Appendix E-6: Consultation - Part 1 - Loup Power District

Appendix E-6: Consultation - Part 1 - Loup Power District

Appendix E-6: Consultation - Part 1 - Loup Power District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Loup</strong> River Hydroelectric Project ‐ FERC Project No. 1256<br />

Relicensing Correspondence<br />

DATE TYPE FROM TO SUBJECT<br />

February 23, 2012 Letter Neal Suess (LPD)<br />

March 2, 2012 Email Lisa Richardson (HDR)<br />

March 5, 2012<br />

Draft<br />

Meeting<br />

Notes<br />

Emily Smith (Winnebago<br />

Tribe of Nebraska)<br />

Frank Albrecht (NGPC), Jeff<br />

Runge (USFWS), Richard<br />

Holland (NGPC), Michelle<br />

Koch (NGPC), Robert Harms<br />

(USFWS), John Cochnar<br />

(USFWS)<br />

Historic Properties Management Plan<br />

Section 7 <strong>Consultation</strong><br />

HDR Meeting Attendees Section 7 ESA and Section 10J FPA – Meeting #3<br />

March 29, 2012 Letter Neal Suess (LPD) Brian Dunnigan (DNR) Bypass Flow Verification<br />

April 2, 2012 Email Lisa Richardson (HDR)<br />

Frank Albrecht (NGPC), Jeff<br />

Runge (USFWS), Richard<br />

Holland (NGPC), Michelle<br />

Koch (NGPC), Robert Harms<br />

(USFWS), Joel Jorgensen<br />

(NGPC)<br />

April 2, 2012 Letter Patrick Pope (NPPD) Neal Suess (LPD) Project Benefits<br />

Transmittal of Draft MOU for Headworks Dredging Operations