road<br />

Outer Ring Road<br />

Major Road<br />

Local Road<br />

NR6<br />

Problems<br />

- Poor pavement<br />

- Excess concentration of traffic on<br />

arterial .<br />

- Disordered and mixed traffic flow<br />

- No public transport<br />

- Lack of traffic management<br />

- Increase in traffic accident<br />

- Insufficient traffic signal<br />

N R1


Public Transport<br />

• Buses and taxi-buses provide mainly inter-city services (vans, pickup truck,<br />

sedans).<br />

•Moto-taxi<br />

• Tricycle<br />

• Moto-trailer using in suburb area- cheap transport means.<br />

• Two rail lines are operating as intra-city transport.<br />

Major issues<br />

• Transport system is carried out by private sector.<br />

• Not appropriate terminal for most of the buses and taxi-buses .<br />

• Moto taxi is the effective mode of transport in the present day, can cause<br />

traffic accident every day.<br />

• Tricycle cause a significant disturbance to the traffic flow due to their<br />

speed.<br />

• Moto-trailers are dangerous when operating in the road.


Characteristic of of Traffic Flow<br />

• Mixed traffic<br />

• Driving and pedestrian behaviour<br />

• Traffic flow and intersection<br />

• On-street/on-side walk Parking<br />

Issues :<br />

• Disordered flow<br />

• Limited Capacity of Roundabout<br />

• Many section required to be signalized<br />

• Lack of proper control measures.<br />

•Necessity of On-street Parking Control<br />

• Traffic accident<br />

•Insufficient Consideration of pedestrians<br />

•Lack of Traffic Safety Education


Present Traffic


Other Issues:<br />

• Legislation<br />

• Institutional Structure<br />

• Human Resource<br />

• Transport Operation<br />

• Financing


Transport Master Plan ( JICA’s Study, 2001)<br />

• Road development<br />

• Public Transport<br />

• Transport Control Management<br />

• Transport Legislation<br />

• Human Resource Development<br />

• Target Realization<br />

• Traffic efficiency Improvement<br />

• Economic Development<br />

• Urban Environment Development


NR4<br />

NR3<br />

8. Sak Sampov<br />

NR5<br />

U4. Boeng Salang Bridge<br />

U3. Stueng Mean Chey<br />

7 Prey Sa<br />

5. Wat Ha<br />

6. Wat Bakou Br<br />

NR2<br />

OR1. Ta Roath<br />

15. Anlong Kngan<br />

14. Bayab<br />

NR2-2. Preaek Kampis<br />

0<br />

Kilometers<br />

5 10<br />

City Road Development Plan<br />

U5. Boeng Trabaek<br />

1. Phum Mul<br />

2. Phum Kadal<br />

3. Phum Ralours<br />

4. Phum Bakou<br />

NR6<br />

U1. Japan Bridge<br />

U2. Monivong Bridge<br />

11. Preaek Pra<br />

12. Champous Khaek<br />

Legend:<br />

Existing Arterial Road<br />

Proposed Road<br />

Arterial Road<br />

NR21<br />

Collector<br />

Major Local Street<br />

Out of Study Area<br />

NR1<br />

10. Takhmau Steel Br<br />

9. Takhmau Conerete Br<br />

NR2-1. Preaek Ho<br />

OR2. Svay Ralom<br />

Project<br />

Arterials (A1-A13)<br />

- New Construction (4)<br />

-Improvement of Existing<br />

Roads (9)<br />

Collectors (C1- C11)<br />

- New Construction (3)<br />

-Improvement of Existing<br />

Roads (8)<br />

Local Roads (L1- L14)<br />

- New Construction (4)<br />

-Improvement of Existing<br />

Roads (10)<br />

Length<br />

(km)<br />

29.2<br />

72.6<br />

18.8<br />

51.3<br />

17.5<br />

41.6<br />

Cost<br />

(M.US<br />

$)<br />

29.2<br />

55.3<br />

15.0<br />

24.2<br />

8.8<br />

19.9<br />

Total 231.1 152.4


Comprehensive Public Transport<br />

System in 2015<br />

Development of New Minibus Terminal<br />

(Mode Interchange Area Between City and<br />

Intercity Minibus)<br />

Improvement of Pochentong<br />

International Airport<br />

Improvement of Access & Landside)<br />

Convert Pickup<br />

Type of Intercity<br />

Taxi-bus into New<br />

Feeder mode of Bus<br />

in the Suburban Area<br />

City Bus Route<br />

(minibus)<br />

Improvement of Railway System<br />

(strengthening of Freight System<br />

in Southern Line and Passenger Traffic,<br />

Improvement of Station Plaza at<br />

Phnom Penh Central Station)<br />

Improvement of Motorumok<br />

as a Feeder Transport for<br />

Minbus in the Suburban Area<br />

Intercity Bus Route (Minibus)<br />

Improvement of Existing Minibus Terminal<br />

