05.04.2013 Views

MRD2 TENANT FITOUT DESIGN REVIEW - Westfield

MRD2 TENANT FITOUT DESIGN REVIEW - Westfield

MRD2 TENANT FITOUT DESIGN REVIEW - Westfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNIT NUMBER:<br />

RETAILER:<br />

Notes:<br />

STATUS DEFINITION<br />

A<br />

B<br />

C<br />

<strong>MRD2</strong> <strong>TENANT</strong> <strong>FITOUT</strong> <strong>DESIGN</strong> <strong>REVIEW</strong><br />

ZONE: RPM/RDM:<br />

LEVEL: <strong>REVIEW</strong>ER: Natalie Loveridge<br />

DATE RECEIVED REVISION DATE RETURNED CDD M&E SRUT<br />

A<br />

NOTE TO <strong>TENANT</strong><br />

CURRENT OVERALL<br />

STATUS<br />

To ensure prompt detailed design (RD2) approval, please fill in the grey FOR <strong>TENANT</strong> USE columns on the three following<br />

pages for the required outstanding information. Please return a copy with your revised detailed design submission.<br />

Status A signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted.<br />

Status B signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted subject to tenant taking necessary actions to incorporate the<br />

Landlords comments and annotations.<br />

Status C signifies that no work shall be fabricated manufactured or constructed. The tenant must submit new drawings to the landlord for review until resubmission is no longer<br />

required.


General Arrangement<br />

Shopfront<br />

Detail<br />

Life Safety<br />

Note<br />

Tenant Design Contact: Name:<br />

Email:<br />

Phone:<br />

UNIT NUMBER: 0 ZONE:<br />

0 RDM/RPM: 0 DATE <strong>REVIEW</strong>ED: 0<br />

RETAILER: 0 LEVEL: 0 <strong>REVIEW</strong>ER: Natalie Loveridge REVISION: A<br />

CHECKLIST<br />

Provide: GA Plan 1:50 scale for each level<br />

showing;<br />

All partitions with construction types, fire rating<br />

and fire doors<br />

Indication of Back of House ramps (if required)<br />

Provide: GA Section 1:50 scale cross and longitudinal<br />

Provide: Plans, sections, elevations and details of<br />

shopfront showing;<br />

Details of shopfront interfaces with landlord<br />

pilasters, bulkheads, walls, and floor at 1:10/1:5<br />

scale<br />

Glazing specification (if applicable)<br />

Provide: Details (where applicable) indicating;<br />

Tenant finishes over movement joint<br />

Any penetrations of landlords bulkhead (Level<br />

08 units)<br />

Provide: Sprinkler layout plan indicating;<br />

All areas of unit sprinklered including Back of<br />

House and store areas<br />

Underside of mezzanine sprinklered (If<br />

applicable)<br />

Provide: Indication of rear exit smoke lobby (if<br />

required) and means of escape<br />

Provide: Smoke curtain location and details (if<br />

required)<br />

Provide: Smoke fire stop and smoke containment<br />

details (if required)<br />

Provide: Indication of smoke extract grille in Front of<br />

House area (Level 08 units)<br />

Floor finishes zone: Ensure tenant floor build-up<br />

specification is in line with Tenant Floor Finishes<br />

Zone memo<br />

Other<br />

Other<br />

Other<br />

Other<br />

Other<br />

Other<br />

STATUS DEFINITION<br />

A<br />

B<br />

C<br />

<br />

Included<br />

<strong>MRD2</strong> CONSTRUCTION DETAIL <strong>DESIGN</strong> CHECKLIST<br />

Drawing number or<br />

document<br />

description<br />

Required for<br />

Approval<br />

(Y/N)<br />

Reviewed (A,<br />

B or C)<br />

COMMENTS<br />

Status A signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted.<br />

Included in<br />

revised<br />

submission<br />

<br />

OVERALL<br />

STATUS<br />

FOR <strong>TENANT</strong> USE<br />

Located on: (drawing<br />

number or document<br />

description)<br />

Status B signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted subject to tenant taking necessary actions to incorporate the Landlords<br />

comments and annotations.<br />

Status C signifies that no work shall be fabricated manufactured or constructed. The tenant must submit new drawings to the landlord for review until resubmission is no longer required.