(Mode Interchange Area Between City and<br />

Intercity Minibus)<br />

Improvement<br />

of River Transport<br />

Improvement of Station Plaza<br />

as a mode Interchange Area<br />

Improvement of Existing Bus Terminal<br />

(mode Interchange Area Between City<br />

and Intercity Bus)<br />

Trunck Bus System<br />

(High Transport efficiency and<br />

Environmental Friendly Bus System)<br />

Restructure of paratransit in CBD<br />

Legend<br />

Cyclo Operates in the Desgnated Area<br />

such as Turist Zone<br />

Introcuction of Zone System<br />

for Motodop<br />

City Bus Route<br />

Bus Terminal<br />

Railway<br />

River Transport<br />

Airport<br />

Concept of Mototaxi Operational Zone in<br />

the Urbanized Area in 2015<br />

Bus route<br />

Bus stop<br />

Zone Boundary<br />

Motodop cannot operate along trunk road<br />

even within the zone<br />

Mtodop cannot cross the zone boundary<br />

Motodop stand prepared at<br />

bus stop with side street


Pavement<br />

Improvem<br />

ent of<br />

St.63<br />

Pavement<br />

Improvem<br />

ent of<br />

St.105<br />

Prohibition of<br />

2-wheel<br />

Vehicles on<br />

Monivong Blvd<br />

Introduction of Public Transport- by JICA Study in 2002<br />

Phnom Penh Thmei<br />

Pochentong<br />

International<br />

Airport<br />

Stueng Mean Chey<br />

Market<br />

Line2<br />

Line4<br />

( NR4 )<br />

( Monivong )<br />

( Kampuchea Krom )<br />

Line4<br />

( Monireth )<br />

Japan Bridge<br />

Toul Kauk<br />

Line3<br />

Line2<br />

Line3<br />

( Mao Tse Toung )<br />

Central Market<br />

Line2<br />

( Kampuchea Krom )<br />

Line2<br />

( Sihanouk )<br />

Line1<br />

( Norodom )<br />

Line2<br />

Chva Ampav<br />

Line1<br />

( Monivong )<br />

Line2 ( Russia )<br />

Line4<br />

Line1<br />

Line2<br />

( Norodom )<br />

Central Market<br />

Line2<br />

Independent<br />

( Sihanouk ) Monument<br />

Line3<br />

Japan Bridge<br />

Chva Ampav<br />

Line1<br />

Cham Chao<br />

Phnom Penh Thmei<br />

O/D of Bus Route<br />

Terminal<br />

Turning Point<br />

Depot<br />

Line4<br />

( NR4 )<br />

Line5<br />

Stueng Mean Chey<br />

Toul Kouk<br />

Line3<br />

( Kampuchea Krom )<br />

Line1 ( Monivong )<br />

Line7<br />

Line9<br />

Line2<br />

Line5<br />

( Russia )<br />

Line3<br />

( Mao Tse Toung )<br />

Line6<br />

( Inner Ring Road )<br />

Line2<br />

Line6<br />

( Monireth )<br />

Line8<br />

( NR5 )<br />

Japan Bridge<br />

Line2<br />

Line5<br />

Line3<br />

Line7<br />

( NR2 )<br />

Preak Lieb<br />

Central Market<br />

( Norodom )<br />

Line2<br />

Hun Sen Park<br />

Chva Ampav<br />

Takmau<br />

Line9<br />

( NR6 )<br />

Chak Angrae Leu<br />

Legend<br />

35-36<br />

Note: Figures are 33-34<br />

Bus Stop Numbers<br />

31-32<br />

29-30<br />

(Cambodia-Japan Bridge)<br />

37-38<br />

27-28 (Central Market-East)<br />

(D.N.) 54 55 56 25-26<br />

53 41<br />

(Preah Monivong) 42<br />

52 23-24<br />

43<br />

51<br />

21-22<br />

19-20 44<br />

49 48<br />

45<br />

50<br />

46<br />

(Olympic Market) 47 (Independent Monument)<br />

17,17N-18<br />

(Preah Yukunthor)<br />

15-16<br />

13-14<br />

0 - 100<br />

MAO TSE TOUNG<br />

11-12<br />

100 - 250<br />

9-10<br />

250 - 500<br />

7-8<br />

500 - 1000<br />

5-6 1-2 (Chbar Ampauv)<br />

1000 - 1500<br />

1500 -<br />

(Boarding & alighting<br />

passengers/day)<br />

3-4<br />

Student is more than<br />

50% out of total<br />

passengers


Traffic management Plan<br />

Planning Concept:<br />

• To implement a comprehensive measure and to achieve a<br />

safe, smooth and comfortable road traffic environment for the<br />

road user in the city.<br />

Plans:<br />

• Traffic Engineering Plan<br />

• Signal Control and Operation plan<br />

• System for Traffic Accident Data base and Analysis<br />

• Parking Facility Plan<br />

• Traffic Safety Education<br />

• Traffic Enforcement<br />

• Environment Assessment<br />

• Environmental Legislation<br />

• Initial Environment Examination


Traffic Campaign and Safety Education


Road renovation of Phnom Penh


Public transport services - pickup


PRESENT TRAFFIC MANAGEMENT


THANK YOU

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!