Fire<br />

Electrical<br />

Mechanical<br />

Public Health<br />

Food (A3)<br />

Tenant M&E Contact: Name:<br />

Email:<br />

Phone:<br />

UNIT NUMBER: 0<br />

ZONE: 0 RDM/RPM: 0 DATE <strong>REVIEW</strong>ED: 0 OVERALL<br />

RETAILER: 0 LEVEL: 0 <strong>REVIEW</strong>ER: David Rasmussen/NDY REVISION: A<br />

STATUS<br />

UNIT AREA: SQM SQF UNIT TUP ALLOWANCE:<br />

0<br />

CHECKLIST<br />

Provide: Sprinkler layout & schematic drawings<br />

showing;<br />

Flow switch/zone check valve facility located<br />

inside tenancy<br />

System designed to BS EN 12845 and LPC<br />

requirements and installed by LPCB1048<br />

Accredited Contractor<br />

Sprinkler void protection provided<br />

Provide: Fire alarm layout & schematic showing;<br />

Fire panel location indicated<br />

Flashing beacon located at all rear entries of<br />

unit linked to tenant FIP<br />

Landlord and Tenant interface devices, including<br />

isolation of background music, mechanical<br />

systems etc.<br />

Automatic detection to L2+M (including voids)<br />

and sounders throughout<br />

Provide: Schematic electrical layout showing;<br />

Landlord interface (including fuse rating within<br />

switch-fuse and cable size to tenants board)<br />

Maximum Demand (provide load schedule if<br />

over TUP allowance)<br />

Provide: Schematic for heating and chilled water<br />

systems showing;<br />

Standard valving arrangement with 2-port<br />

control valves<br />

Flow rates not exceeding tenant allowance<br />

System pressure drops


Plan Layout<br />

Shopfront<br />

Vertical Transport<br />

New mezzanine<br />

/plant room floors<br />

Inter-tenancy<br />

Walls<br />

Tenant Structural Contact: Name:<br />

Email:<br />

Phone:<br />

UNIT NUMBER: 0 ZONE: 0 RDM/RPM: 0 DATE <strong>REVIEW</strong>ED: 0<br />

RETAILER:<br />

0 LEVEL: 0 <strong>REVIEW</strong>ER: Robert Vozila/MPN REVISION: A<br />

CHECKLIST<br />

All pits and penetrations dimensioned back to<br />

landlord grid<br />

Location and depth of any pockets or chases in<br />

floor slabs<br />

Set out of any items that have significant load<br />

and/or any items attached to landlord structure<br />

dimensioned back to landlord grid<br />

Provide: Reaction loads for;<br />

Any items that have significant load and/or any<br />

items attached to landlord structure<br />

dimensioned back to landlord grid<br />

Provide: Shopfront structural load calculations or<br />

certificate of glazing panels<br />

Plinth to spread escalator erection loads prior to<br />

installation<br />

STATUS DEFINITION<br />

A<br />

B<br />

C<br />

<br />

Included<br />

Provide: GA Plan at 1:50 scale for each floor showing,<br />

Provide: Plans (dimensioned back to landlord grid),<br />

sections, elevations and details of shopfront glazing<br />

Provide: Reaction loads of shopfront located on plan<br />

dimension back to landlord grid<br />

Provide: Additional secondary steel work<br />

Provide: Lift, stair and escalator details indicating;<br />

Weights, loads and calculations<br />

Provide: Method statement of escalator installation<br />

showing;<br />

Provide: Post and stair layout showing;<br />

Reaction loads on plan dimensioned back to<br />

landlord grid<br />

Provide: Lateral stability calculations<br />

Provide: Independent support details for;<br />

Any fixed shelving or furniture etc.<br />

NOTE: Fixing to landlord inter-tenancy walls is not<br />

permitted. Refer to guidelines in Tenant Fit-out<br />

Guide, Appendix 5, Item 2.<br />

Other<br />

Other<br />

Other<br />

Other<br />

Other<br />

<strong>MRD2</strong> STRUCTURAL <strong>DESIGN</strong> CHECKLIST<br />

Drawing number or<br />

document<br />

description<br />

Required for<br />

Approval<br />

(Y/N)<br />

Reviewed (A,<br />

B or C)<br />

COMMENTS<br />

Status A signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted.<br />

Included in<br />

revised<br />

submission<br />

<br />

OVERALL<br />

STATUS<br />

FOR <strong>TENANT</strong> USE<br />

Located on: (drawing<br />

number or document<br />

description)<br />

Status B signifies that fabrication, manufacture, or construction may proceed in accordance with drawing submitted subject to tenant taking necessary actions to incorporate the Landlords<br />

comments and annotations.<br />

Status C signifies that no work shall be fabricated manufactured or constructed. The tenant must submit new drawings to the landlord for review until resubmission is no longer required.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!